Case 3361017

23 Portland Street, Brighton, BN1 1RN

Brighton and Hove City Council — appeal dismissed

Outcome
Dismissed
Decision date
8 July 2025
Authority
Brighton and Hove City Council
Inspector
Burley P
Procedure
Written Representations
Casework type
Planning Appeal
Type detail
Planning Appeals - Full
Development type
Change of use
Appellant
Mr Nicholas Reid
LPA reference
BH2024/01708
ONS LPA code
E06000043
Jurisdiction
Transferred
Link status
Not Linked
Start date
13 March 2025

Summary AI

The appeal for a change of use from C3 to dual use C3/C4 was dismissed due to non-compliance with local policies. The inspector found that the proposal did not meet the criteria for mixed C3/C4 use and would provide unacceptable living conditions due to insufficient space standards.

Generated from the decision letter — check against the original before relying on it.

PDF text

Page 1 · Chunk 0 Appeal Decision

23 Portland Street, Brighton, BN1 1RN — Brighton and Hove City Council — Appeal Decision Site visit made on 24 June 2025 by P Burley BA(Hons) MPhil MRTPI an Inspector appointed by the Secretary of State Decision date: 8th July 2025 Appeal Ref: APP/Q1445/W/25/3361017 23 Portland Street, Brighton BN1 1RN • The appeal is made under section 78 of the Town and Country Planning Act 1990 (as amended) against a refusal to grant planning permission. • The appeal is made by Mr Nicholas Reid against the decision of Brighton & Hove City Council. • The application Ref is BH2024/01708. • The development proposed is the change of use from C3 to dual use C3/C4. Decision 1. The appeal is dismissed. Preliminary Matters 2. The appellant has submitted a revised version of the existing and proposed plans which clarifies how much of the loft bedroom has a ceiling height of 2.3m. These drawings do not amend the appeal scheme and I am satisfied that no party is prejudiced by me accepting them. 3. The planning application form states that the change of use has already taken place and I have considered the appeal on that basis. Main Issues 4.

Page 1 · Chunk 1 Appeal Decision

23 Portland Street, Brighton, BN1 1RN — Brighton and Hove City Council — Appeal Decision The main issues are whether the appeal scheme supports mixed and balanced communities and provides acceptable living conditions for the occupiers of the development with regard to internal living space. Reasons Mixed and Balanced Communities 5. Policy CP21 of Brighton & Hove City Council’s City Plan Part One (2016) (CPP1) states that applications for a change of use to a mixed C3/C4 use will not be permitted where more than 10% of dwellings within a radius of 50 metres of the application site are already in use as Class C4, mixed C3/C4 or other types of HMO in a sui generis use. 6. The Council has stated that the percentage of neighbouring properties in HMO use within the radius area is 13.16%. The appellant does not dispute this. 7. Policy DM7 of Brighton & Hove City Council’s City Plan Part Two (2022) (CPP2) states that applications for a mixed C3/C4 use will be permitted where the proposal complies with Policy CP21 and all of the five criteria in Policy DM7 are met. Both the Council and the appellant have noted that the appeal scheme does https://www.gov.uk/planning-inspectorate

Page 2 · Chunk 2 Appeal Decision

23 Portland Street, Brighton, BN1 1RN — Brighton and Hove City Council — Appeal Decision Appeal Decision APP/Q1445/W/25/3361017 not satisfy criterion c) of Policy DM7 which relates to the creation of a continuous frontage of three or more HMOs. 8. Neither Policy CP21 nor Policy DM7 set out any exceptions by which a proposal that does not comply with the criteria in those policies could be found to be acceptable. Therefore, I consider that the appeal scheme conflicts with both policies. Living Conditions 9. Another criterion of Policy DM7 requires compliance with the Nationally Described Space Standards (NDSS) which are set out in Policy DM1 of CPP2. 10. The Council has stated that if a room that is currently used as a study is used as a fourth bedroom it would be below the minimum space standard for a single bedroom. It has also said that it has not been provided with information to demonstrate that there is sufficient headspace for the bedroom in the roofspace. 11. The appellant has said that it is content for a planning condition to limit the occupancy of the HMO to a maximum of three persons and has provided examples of where planning permission has been granted for HMOs in Brighton subject to a condition which restricts occupancy. 12.

Page 2 · Chunk 3 Appeal Decision

23 Portland Street, Brighton, BN1 1RN — Brighton and Hove City Council — Appeal Decision It has also noted that 10.7m2 of the bedroom in the roofspace would have a ceiling height of 2.3m which exceeds the minimum floor area of 7.5m2 for a single bedroom in the NDSS. 13. Overall, I find that the appeal scheme would provide acceptable living conditions for the occupiers of the development with regard to internal space. In this respect it would not conflict with Policies DM1, DM7 and DM20 of CPP2 insofar as they relate to living conditions. Other Matters and Planning Balance 14. The appellant has argued the breach of the criteria in Policy CP21 and Policy DM7 does not translate to demonstrable harm to local amenity. With reference to the potential issues noted in paragraph 2.57 of CPP2 and the property’s history of operating as a small HMO with three tenants, the appellant has said that this demonstrates that any potential issues such as noise nuisance, parking pressure, or community disruption are minimal. 15. Whilst I acknowledge that the appeal site may have operated without demonstrable harm in respect of these considerations to date, this does not guarantee that such issues will not arise in the future. 16.

Page 2 · Chunk 4 Appeal Decision

23 Portland Street, Brighton, BN1 1RN — Brighton and Hove City Council — Appeal Decision Furthermore, these are not the sole considerations underlying the Council’s policy; the supporting text to Policy DM7 also notes (paragraph 2.61 of CPP2) that a balance must be struck between maintaining HMOs and permitting reversion to C3 family homes given demand for additional family housing in the city. 17. On that basis I conclude that the appeal scheme conflicts with CPP1 Policy CP21 and CPP2 Policy DM7. The lack of harm to the living conditions of the occupants of the development is neutral in the overall planning balance. I do not consider there to be any material considerations of sufficient weight to outweigh the conflict of the appeal scheme with the development plan when taken as a whole. https://www.gov.uk/planning-inspectorate 2

Page 3 · Chunk 5 Appeal Decision

23 Portland Street, Brighton, BN1 1RN — Brighton and Hove City Council — Appeal Decision Appeal Decision APP/Q1445/W/25/3361017

Page 3 · Chunk 6 INSPECTOR

23 Portland Street, Brighton, BN1 1RN — Brighton and Hove City Council — INSPECTOR https://www.gov.uk/planning-inspectorate 3

Extracted from the decision letter PDF and shown in full, chunk by chunk.

Main issues and findings

Other
Against appellant
¶5-8

The appeal scheme does not comply with Policy CP21, which prohibits mixed C3/C4 use where more than 10% of neighbouring properties are in HMO use. Additionally, the proposal does not meet the five criteria in Policy DM7, including the creation of a continuous frontage of three or more HMOs.

Living conditions
For appellant
¶13

The appeal scheme would provide acceptable living conditions for the occupiers of the development with regard to internal space, meeting the Nationally Described Space Standards.

Other
Against appellant
¶16-17

The appeal scheme conflicts with CPP1 Policy CP21 and CPP2 Policy DM7, which require compliance with the criteria for mixed C3/C4 use. The lack of harm to living conditions is neutral in the overall planning balance.

Policies relied on

Reference Weight
NPPF 208
Unclear
Policy CP21 of Brighton & Hove City Council’s City Plan Part One (2016)
Determinative
Policy DM7 of Brighton & Hove City Council’s City Plan Part Two (2022)
Determinative
Policy DM1 of CPP2
Substantial
Policy DM20 of CPP2
Moderate

Site constraints from the Casework Database

Conservation area
Green belt
Listed building setting
AONB
SSSI
Flooding an issue

Source

Decision letter, 3 pages, issued by the Planning Inspectorate on 8 July 2025 under the Open Government Licence.