Case 3363214

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW

North Lincolnshire Council — appeal allowed

Outcome
Allowed
Decision date
15 December 2025
Authority
North Lincolnshire Council
Inspector
Wraight G
Procedure
Written Representations
Casework type
Planning Appeal
Type detail
Planning Appeals - Outline
Development type
Other Major Developments
Appellant
Lindum Group Limited and Brocklesby Estate
LPA reference
PA/2021/2273
ONS LPA code
E06000013
Jurisdiction
Transferred
Link status
Not Linked
Start date
7 April 2025

Summary AI

The appeal was allowed due to the proposed development's compliance with policies on surface water drainage and the lack of technical evidence to support the Council's refusal. The inspector also considered the benefits of the development, including the creation of jobs and the provision of necessary services for road users.

Generated from the decision letter — check against the original before relying on it.

PDF text

Page 1 · Chunk 0 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision Site visit made on 18 November 2025 by Graham Wraight BA(Hons) MSc MRTPI an Inspector appointed by the Secretary of State Decision date: 15th December 2025 Appeal Ref: APP/Y2003/W/25/3363214 Land to the south of M180 Barnetby Top Interchange (Junction 5) and to the north and west of the A18 Easting: 505102 Northing :410781 • The appeal is made under section 78 of the Town and Country Planning Act 1990 (as amended) against a refusal to grant outline planning permission. • The appeal is made by Lindum Group Limited and Brocklesby Estate against the decision of North Lincolnshire Council. • The application Ref is PA/2021/2273. • The development proposed is Outline planning permission to construct a lorry park with up to 200 parking bays; erection of an amenity building; provision of a fuel filling station including the erection of a canopy and sales building comprising ancillary retail floor space; provision of electric vehicle forecourt and charging points; erection of up to two drive-thru restaurant units including associated car parking and access/exit from the A18 with scale, appearance, layout and landscaping reserved for subsequent consideration. Decision 1.

Page 1 · Chunk 1 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision The appeal is allowed and outline planning permission is granted to construct a lorry park with up to 200 parking bays; erection of an amenity building; provision of a fuel filling station including the erection of a canopy and sales building comprising ancillary retail floor space; provision of electric vehicle forecourt and charging points; erection of up to two drive-thru restaurant units including associated car parking and access/exit from the A18 with scale, appearance, layout and landscaping reserved for subsequent consideration at Land to the south of M180 Barnetby Top Interchange (Junction 5) and to the north and west of the A18, in accordance with the terms of the application, Ref PA/2021/2273, subject to the conditions in the attached schedule. Preliminary Matter 2. The application is submitted in outline form with all matters reserved for later consideration except for access. Therefore, whilst plans have been submitted suggesting how development of the type proposed could be accommodated on the site, these have been provided for indicative purposes only. Main Issues 3. The main issue is whether the proposed development could provide acceptable provision for surface water drainage. Reasons 4.

Page 1 · Chunk 2 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision The sole reason for refusal relates to a technical matter, namely that of surface water drainage. The appellant has provided a detailed assessment of this matter https://www.gov.uk/planning-inspectorate

Page 1 · Chunk 3 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision The sole reason for refusal relates to a technical matter, namely that of surface water drainage. The appellant has provided a detailed assessment of this matter https://www.gov.uk/planning-inspectorate

Page 2 · Chunk 4 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision Appeal Decision APP/Y2003/W/25/3363214 and they have set out how the impact that would arise from the proposed development could be addressed. There is no objection from the Environment Agency, the Lead Local Flood Authority or from Anglian Water to the proposal, subject to the imposition of planning conditions. None of those consultees are of the view that inadequate information has been provided at this stage and they do not object to the granting of planning permission. 5. The Council does not provide any technical assessment or expert comment to show that the conclusions of the appellant’s advisors and the relevant consultees should be discounted and that their position on surface water drainage should be preferred. Furthermore, it is not adequately explained why any additional information required cannot be secured by the imposition of planning conditions, as is suggested by the relevant consultees. Interested parties raise concern that there would be an increase in surface water run-off and flooding including in Barnetby, but this is not a concern based upon technical evidence. 6.

Page 2 · Chunk 5 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision As the appellant has provided detailed technical submissions which are backed by the relevant consultees, and the Council has provided nothing substantive to counter them, the Council’s position in refusing the planning application on surface water drainage grounds is not defensible. In conclusion, matters of surface water drainage have been adequately addressed, and this means that the proposed development would accord with Policy CS19 of the Core Strategy 2011 (CS) and Policies DS14 and DS16 of the North Lincolnshire Local Plan 2003 (LP), where collectively they seek to address matters of drainage and flood risk. Other Matters 7. There is a conflict with some of the policies of the development plan, owing primarily to the location of the development. However, a clear need has been established for the proposal and the services it would provide. Given the size of the development, its function and its need to be close to the strategic road network, the appeal site is an ideal position for such a facility to be located. There would inevitably be a reliance on motor vehicles to reach the site, but this is to be expected given its purpose to provide services for road users.

Page 2 · Chunk 6 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision The National Planning Policy Framework sets out at paragraph 114 that planning decisions should recognise the importance of providing adequate overnight lorry parking facilities, taking into account any local shortages, to reduce the risk of parking in locations that lack proper facilities or could cause a nuisance. I am satisfied that in terms of the principle of the development in this location, the benefits outweigh the conflict with the development plan that would arise. 8. There is one dwelling located immediately adjacent to the appeal site, but the submissions made by the appellant have satisfied the Council’s Environmental Protection team that acceptable mitigation can be put in place to safeguard the living conditions of its occupiers. The appeal site is otherwise well separated from other existing dwellings, and I am satisfied that it would not give rise to harm to living conditions in any other respect. The proposal is to serve an identified need associated with the strategic road network, but in any event the planning system does not serve to prevent competition between businesses.

Page 2 · Chunk 7 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision It is suggested by interested parties that the proposal would not create a sufficient number of jobs, but the appellant’s Planning Statement estimates that alongside the construction sector jobs, there would be between 58 and 75 full time equivalent jobs created. https://www.gov.uk/planning-inspectorate 2

Page 2 · Chunk 8 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision It is suggested by interested parties that the proposal would not create a sufficient number of jobs, but the appellant’s Planning Statement estimates that alongside the construction sector jobs, there would be between 58 and 75 full time equivalent jobs created. https://www.gov.uk/planning-inspectorate 2

Page 3 · Chunk 9 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision Appeal Decision APP/Y2003/W/25/3363214 That to my mind, along with the clear economic benefits that would arise, would be a substantial benefit of the proposed development. 9. There would be an impact on the landscape owing to the scale of what is proposed, but I find no reason to disagree with the findings of the Landscape and Visual Impact assessment that the impact would be no more than a low adverse impact on the most sensitive landscape and visual receptors. That conclusion is accepted by the Council, and I note in particular that the appeal site is in effect located within the significant road infrastructure already present in this area, which along with the landscaping proposed is a factor that would reduce its impact. I have no reason to consider that there would be any harm to the Lincolnshire Wolds National Landscape (previously known as an Area of Outstanding Natural Beauty) and Natural England did not object on that basis. Whilst reference is made by interested parties to proposals that the National Landscape be extended, the appeal site is not within such a protected landscape at the present time. Again, there is no objection from Natural England in that regard. 10.

Page 3 · Chunk 10 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision There would be likely to be some disruption during construction, however for any development of the scale proposed this is unavoidable. A condition requiring a Construction Environmental Management Plan could secure measures to minimise any impacts, in particular in terms of the living conditions of nearby residents. A condition could also be imposed to address concerns raised regarding litter. My attention has been drawn to a potential impact upon health and especially in terms of healthy eating. Aside from there being no substantive evidence to show that what is proposed would promote unhealthy eating, the appeal site is physically detached from the nearest settlements. It would therefore be in a location well away from schools and places that young people might be expected to gather. 11. There are many other concerns raised by interested parties which the Council did not consider to be matters on which the planning application should be refused. These include the impacts in terms of highway safety, traffic congestion, air and light pollution, noise, the sewage system, crime and anti-social behaviour, trees and woodlands, ecological interests and loss of agricultural land.

Page 3 · Chunk 11 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision On the basis of the technical reports before me and/or the consultation responses from the relevant consultees, I find no reason to take a different view that these are not matters which should be determinative on the outcome of the appeal. I have assessed the proposal before me on its own merits, and any future applications would need to be judged on the same basis. Conditions 12. Conditions setting out what are the reserved matters, the time period to submit those reserved matters, the period for commencing development and the approved plans are needed to provide certainty. Drawing number PD01 [Rev. P03] should not be an approved drawing, as other conditions require the submission and approval of a more detailed scheme of those works. It is reasonable and necessary to impose a condition requiring the reserved matters for landscaping to broadly accord with the details shown on the landscape masterplan drawing, as those works are presented as mitigation against the visual impacts of the proposal. 13. There are a number of conditions relating to the highway works that are necessary to make the proposed development acceptable in highway safety terms.

Page 3 · Chunk 12 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision I have amended the suggested conditions relating to the works to Junction 5 of the M180, https://www.gov.uk/planning-inspectorate 3

Page 3 · Chunk 13 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision I have amended the suggested conditions relating to the works to Junction 5 of the M180, https://www.gov.uk/planning-inspectorate 3

Page 4 · Chunk 14 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision Appeal Decision APP/Y2003/W/25/3363214 as the conditions as worded required both the submission of further details and implementation in accordance with details already submitted. Approval of those details must be by the local planning authority and so I have removed references to other bodies. The suggested condition requiring a construction traffic management plan required submission of the document before occupation, which would not secure the plan before construction. I have therefore amended the condition so that it serves the purpose intended. 14. I have added a requirement for a timescale for works to the suggested condition regarding amendments to the visibility screen to the A18 approach and the relocation of any street furniture, as the drafted condition did not set out any time period for those works to be implemented. The condition relating to the two accesses onto the A18 is acceptable in the form provided. Suggested conditions 12 and 13 replicate details that would be submitted and approved at reserved matters stage and therefore are not necessary. 15. Several conditions are required to address matters of surface and foul water drainage.

Page 4 · Chunk 15 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision A condition to address land contamination matters is necessary to ensure that the site is safe for future users and construction workers. Conditions setting out construction operation hours and requiring the submission of a construction environmental management plan are reasonable and necessary to safeguard the living conditions of those who reside in the vicinity of the site. In accordance with the recommendations of the Noise Impact Assessment submitted, details of an acoustic barrier, plant and machinery, a verification report and a noise management scheme are needed to protect living conditions. I have amended the suggested verification report condition as although it set out when the report was to be undertaken, it placed no time period on its submission to the local planning authority. 16. A condition regarding lighting is also required in the interests of living conditions. Conditions requiring further archaeological work are necessary in light of the findings of the reports already provided. A condition requiring works to be undertaken in accordance with the recommendations of the Preliminary Ecological Appraisal is needed to protect ecological interests.

Page 4 · Chunk 16 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision Although not a statutory requirement in this instance, a biodiversity net gain is required to comply with Policies LC5 of the LP and CS17 of the CS and therefore conditions are imposed to secure this. 17. A tree protection condition is needed to protect trees during construction. A time period for the implementation of landscaping is needed to set out the time period for this to take place. A condition requiring the retail space to remain ancillary to the approved fuel filling station is needed given the location of the appeal site away from existing centres. A condition requiring a litter management plan is reasonable to address concerns with respect to any litter generated by the proposed development. 18. I have not imposed the suggested condition requiring that all buildings on the site be single storey, as to my mind this is unclear in the context of what it would permit, as there would be the canopy of the fuel filling station which would need to be of a height to accommodate lorries. Scale is in any event a matter that is reserved for later consideration. https://www.gov.uk/planning-inspectorate 4

Page 5 · Chunk 17 Appeal Decision

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — Appeal Decision Appeal Decision APP/Y2003/W/25/3363214

Page 5 · Chunk 18 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR https://www.gov.uk/planning-inspectorate 5

Page 5 · Chunk 19 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR https://www.gov.uk/planning-inspectorate 5 Appeal Decision APP/Y2003/W/25/3363214 SCHEDULE OF CONDITIONS 1) Details of the appearance, landscaping, layout, and scale ("the reserved matters") shall be submitted to and approved in writing by the local planning authority before any development takes place and the development shall be carried out as approved. 2) Application for approval of the reserved matters shall be made to the local planning authority not later than three years from the date of this permission. 3) The development hereby permitted shall take place not later than two years from the date of approval of the last of the reserved matters to be approved. 4) The development hereby permitted shall be carried out in accordance with the following approved plans: - Site Location Plan Drawing no: 3060/P/001 Rev A - Location of Proposed Vehicular Accesses Drawing No: 001 Rev P0 5) The application(s) for approval of reserved matters for landscaping made pursuant to condition 1 shall be broadly in accordance with the following parameter plan: - Illustrative Landscape Masterplan Drawing no: N0811 (01) 001.

Page 6 · Chunk 20 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR 6) No development shall commence until the detailed design of the road works at Junction 5 of the M180, as shown in principle on drawing number PD01 [Rev P03], has been submitted to and approved in writing by the local planning authority. 7) The development hereby approved shall not be occupied or brought into use unless and until the scheme of road works at Junction 5 of the M180, as approved under condition 6 of this permission, has been implemented in full. 8) Unless otherwise agreed in writing by the local planning authority, construction of the development hereby approved shall not commence unless and until a Construction Traffic Management Plan has been submitted to and agreed in writing by the local planning authority. Thereafter, the construction shall be carried out in accordance with the agreed plan. 9) No development shall take place until details of, and a timescale for: - amendments to the visibility screen on the northbound A18 approach into Barnetby Interchange; and - the relocation of any street furniture; have been submitted to and approved in writing by the local planning authority. Once approved, the works shall be implemented in accordance with the approved details and timescale.

Page 6 · Chunk 21 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR 10) No development shall take place until details of the method of constructing the vehicular accesses to the site on the A18, including adequate visibility splays and traffic control measures to ensure left-in/left-out only manoeuvres, have https://www.gov.uk/planning-inspectorate 6

Page 6 · Chunk 22 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR 10) No development shall take place until details of the method of constructing the vehicular accesses to the site on the A18, including adequate visibility splays and traffic control measures to ensure left-in/left-out only manoeuvres, have https://www.gov.uk/planning-inspectorate 6

Page 7 · Chunk 23 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR Appeal Decision APP/Y2003/W/25/3363214 been submitted to and approved in writing by the local planning authority. All works approved shall be the subject of full engineering drawings that have been subject to a Stage Two Road Safety Audit. Thereafter, the approved scheme shall be implemented prior to any part of the development being brought into use. The schemes shall be implemented on site in accordance with the approved details. 11) No development shall take place until a detailed surface water drainage scheme for the site has been submitted to and approved in writing by the local planning authority. The scheme shall be based on sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the development. This must be based upon the submitted Flood Risk and Drainage Assessment project ref: CMH/JKW/45929_Rpt001 Revision A. The drainage scheme shall demonstrate that surface water run-off generated up to and including the 1 in 100 year critical storm (including an allowance for climate change which should be based on the current national guidance) will not exceed run-off from the existing site.

Page 7 · Chunk 24 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR It shall also include details of how the resulting completed scheme is to be maintained and managed for the lifetime of the development so that flood risk, both on and off the site, is not increased. SuDS must be considered. Reference should be made to the North Lincolnshire SuDS and Flood Risk Guidance Document. Should infiltration not be feasible at the site, alternative sustainable drainage should be used focusing on above- ground solutions. 12) The surface water drainage scheme shall be implemented in accordance with the approved details required by condition 11 above, completed prior to the occupation of any building within each phase or sub-phase of the development on site, and thereafter retained and maintained in accordance with the scheme for the lifetime of the development unless otherwise agreed in writing by the local planning authority. 13) No development shall take place until details showing an effective method of preventing surface water run-off from hard paved areas within the site onto the highway have been submitted to and approved in writing by the local planning authority.

Page 7 · Chunk 25 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR These facilities shall be implemented prior to the access and parking facilities being brought into use and thereafter so retained. 14) No development shall take place until details showing an effective method of preventing surface water run-off from the highway onto the developed site have been submitted to and approved in writing by the local planning authority. These facilities shall be implemented prior to the access and parking facilities being brought into use and thereafter so retained. 15) No development shall take place until a scheme for the disposal of foul water has been submitted to and approved in writing by the local planning authority and the development shall not be brought into use until it is connected to the approved foul water drainage system. 16) Unless otherwise agreed by the local planning authority, development other than that required to be carried out as part of an approved scheme of https://www.gov.uk/planning-inspectorate 7

Page 8 · Chunk 26 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR Appeal Decision APP/Y2003/W/25/3363214 remediation must not commence until parts 1 to 4 below have been complied with. If unexpected contamination is found after development has begun, development must be halted on that part of the site affected by the unexpected contamination to the extent specified by the local planning authority in writing until part 4 has been complied with in relation to that contamination. Part 1: Site Characteristics A Phase 1 desk study shall be carried out to identify and evaluate all potential sources of contamination and the impacts on land and/or controlled waters, relevant to the site. The desk study shall establish a 'conceptual model' of the site and identify all plausible pollutant linkages. Furthermore, the assessment shall set objectives for intrusive site investigation works/Quantitative Risk Assessment (or state if none required). Two full copies of the desk study and a non-technical summary shall be submitted to the local planning authority for approval prior to proceeding to further site investigation.

Page 8 · Chunk 27 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR An investigation and risk assessment, in addition to any assessment provided with the planning application, must be completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme are subject to the approval in writing of the local planning authority. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the local planning authority. The report of the findings must include: (i) a survey of the extent, scale, and nature of contamination; (ii) an assessment of the potential risks to: - human health; - property (existing or proposed) including buildings, crops, livestock, pets, woodland, and service lines and pipes; - adjoining land; - groundwaters and surface waters; - ecological systems; - archaeological sites and ancient monuments. (iii) an appraisal of remedial options, and a proposal of the preferred option(s). This must be conducted in accordance with Environment Agency’s Land Contamination Risk Management (LCRM) guidance October 2020.

Page 8 · Chunk 28 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR Part 2: Submission of Remediation Scheme A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared and is subject to the approval in writing of the local planning authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. Part 3: Implementation of Approved Remediation Scheme https://www.gov.uk/planning-inspectorate 8

Page 9 · Chunk 29 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR Appeal Decision APP/Y2003/W/25/3363214 The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the local planning authority. The local planning authority must be given two weeks’ written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report (referred to in PPS23 as a validation report) that demonstrates the effectiveness of the remediation carried out must be produced and is subject to the approval in writing of the local planning authority. Part 4: Reporting of Unexpected Contamination In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the local planning authority.

Page 9 · Chunk 30 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR An investigation and risk assessment must be undertaken in accordance with the requirements of Part 1, and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of Part 2, which is subject to the approval in writing of the local planning authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the local planning authority in accordance with Part 3. 17) Construction, demolition and site clearance operations shall be limited to the following days and hours: - 8am to 6pm Monday to Friday - 8am to 1pm on Saturdays. No construction, demolition or site clearance operations shall take place on Sundays or public holidays. HGV movements shall not be permitted outside these hours during the construction phase without prior written approval from the local planning authority. Installation of equipment on site shall not be permitted outside these hours without prior written approval from the local planning authority.

Page 9 · Chunk 31 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR 18) No stage of the development hereby permitted shall commence until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the local planning authority. The CEMP shall include the following: Noise and vibration – The CEMP shall set out the particulars of: (a) the works, and the method by which they are to be carried out; (b) the noise and vibration attenuation measures to be taken to minimise noise and vibration resulting from the works, including any noise limits; and (c) a scheme for monitoring the noise and vibration during the works to ensure https://www.gov.uk/planning-inspectorate 9

Page 9 · Chunk 32 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR 18) No stage of the development hereby permitted shall commence until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the local planning authority. The CEMP shall include the following: Noise and vibration – The CEMP shall set out the particulars of: (a) the works, and the method by which they are to be carried out; (b) the noise and vibration attenuation measures to be taken to minimise noise and vibration resulting from the works, including any noise limits; and (c) a scheme for monitoring the noise and vibration during the works to ensure https://www.gov.uk/planning-inspectorate 9

Page 10 · Chunk 33 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR Appeal Decision APP/Y2003/W/25/3363214 compliance with the noise limits and the effectiveness of the attenuation measures. Light – The CEMP shall set out the particulars of: (a) specified locations for contractors’ compounds and materials storage areas; (b) areas where lighting will be required for health and safety purposes; (c) the location of potential temporary floodlights; (d) the identification of sensitive receptors likely to be impacted upon by light nuisance; (e) proposed methods of mitigation against potential light nuisance, including potential glare and light spill, on sensitive receptors.

Page 10 · Chunk 34 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR Appeal Decision APP/Y2003/W/25/3363214 compliance with the noise limits and the effectiveness of the attenuation measures. Light – The CEMP shall set out the particulars of: (a) specified locations for contractors’ compounds and materials storage areas; (b) areas where lighting will be required for health and safety purposes; (c) the location of potential temporary floodlights; (d) the identification of sensitive receptors likely to be impacted upon by light nuisance; (e) proposed methods of mitigation against potential light nuisance, including potential glare and light spill, on sensitive receptors.

Page 10 · Chunk 35 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR Dust – The CEMP shall set out the particulars of: (a) site dust monitoring, recording and complaint investigation procedures; (b) the identification of receptors and the related risk of dust impact at all phases of the development, including when buildings and properties start to be occupied; (c) the provision of water to the site; (d) dust mitigation techniques at all stages of development; (e) the prevention of dust trackout; (f) communication with residents and other receptors; (g) a commitment to cease the relevant operation if dust emissions are identified either by regular site monitoring or by the local authority; (h) a ‘no burning of waste’ policy. 19) Prior to the operation of the development hereby permitted, if the property (Gallows Wood) located adjacent to the south-western boundary continues to remain in residential use, then an acoustic barrier shall be erected on the boundary of the site as shown in Figure 4 of the submitted report: Proposed service station with lorry park and drive-thru units – Noise Impact Assessment, Melton Road, Barnetby le Wold, Barnetby, DN38 6DW, Issued: April 2022, Delta-Simons Project No. 19-1934.03 Issue 2.

Page 10 · Chunk 36 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR A detailed technical specification of the acoustic barrier shall be submitted to and approved in writing by the local planning authority prior to its erection. The specification shall include details of the precise location, size and design of the barrier, with predicted noise reduction over the frequency spectrum. The approved acoustic barrier shall be installed prior to commencement of the use of the site and shall be maintained thereafter. 20) No fixed plant and/or machinery shall come into operation until details of the fixed plant and machinery serving the development hereby permitted, and any mitigation measures to achieve this condition, are submitted to and approved in writing by the local planning authority. Thereafter, only the approved scheme shall be implemented on the site. The total cumulative rating level of the noise emitted from the fixed plant shall not exceed existing background noise levels as determined in report Delta-Simons Project No. 19-1934.03, Issue 2, Dated April 2022. The noise levels shall be determined by measurement or calculation at the nearest noise sensitive premises. The measurements and assessment shall be made according to BS4142:2014. https://www.gov.uk/planning-inspectorate 10

Page 11 · Chunk 37 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR Appeal Decision APP/Y2003/W/25/3363214 21) Prior to the use of the development hereby permitted, and following installation of the fixed plant, acoustic barrier and mitigation measures in accordance with the approved technical specification report Delta-Simons Project No. 19- 1934.03, Issue 2, Dated April 2022, a verification report that demonstrates compliance with the fixed plant condition, acoustic barrier condition and effectiveness of the mitigation measures shall be undertaken. The verification report shall be submitted to the local planning authority before the development is first brought into use for their approval in writing. 22) The use of the site shall not begin until a written scheme for noise management has been submitted to and approved in writing by the local planning authority. The noise management scheme shall include but not be limited to the following: - hours of operation - details of activities to take place on site, including deliveries - plant and equipment to be used on site - likely noise levels associated with site activities, plant and equipment - noise mitigation measures to be employed and the resulting predicted level of noise at sensitive locations - complaints procedure.

Page 11 · Chunk 38 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR The operation of plant and all site activities shall take place in accordance with the approved noise management scheme. No changes shall be made to the approved noise management scheme unless agreed in writing by the local planning authority. 23) External lighting serving the proposed development shall be installed, operated and maintained in accordance with the document: External Lighting Environmental Impact Assessment, written by GWLC Lighting Consultancy dated 14/06/22.

Page 11 · Chunk 39 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR The operation of plant and all site activities shall take place in accordance with the approved noise management scheme. No changes shall be made to the approved noise management scheme unless agreed in writing by the local planning authority. 23) External lighting serving the proposed development shall be installed, operated and maintained in accordance with the document: External Lighting Environmental Impact Assessment, written by GWLC Lighting Consultancy dated 14/06/22.

Page 11 · Chunk 40 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR 24) No development shall commence until the approved mitigation strategy for preconstruction archaeological excavation and recording (Allen Archaeology, 19 December 2022) has been commissioned and its implementation secured, and until the following details have been submitted to the local planning authority for their written approval: (i) a timetable for the archaeological excavation works that provides sufficient notification and allowance of time to ensure the completion ahead of construction commencing in accordance with the strategy (ii) confirmation details of all staff involved in the implementation of the strategy, including sub-contractors and specialists, their responsibilities, and qualifications (iii) arrangements to notify the North Lincolnshire Historic Environment Officer of the commencement of archaeological works at least 10 working days before commencement and a schedule of visits to monitor such works.

Page 11 · Chunk 41 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR 25) The archaeological programme of work shall be carried out in accordance with the approved details and timings, and the approved development shall not become operational until the post investigation assessment has been completed and any further analysis commissioned, including provision for the publication and dissemination of results and archive deposition. https://www.gov.uk/planning-inspectorate 11

Page 11 · Chunk 42 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR 25) The archaeological programme of work shall be carried out in accordance with the approved details and timings, and the approved development shall not become operational until the post investigation assessment has been completed and any further analysis commissioned, including provision for the publication and dissemination of results and archive deposition. https://www.gov.uk/planning-inspectorate 11 Appeal Decision APP/Y2003/W/25/3363214 26) A copy of any analysis, reporting, publication, or archiving required as part of the approved mitigation strategy shall be deposited at the North Lincolnshire Historic Environment Record and the archive at the North Lincolnshire Museum within 18 months of commencement of the archaeological programme of work or such other period as may be agreed in writing by the local planning authority. 27) Works shall be carried out strictly in accordance with section 6.2 of the submitted Preliminary Ecological Appraisal document dated November 2021. 28) Within three months of the commencement of development, an updated biodiversity metric assessment and biodiversity management plan shall be submitted to the local planning authority for approval in writing.

Page 12 · Chunk 43 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR The document shall include: (a) an assessment of biodiversity loss based on submitted biodiversity metric 3.0 calculation; (b) details of measures required to provide at least 10% biodiversity net gain in accordance with the Defra biodiversity metric 3.0; (c) a description and evaluation of features to be created, enhanced and managed; (d) ecological trends and constraints on site that might influence management; (e) aims and objectives of management; (f) appropriate management options for achieving aims and objectives; (g) prescriptions for management actions; (h) preparation of a work schedule (including an annual work plan capable of being rolled forward over a five-year period); (i) details of the body or organisation responsible for implementation of the plan; (j) ongoing monitoring and remedial measures. The biodiversity management plan shall also include details of the legal and funding mechanism(s) by which the long-term implementation of the plan will be secured by the developer with the management body(ies) responsible for its delivery.

Page 12 · Chunk 44 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR The plan shall also set out (where the results from monitoring show that conservation aims and objectives of the biodiversity management plan are not being met) how contingencies and/or remedial action will be identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme. Biodiversity units need to be delivered on site, within the red and blue line boundaries shown on the approved Site Location Plan. 29) The biodiversity management plan shall be carried out in accordance with the approved details and timings, and the approved features shall be retained thereafter, unless otherwise approved in writing by the local planning authority. Within five years of the commencement of development, and at five-yearly intervals thereafter, a report shall be submitted to the local planning authority, providing evidence of compliance with the biodiversity management plan. https://www.gov.uk/planning-inspectorate 12

Page 13 · Chunk 45 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR Appeal Decision APP/Y2003/W/25/3363214 30) Before development is commenced, details of the method of protecting the existing trees on the site throughout the construction period shall be submitted to and approved in writing by the local planning authority, and such works as may be so approved shall be carried out before development is commenced, and maintained until completion of the development. None of the trees so protected shall be wilfully damaged or destroyed, uprooted, felled, lopped or topped, nor any other works carried out which would cause damage to the root systems or otherwise threaten the lives of the trees during the period of construction without the previous written consent of the local planning authority. Any trees removed without such consent, or dying, or being severely damaged, or becoming seriously diseased during that period shall be replaced in the next planting season with trees of such size and species that shall first have been agreed with the local planning authority. 31) All the approved landscaping shall be carried out within 12 months of development being commenced (unless a longer period is agreed in writing by the local planning authority).

Page 13 · Chunk 46 INSPECTOR

Roundabout, A18 spur to M180, MELTON ROSS, DN38 6DW — North Lincolnshire Council — INSPECTOR Any trees or plants which die, are removed or become seriously damaged or diseased within five years from the date of planting shall be replaced in the next planting season with others of similar size and species to those originally required to be planted, unless the local planning authority agrees in writing to any variation. 32) The retail space located within the approved fuel filling station shall remain ancillary to the fuel filling station at all times. 33) Before the approved development is brought into use, details of a litter management plan for the scheme, including the location and design of litter/waste disposal bins, signage and collection arrangements shall be submitted to and approved in writing by the local planning authority. Thereafter, the approved scheme shall be implemented on the site and retained. ----------------------------------------------End of Conditions---------------------------------------------- https://www.gov.uk/planning-inspectorate 13

Extracted from the decision letter PDF and shown in full, chunk by chunk.

Main issues and findings

Flood risk
For appellant
¶4

The inspector found that the appellant had provided a detailed assessment of surface water drainage, which addressed the concerns raised by the Council. The relevant consultees did not object to the proposal, and the Council had not provided any technical evidence to support its refusal.

Ecology and biodiversity
For appellant
¶28

The inspector required an updated biodiversity metric assessment and biodiversity management plan to be submitted within three months of development commencement. The plan must provide a 10% biodiversity net gain and include measures for long-term implementation.

Heritage impact
Against appellant
¶24

The inspector required the implementation of an approved mitigation strategy for preconstruction archaeological excavation and recording, including a timetable for the archaeological excavation works and arrangements for notification of the commencement of works.

Trees and landscape
For appellant
¶30

The inspector required details of the method of protecting existing trees on the site throughout the construction period to be submitted and approved in writing. Works as may be approved must be carried out before development commencement and maintained until completion.

Living conditions
Against appellant
¶10

The inspector noted that there would be some disruption during construction, but that this was unavoidable. Conditions could be imposed to mitigate impacts on living conditions, including a Construction Environmental Management Plan and a noise management scheme.

Policies relied on

Reference Weight
Policy CS19 of the Core Strategy 2011 (CS) and Policies DS14 and DS16 of the North Lincolnshire Local Plan 2003 (LP)
Determinative

Site constraints from the Casework Database

Conservation area
Green belt
Listed building setting
AONB
SSSI
Flooding an issue

Source