Case 3362579

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY

Erewash Borough Council — appeal dismissed

Outcome
Dismissed
Decision date
22 September 2025
Authority
Erewash Borough Council
Inspector
Storey P
Procedure
Written Representations
Casework type
Planning Appeal
Type detail
Planning Appeals - Full
Development type
Major dwellings
Appellant
Village Partnerships Ltd (in liquidation)
LPA reference
ERE/0522/0020
ONS LPA code
E07000036
Jurisdiction
Transferred
Link status
Not Linked
Start date
25 March 2025

Summary AI

The appeal was dismissed due to the lack of a mechanism to secure the financial contributions necessary to mitigate the development's impact on local infrastructure. The proposed development would conflict with policies in the Core Strategy, Local Plan, and the National Planning Policy Framework.

Generated from the decision letter — check against the original before relying on it.

PDF text

Page 1 · Chunk 0 Appeal Decision

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY — Erewash Borough Council — Appeal Decision Site visit made on 13 August 2025 by P Storey BA (Hons) DipTP MRTPI an Inspector appointed by the Secretary of State Decision date: 22 September 2025 Appeal Ref: APP/N1025/W/25/3362579 Land off Little Hallam Hill Grid Ref Easting: 446287; Grid Ref Northing: 340581 • The appeal is made under section 78 of the Town and Country Planning Act 1990 (as amended) against a refusal to grant planning permission. • The appeal is made by Village Partnerships Ltd (in liquidation) against the decision of Erewash Borough Council. • The application Ref is ERE/0522/0020. • The development proposed is full planning permission for the erection of affordable homes (Class C3), together with associated parking, landscaping, drainage, the layout of roads, footways and other associated works. Decision 1. The appeal is dismissed. Applications for Costs 2. An application for costs has been made by Village Partnerships Ltd (in liquidation) against Erewash Borough Council and is the subject of a separate decision. Main Issue 3. The main issue is whether the financial contributions towards secondary school places and open space are necessary to make the development acceptable in planning terms, having regard to the viability of the scheme.

Page 1 · Chunk 1 Appeal Decision

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY — Erewash Borough Council — Appeal Decision Reasons 4. Policies 18 and 19 of the Erewash Core Strategy, adopted March 2014 (the CS), and Policy H9 of the Erewash Local Plan Saved Policies 2005 (amended 2014) (the SP), collectively establish the principle that new development must be supported by the provision of infrastructure necessary to meet the needs it generates. These policies require development proposals to directly provide or contribute financially towards infrastructure such as education, community facilities, open space and healthcare, ensuring that the impact of growth is properly mitigated. 5. These policies are supported by the Developer Contributions (S.106) Supplementary Planning Document (the SPD), which identifies the infrastructure needs of the Borough, assesses the viability of new housing development to meet those needs, and provides guidance on expected contributions. These policies and guidance are aligned with paragraphs 58 and 59 of the National Planning Policy Framework (the Framework), and the Planning Practice Guidance (PPG) on Viability, which confirm that planning obligations must be necessary to make the https://www.gov.uk/planning-inspectorate

Page 2 · Chunk 2 Appeal Decision

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY — Erewash Borough Council — Appeal Decision Appeal Decision APP/N1025/W/25/3362579 development acceptable in planning terms, directly related to the development, and fairly and reasonably related in scale and kind. 6. The Council’s officer report explains that the financial contributions sought have been calculated using standard formulae set out in the SPD, which supports the relevant development plan policies. For greenfield sites in Ilkeston, the SPD identifies indicative contributions per dwelling of £2,300 for primary education, £2,400 for sustainable transport, and £300 for open space. Although these figures are not prescriptive, they provide a benchmark for assessing site-specific needs. 7. In this instance, Derbyshire County Council (DCC), as the Local Education Authority, confirmed that there is sufficient capacity in local primary schools and therefore no contribution is sought for primary education. However, a specific and evidenced need for additional secondary school places at Ilkeston Enterprise Academy has been identified, with a contribution of £109,488.28 sought to mitigate this impact. This figure, whilst higher than the SPD’s indicative education contribution of £59,800, is justified by up-to-date capacity assessments.

Page 2 · Chunk 3 Appeal Decision

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY — Erewash Borough Council — Appeal Decision Furthermore, when combined with the £7,800 sought for open space improvements, the total contribution remains below the SPD’s indicative overall contribution of £130,000, due to sustainable transport contributions not being sought in this case. 8. The appellant has not disputed the methodology used to calculate these contributions, nor challenged the necessity of the infrastructure itself. It has, however, noted that in more recent applications on the site, DCC has not sought contributions towards secondary school places. Nonetheless, this appeal must be determined based on the specific evidence provided. In this case, the evidence before me demonstrates that the secondary school contribution is necessary to mitigate the impact of the development, and the amount required has been quantified. No updated position has been provided to suggest otherwise, and I am provided with no compelling evidence to dispute the requested figures. Based on the available evidence, I am satisfied that the contributions sought would align with the provisions of the development plan, the Framework, and Regulation 122 of the Community Infrastructure Levy Regulations 2010 (as amended). 9.

Page 2 · Chunk 4 Appeal Decision

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY — Erewash Borough Council — Appeal Decision The officer report also acknowledges a request from the NHS for a healthcare contribution of £7,698. However, it concludes that this request would not meet the relevant legal tests. Accordingly, this contribution is not pursued and does not form part of the Council’s case. 10. In reviewing the appellant’s Financial Viability Assessment (FVA) and the associated evidence, I note uncertainty in the build cost figures relied upon by both the appellant and the Council. In their review of the FVA, the Council’s appointed assessors based their appraisal on the assumption of a ‘JCT’ contract priced at £3.675m. However, the appellant has advised that they have no knowledge of this contract. The effect of the Council’s assumption was to exclude certain costs noted in the appellant’s FVA, as they were assumed to be included within the JCT figure as part of the overall construction cost. Whilst this approach made the scheme appear more viable, it appears to have been based on inaccurate information. 11. By contrast, the appellant’s construction cost evidence is derived from a dated cost plan indexed against industry standards, with additional allowances for associated costs.

Page 2 · Chunk 5 Appeal Decision

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY — Erewash Borough Council — Appeal Decision Whilst the build costs appear to align with industry benchmarks, the figures https://www.gov.uk/planning-inspectorate 2

Page 2 · Chunk 6 Appeal Decision

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY — Erewash Borough Council — Appeal Decision Whilst the build costs appear to align with industry benchmarks, the figures https://www.gov.uk/planning-inspectorate 2

Page 3 · Chunk 7 Appeal Decision

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY — Erewash Borough Council — Appeal Decision Appeal Decision APP/N1025/W/25/3362579 are not secured by a binding contract or firm pricing. Furthermore, the appellant has factored in a 10% profit margin, despite acknowledging that a margin of 6-8% would ordinarily be considered reasonable for an affordable scheme. Whilst the risks associated with challenging market conditions are acknowledged, this higher assumption, combined with the reliance on indexed rather than fixed costs, introduces ambiguity which limits the weight that can be attached to the appellant’s FVA. 12. The PPG is clear that where up-to-date policies set out the contributions expected from development, such schemes should be assumed to be viable. It is up to the applicant to demonstrate whether particular circumstances justify the need for a viability assessment at the application stage. Any such assessment should be supported by appropriate evidence, with assumptions that are transparent and reasonable. The PPG also emphasises that viability should not compromise sustainable development, and that the price paid for land is not a justification for failing to comply with policy requirements. 13.

Page 3 · Chunk 8 Appeal Decision

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY — Erewash Borough Council — Appeal Decision In this case, the evidence of both main parties lacks clear, consistent and robust cost evidence, undermining confidence in the FVA. I therefore attach only limited weight to its conclusions in determining the appeal. 14. The appellant has submitted a Unilateral Undertaking which seeks to secure all 26 proposed units as affordable housing. This represents a significant benefit, particularly in the context of the Council’s lack of a five-year housing land supply. However, in addition to my previous findings in relation to the FVA, the scheme would rely on grant funding to be delivered. No compelling evidence has been provided to demonstrate the likelihood of such funding being secured. This raises concerns about the deliverability of the scheme and undermines the weight that can be attributed to its benefits. 15. In any event, no completed mechanism has been provided to secure the infrastructure contributions. Therefore, the key issue is whether those contributions are necessary to make the development acceptable in planning terms, taking into account the benefits of the proposal and all other material considerations, including viability. 16.

Page 3 · Chunk 9 Appeal Decision

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY — Erewash Borough Council — Appeal Decision The provision of affordable housing alone does not constitute sustainable development if the infrastructure necessary to support that development is not secured. The Framework makes clear that infrastructure delivery is a fundamental component of sustainable development. Paragraph 8 identifies the social objective of the planning system as supporting strong, vibrant, and healthy communities by ensuring that development is accompanied by accessible services and open spaces that reflect current and future needs. Paragraph 35 further states that plans should set out the contributions expected from development, including for education, health, transport, and other essential infrastructure. These provisions reinforce the principle that development should not proceed in the absence of the infrastructure necessary to support it, and that securing such infrastructure is integral to delivering sustainable development as defined by the Framework. 17. Having regard to all relevant policies, guidance, and material considerations, I find that the delivery of 26 affordable homes carries substantial weight in favour of the proposal, particularly in light of the Council’s shortfall in housing land supply.

Page 3 · Chunk 10 Appeal Decision

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY — Erewash Borough Council — Appeal Decision However, this benefit is tempered by the uncertainty surrounding the scheme’s https://www.gov.uk/planning-inspectorate 3

Page 3 · Chunk 11 Appeal Decision

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY — Erewash Borough Council — Appeal Decision However, this benefit is tempered by the uncertainty surrounding the scheme’s https://www.gov.uk/planning-inspectorate 3 Appeal Decision APP/N1025/W/25/3362579 deliverability and the extent to which those benefits would be realised. Crucially, given the limited weight I attach to the FVA, the absence of any mechanism to secure the financial contributions necessary to mitigate the development’s impact on local infrastructure represents a significant and unresolved harm. The infrastructure required to support the development has been clearly identified and quantified, and its delivery is integral to ensuring that the proposal constitutes sustainable development. Applying the tilted balance under paragraph 11.d) of the Framework, I find that the adverse impacts of granting permission without securing the necessary infrastructure contributions would significantly and demonstrably outweigh the benefits, when assessed against the policies in the Framework taken as a whole. 18. Accordingly, I conclude that the financial contributions sought are necessary to make the development acceptable in planning terms, and it has not been convincingly demonstrated that it would be unviable to deliver these contributions.

Page 4 · Chunk 12 Appeal Decision

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY — Erewash Borough Council — Appeal Decision In their absence, the development would fail to mitigate its impacts, would place unacceptable additional pressure on services, and would not constitute sustainable development. The proposed development would therefore conflict with Policies 18 and 19 of the CS, Policy H9 of the SP, the guidance in the SPD, and the provisions of the Framework and PPG, the aims of which have previously been set out. Conclusion 19. For the reasons given above I conclude that the appeal should be dismissed.

Page 4 · Chunk 13 P Storey

Land off Little Hallam Hill, Ilkeston, Derbyshire, DE7 4EY — Erewash Borough Council — P Storey INSPECTOR https://www.gov.uk/planning-inspectorate 4

Extracted from the decision letter PDF and shown in full, chunk by chunk.

Main issues and findings

Housing land supply
Against appellant
¶17

The delivery of 26 affordable homes carries substantial weight in favour of the proposal, particularly in light of the Council’s shortfall in housing land supply.

Affordable housing
For appellant
¶14

The appellant has submitted a Unilateral Undertaking which seeks to secure all 26 proposed units as affordable housing.

Planning obligations
Against appellant
¶18

The financial contributions sought are necessary to make the development acceptable in planning terms.

Other
Against appellant
¶13

The evidence of both main parties lacks clear, consistent and robust cost evidence, undermining confidence in the FVA.

Policies relied on

Reference Weight
Policy 18 and 19 of the Erewash Core Strategy
Determinative
Policy H9 of the Erewash Local Plan Saved Policies 2005
Determinative
Paragraph 8 of the National Planning Policy Framework
Moderate
Paragraph 35 of the National Planning Policy Framework
Moderate

Site constraints from the Casework Database

Conservation area
Green belt
Listed building setting
AONB
SSSI
Flooding an issue

Source

Decision letter, 4 pages, issued by the Planning Inspectorate on 22 September 2025 under the Open Government Licence.