Case 3368108

2 Wheatsheaf Parade, St. Lukes Road, Windsor, Windsor And Maidenhead, SL4 2QH

Royal Borough of Windsor and Maidenhead — appeal dismissed

Outcome
Dismissed
Decision date
29 September 2025
Authority
Royal Borough of Windsor and Maidenhead
Inspector
Burley P
Procedure
Written Representations
Casework type
Planning Appeal
Type detail
Planning Appeals - Full
Development type
Minor offices/R&D/light industry
Appellant
Mr Abdullah Aksahin
LPA reference
25/00136
ONS LPA code
E06000040
Jurisdiction
Transferred
Link status
Not Linked
Start date
24 June 2025

Summary AI

The appeal for a single storey front extension and decking area was dismissed due to concerns about flood risk. The Environment Agency's standing advice and the local plan's policy on flood risk management were key considerations. The inspector noted that the design, scale, and siting of the appeal scheme may have been acceptable, but this did not override the need to consider the risk of flooding.

Generated from the decision letter — check against the original before relying on it.

PDF text

Page 1 · Chunk 0 Appeal Decision

2 Wheatsheaf Parade, St. Lukes Road, Windsor, Windsor And Maidenhead, SL4 2QH — Royal Borough of Windsor and Maidenhead — Appeal Decision Site visit made on 16 September 2025 by P Burley BA (Hons) MPhil MRTPI an Inspector appointed by the Secretary of State Decision date: 29 September 2025 Appeal Ref: APP/T0355/W/25/3368108 2 Wheatsheaf Parade, St Luke’s Road, Windsor SL4 2QH • The appeal is made under section 78 of the Town and Country Planning Act 1990 (as amended) against a refusal to grant planning permission. • The appeal is made by Mr A Aksahin against the decision of the Royal Borough of Windsor and Maidenhead. • The application Ref is 25/00136. • The development proposed is described as ‘proposed single storey front extension / decking area’. Decision 1. The appeal is dismissed. Main Issue 2. The main issue is whether the appeal scheme would increase the risk of flooding to the appeal site and elsewhere. Reasons 3. The appeal scheme is for minor development in flood zone 3. As such, the Environment Agency’s (EA) standing advice (SA) for minor extensions1 is relevant.

Page 1 · Chunk 1 Appeal Decision

2 Wheatsheaf Parade, St. Lukes Road, Windsor, Windsor And Maidenhead, SL4 2QH — Royal Borough of Windsor and Maidenhead — Appeal Decision Whilst a flood risk assessment (FRA) was submitted and this acknowledges a range of sources of flooding, it does not set out key information as advised by the SA and as set out in the EA’s Written Statement in respect of this appeal where, as statutory consultee, the EA also notes its objection to the appeal scheme. 4. As such the FRA does not adequately demonstrate that the appeal scheme would mitigate the risk of flooding to the appeal site and elsewhere and, therefore, the appeal scheme conflicts with Policy NR1 of the Royal Borough of Windsor and Maidenhead Borough Local Plan (2022) which relates to the management of flood risk. Other Matters 5. Although the design, scale, and siting of the appeal scheme may have been considered acceptable, this does not override the need to give full consideration to the risk of flooding. 6. Whilst the neighbouring property at 3 Wheatsheaf Parade features a similar extension, this was implemented before the adoption of the current local plan and the latest EA SA. Thus, the decision-making context is now materially different and 1 https://www.gov.uk/guidance/flood-risk-assessment-standing-advice#advice-for-minor-extensions https://www.gov.uk/planning-inspectorate

Page 2 · Chunk 2 Appeal Decision

2 Wheatsheaf Parade, St. Lukes Road, Windsor, Windsor And Maidenhead, SL4 2QH — Royal Borough of Windsor and Maidenhead — Appeal Decision Appeal Decision APP/T0355/W/25/3368108 therefore I do not consider that the neighbouring scheme creates a precedent that should influence my decision in this case. Conclusion 7. For the reasons given above the appeal should be dismissed.

Page 2 · Chunk 3 P Burley

2 Wheatsheaf Parade, St. Lukes Road, Windsor, Windsor And Maidenhead, SL4 2QH — Royal Borough of Windsor and Maidenhead — P Burley INSPECTOR https://www.gov.uk/planning-inspectorate 2

Extracted from the decision letter PDF and shown in full, chunk by chunk.

Main issues and findings

Flood risk
Against appellant
¶3

The flood risk assessment did not provide key information as advised by the Environment Agency's standing advice, and did not demonstrate that the appeal scheme would mitigate the risk of flooding.

Planning obligations
Against appellant
¶4

The appeal scheme conflicted with Policy NR1 of the Royal Borough of Windsor and Maidenhead Borough Local Plan, which relates to the management of flood risk.

Living conditions
Neutral

The design, scale, and siting of the appeal scheme may have been considered acceptable, but this did not override the need to give full consideration to the risk of flooding.

Heritage impact
Neutral
¶6

The neighbouring property's similar extension was not considered a precedent, as it was implemented before the adoption of the current local plan and the latest Environment Agency standing advice.

Policies relied on

Reference Weight
Policy NR1 of the Royal Borough of Windsor and Maidenhead Borough Local Plan (2022)
Determinative

Site constraints from the Casework Database

Conservation area
Green belt
Listed building setting
AONB
SSSI
Flooding an issue

Source