Case 3372635

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG

Ribble Valley Borough Council — appeal allowed

Outcome
Allowed
Decision date
7 January 2026
Authority
Ribble Valley Borough Council
Inspector
Moulton E
Procedure
Hearing
Casework type
Planning Appeal
Type detail
Planning Appeals - Full
Development type
Minor Dwellings
Appellant
Mr Ronald Jackson
LPA reference
3/2025/0414
ONS LPA code
E07000124
Jurisdiction
Transferred
Link status
Not Linked
Start date
18 September 2025

Summary AI

The appeal was allowed due to the significant shortfall in the 5-year housing land supply and the location of the site being in an accessible location. The inspector found that the site is not a suitable location for the proposed development due to the conflict with local policy, but the benefits of the development outweighed the harm.

Generated from the decision letter — check against the original before relying on it.

PDF text

Page 1 · Chunk 0 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision Hearing held on 9 December 2025 Site visit made on 9 December 2025 by Elaine Moulton BA (Hons) BPl MRTPI an Inspector appointed by the Secretary of State Decision date: 7 January 2026 Appeal Ref: APP/T2350/W/25/3372635 Land to South of Chatburn Old Road, Chatburn, BB7 4QG • The appeal is made under section 78 of the Town and Country Planning Act 1990 (as amended) against a refusal to grant permission in principle. • The appeal is made by Mr Ronald Jackson against the decision of Ribble Valley Borough Council. • The application Ref is 3/2025/0414. • The development proposed is residential development of up to nine dwellings. Decision 1. The appeal is allowed and permission in principle is granted for residential development comprising a minimum of 1 dwelling and a maximum of 9 dwellings at Land to South of Chatburn Old Road, Chatburn BB7 4QG in accordance with the terms of the application, Ref 3/2025/0414, dated 23 May 2025. Preliminary Matters 2. The proposal is for permission in principle. Planning Practice Guidance (PPG) advises that this is an alternative way of obtaining planning permission for housing-led development.

Page 1 · Chunk 1 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision The permission in principle consent route has 2 stages: the first stage (or permission in principle stage) establishes whether a site is suitable in-principle, and the second (technical details consent) stage is when the detailed development proposals are assessed. This appeal relates to the first of these 2 stages. 3. The scope of the considerations for permission in principle is limited to location, land use and the amount of development permitted1. All other matters are considered as part of a subsequent Technical Details Consent application if permission in principle is granted. I have determined the appeal accordingly. Main Issues 4. The main issues are: a) Whether the site is a suitable location for the proposed development, having regard to local policy; and b) Whether any harm would be outweighed by other material considerations, in particular whether the Council can currently demonstrate a five-year housing land supply, the provision of affordable housing and economic benefits of the development. 1 PPG Permission in Principle Paragraph: 012 Reference ID: 58-012-20180615 https://www.gov.uk/planning-inspectorate

Page 2 · Chunk 2 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision Appeal Decision APP/T2350/W/25/3372635 Reasons Suitable location 5. Key Statement DS1 of the Core Strategy 2008 – 2028 (CS), adopted 16 December 2014, sets out a development strategy for the Borough. The strategy directs the majority of new housing development to an identified strategic site and the principal settlements of Clitheroe, Longridge and Whalley. In addition, it states that development will be focused towards Tier 1 Villages, which are the more sustainable of the defined settlements. The appeal site is, largely, outside of the defined boundary of Chatburn, which is identified as a Tier 1 Village. 6. CS Policy DMG2 indicates that outside of defined settlement areas, development must meet at least one of several considerations. CS Policy DMH3 states that within areas defined as open countryside, residential development will be limited to specified types. The main parties agree that, as the proposed development does not meet any of the listed considerations or exceptions, it does not accord with such policies. There is no evidence before me that would lead me to conclude differently. 7. Although within the open countryside, the appeal site adjoins the defined settlement boundary of Chatburn.

Page 2 · Chunk 3 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision Notwithstanding the gradients of the surrounding land, it has good pedestrian and cyclist access to the facilities and services it contains along the quiet Chatburn Old Road. Furthermore, the nearest bus stop is within a reasonable walking distance of the site which, according to the evidence before me, provides frequent bus services to and from the principal settlement of Clitheroe, as well as Skipton and Preston. 8. The future occupiers of the proposed development would not, therefore, be wholly reliant on the use of a private vehicle. As such, it would be in an accessible location. Nonetheless, it remains that the proposal conflicts with the policies identified above. 9. In conclusion, although in an accessible location, having regard to the identified conflict with CS policies DMG2 and DMH3, the site is not a suitable location for the proposed development. Other considerations Housing land supply 10. The main parties agree that the five-year housing land supply (5YHLS) should be calculated against local housing need using the standard method in the PPG, and that this equates to 311 dwellings per annum. There is also agreement that a 5% buffer applies. Based upon the evidence before me, I concur. 11.

Page 2 · Chunk 4 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision There is, however, disagreement between the main parties on two grounds. The first relates to how past over-supply of housing should be taken into consideration. The second issue relates to the extent of the deliverable supply. 12. It is the Council’s position that the 5YHLS requirement should be reduced by the over-supply of previous years, 536 dwellings, which would reduce the requirement to 204 dwellings per annum, or 214 dwellings when the 5% buffer is applied. The https://www.gov.uk/planning-inspectorate 2

Page 2 · Chunk 5 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision There is, however, disagreement between the main parties on two grounds. The first relates to how past over-supply of housing should be taken into consideration. The second issue relates to the extent of the deliverable supply. 12. It is the Council’s position that the 5YHLS requirement should be reduced by the over-supply of previous years, 536 dwellings, which would reduce the requirement to 204 dwellings per annum, or 214 dwellings when the 5% buffer is applied. The https://www.gov.uk/planning-inspectorate 2

Page 3 · Chunk 6 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision Appeal Decision APP/T2350/W/25/3372635 appellant contends that local housing need should not be reduced by over-supply. The effect of which would reduce the housing land supply position from 6.19 years, as advanced by the Council, to 4.05 years. 13. I acknowledge that the Framework and PPG do not rule out the use of past over- supply to reduce future housing requirements. Nevertheless, to adopt the approach of the Council, and that of the Inspectors in the decisions it has highlighted, would impede the achievement of the Government’s objective to significantly boost the supply of homes. I therefore find that the forward-facing approach adopted in the appeal decisions and local plan examination letters that have been referred to by the appellant to be the most appropriate. 14. Thus, it is my judgement that past over-supply should not be used to reduce local housing need requirements in this case. This should not be seen as penalising the Council, as has been suggested, rather, it is part of the solution to the acute housing crisis that exists nationally. 15.

Page 3 · Chunk 7 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision Turning to the second matter of disagreement, the extent of the deliverable supply, it is now agreed that 74 dwellings on the site of land at Accrington Road, Whalley should be included in the housing land supply. However, the appellant considers that development on three other sites is not deliverable within the 5-year period and should not count towards the 5YHLS. 16. The disputed site, land at Highmoor Farm, Clitheroe, has the benefit of outline planning permission. The sale of the site and the submission of a reserved matters application is, however, dependent upon the completion of an agreement with the Council to facilitate the creation of an appropriate access. For this reason, the applicant for the outline planning permission, states that the completion of the sale of the land and the submission of a reserved matters application before the outline permission expires are hopeful rather than guaranteed. At the Hearing the Council advised that progress had been made on the agreement, but that it was not yet completed. Furthermore, there is no evidence before me that a performance agreement is in place that sets out the timescale for approval of a reserved matters application and the discharge of conditions. 17.

Page 3 · Chunk 8 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision In my view, it has not been demonstrated that firm progress has been made towards approving the reserved matters and, accordingly, there is no clear evidence that housing completions will begin on the Highmoor Farm site within the five-year period. Therefore, 75 dwellings should be removed from the 5YHLS. 18. There is currently no planning permission on the disputed site of land at Wilpshire (Salisbury View), although I note that, following pre-application discussions, a planning application for 80 dwellings was submitted on 1 October 2025, to which no technical objections have been received from statutory consultees. Nonetheless, even if I were to agree that the appeal decision, that dismissed a development of 84 dwellings on this site, supports the density of the current proposal, this is not sufficient to demonstrate that it will be permitted, particularly considering the strong objections from the relevant Parish Councils that were brought to my attention. 19. Furthermore, although I note that the Council indicate that it is likely that the application would be determined by Planning Committee in January or February 2026, at the time of the Hearing a report had not been published on an agenda.

Page 3 · Chunk 9 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision As such, as well as there being no certainty as to whether the proposal will be https://www.gov.uk/planning-inspectorate 3

Page 3 · Chunk 10 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision As such, as well as there being no certainty as to whether the proposal will be https://www.gov.uk/planning-inspectorate 3 Appeal Decision APP/T2350/W/25/3372635 permitted, it is unclear when a decision will be made on the application. Consequently, there is no clear evidence that the projected number of dwellings on this site can be delivered within the 5-year period. 75 dwellings should therefore be removed from the 5YHLS. 20. The disputed site, Standen Littlemoor Phases 5 & 6, also has the benefit of outline planning permission and a reserved matters application was submitted in March 2022. However, approaching four years later it remains undetermined and, as confirmed by the Council at the Hearing, amended plans are awaited. Although the Council anticipates that the application will be determined in early 2026, in the absence of a planning performance agreement that sets out the timescale for approval of reserved matters there is no certainty in this regard. 21. It is apparent that the developers are constructing dwellings on Phases 2 to 4 of the Standon Littlemoor site, but a significant number are yet to be completed.

Page 4 · Chunk 11 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision Although the Council does not predict any completions on Phases 5 & 6 until year 5, it is my view that no robust evidence has been presented to demonstrate that development will be carried out on such later phases within 5 years. Accordingly, a further 41 dwellings should be removed from the 5YHLS. 22. I therefore find that, at this point in time, the deliverable supply of housing amounts to 1,130 dwellings, which, in combination with the consequences of not deducting past over-supply from the local housing need requirements, reduces the housing land supply position to 3.45 years. 23. The Council has consistently delivered more completions than required since 2014/15, and there is no compelling evidence before me to suggest that this will not continue. This is a material consideration that tempers the weight to be given to housing delivery as a benefit of the proposed development. Nonetheless, given the significant shortfall in the 5YHLS at this time, I afford substantial weight to the proposed provision of housing, given that it is in an accessible location. Affordable housing 24.

Page 4 · Chunk 12 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision The Council contends that because affordable housing could not be secured at this first, permission in principle, stage, the provision of on-site affordable housing should not be considered as a benefit that weighs in favour of the proposed development. Nevertheless, CS Key Statement H3 states that for developments of 5 or more dwellings (or sites of 0.2 hectares or more irrespective of the number of dwellings) on sites outside of the settlement boundaries of Clitheroe and Longridge, the Council will require 30% affordable units on-site. The policy also indicates that the Council will only consider a reduction in this level, to a minimum of 20%, where supporting evidence justifies it. 25. I note that, in a previous appeal decision on this site relating to the refusal of Technical Details Consent2, the Inspector found that a financial contribution towards off-site provision equivalent to the 20% minimum level set out in policy could be supported. Whilst acknowledging that financial circumstances can change over time, I see no reason why affordable housing in some form could not be secured in connection with the current proposal at the technical details consent stage.

Page 4 · Chunk 13 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision However, as there remains uncertainty as to the level of affordable housing 2 APP/T2350/W/23/3333973 https://www.gov.uk/planning-inspectorate 4

Page 4 · Chunk 14 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision However, as there remains uncertainty as to the level of affordable housing 2 APP/T2350/W/23/3333973 https://www.gov.uk/planning-inspectorate 4

Page 5 · Chunk 15 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision Appeal Decision APP/T2350/W/25/3372635 provision, this benefit carries limited weight in support of the proposed development. Economic benefits 26. There would be economic benefits arising from the construction of the proposed development, and expenditure by its future occupiers, which is quantified by the appellant. Although there is no certainty as to where the occupier expenditure would take place, it is reasonable to find that a considerable proportion would be spent in local shops, services and amenities given that they would be accessible and convenient. I therefore attach moderate weight to such benefits in favour of the proposed development. Other Matters 27. Interested parties have raised concerns regarding the potential effects of additional traffic along Chatburn Old Road. However, based on what is before me, I agree with the Council that there are no highway grounds that would support the conclusion that the appeal site is not suitable for residential development. Furthermore, no robust evidence has been presented to conclude that local infrastructure, such as schools, lack capacity to accommodate the proposed development. 28.

Page 5 · Chunk 16 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision I have also had regard to the other matters raised by interested parties, including the effect of the proposed development on the character and appearance of the area, the living conditions of nearby residents, a protected tree, wildlife and habitats, a public right of way and drainage. Nonetheless, these relate to the details, and not the principle, of the proposed development. Accordingly, they are matters for consideration at this appeal and will be dealt with at the second (technical details consent) stage. Planning Balance 29. The proposed development would conflict with the spatial strategy set out in the development plan as the site lies outside the settlement boundary of Chatburn. Furthermore, it would not meet any of the identified considerations or exceptions which are required for residential development to be acceptable in the open countryside. 30. I have found that the Council cannot demonstrate a 5YHLS. Accordingly, as set out in footnote 8 of the Framework, the most important policies of the development plan are considered to be out-of-date. Consequently, paragraph 11 d) of the Framework applies. 31.

Page 5 · Chunk 17 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision In its favour, the proposed development would make a modest contribution to the supply of housing, of up to 9 dwellings, in an accessible location. Given the significant shortfall in the 5YHLS at this time, I afford this substantial weight. Additionally, I attach moderate weight to its economic benefits and limited weight to the contribution that it could make in respect of affordable housing. 32. The adverse impact I have identified, arising from the conflict with the spatial strategy, would not significantly and demonstrably outweigh such benefits. Consequently, the presumption in favour of sustainable development applies and paragraph 11 d) indicates that permission should be granted. There are no other material considerations to override this finding. https://www.gov.uk/planning-inspectorate 5

Page 6 · Chunk 18 Appeal Decision

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Appeal Decision Appeal Decision APP/T2350/W/25/3372635 Conditions 33. The PPG makes it clear that it is not possible for conditions to be attached to a grant of permission in principle. Therefore, whilst I acknowledge that the conditions suggested by the Council all relate to matters within the scope of a permission in principle decision, I have not imposed them. Conclusion 34. For the reasons set out above, I conclude that the appeal should be allowed.

Page 6 · Chunk 19 Elaine Moulton

Land to the South of Chatburn Old Road, Chatburn, BB7 4QG — Ribble Valley Borough Council — Elaine Moulton INSPECTOR APPEARANCES FOR THE APPELLANT: Christian Hawley Barrister, No 5 Chambers Ben Pyecroft Emery Planning Caroline Payne Emery Planning FOR THE LOCAL PLANNING AUTHORITY: Erika Eden-Porter Head of Strategic Housing and Planning Stephen Kilmartin Principal Planning and Urban Design Officer Yvonne Smallwood Planning Policy Officer https://www.gov.uk/planning-inspectorate 6

Extracted from the decision letter PDF and shown in full, chunk by chunk.

Main issues and findings

Green belt
Against appellant
¶5

The site lies outside the settlement boundary of Chatburn, and development would conflict with the spatial strategy set out in the development plan.

Living conditions
Neutral

The inspector noted that the site is in an accessible location, but that the proposal conflicts with local policies.

Flood risk
Neutral

The inspector noted that the site is in an open countryside area, but that the proposal conflicts with local policies.

Highway safety
Neutral

The inspector agreed with the Council that there are no highway grounds that would support the conclusion that the appeal site is not suitable for residential development.

Ecology and biodiversity
Neutral

The inspector noted that the site is near a protected tree and wildlife habitats, but that these are matters for consideration at the second stage.

Affordable housing
For appellant
¶24-25

The inspector found that affordable housing in some form could be secured at the technical details consent stage, but that there is uncertainty as to the level of provision.

Other
For appellant
¶26

The inspector attached moderate weight to the economic benefits of the development, which would include expenditure by future occupiers in local shops, services, and amenities.

Planning obligations
Neutral

The inspector noted that the PPG makes it clear that it is not possible for conditions to be attached to a grant of permission in principle.

Policies relied on

Reference Weight
NPPF 208
Determinative
Local Plan DMG2
Substantial
Local Plan DMH3
Substantial

Site constraints from the Casework Database

Conservation area
Green belt
Listed building setting
AONB
SSSI
Flooding an issue

Source

Decision letter, 6 pages, issued by the Planning Inspectorate on 7 January 2026 under the Open Government Licence.