Case 3361925

West View, North Bank, Haydon Bridge , NE47 6NA

Northumberland County Council — appeal dismissed

Outcome
Dismissed
Decision date
25 June 2025
Authority
Northumberland County Council
Inspector
Cross D
Procedure
Written Representations
Casework type
Planning Appeal
Type detail
Planning Appeals - Full
Development type
Change of use
Appellant
Mr Graeme Scantlebury
LPA reference
24/02917/AGTRES
ONS LPA code
E06000057
Jurisdiction
Transferred
Link status
Not Linked
Start date
17 March 2025

Summary AI

The appeal was dismissed as the proposed works for converting an agricultural building to residential use would involve rebuilding, exceeding what was reasonably necessary for a conversion.

Generated from the decision letter — check against the original before relying on it.

PDF text

Page 1 · Chunk 0 Appeal Decision

West View, North Bank, Haydon Bridge , NE47 6NA — Northumberland County Council — Appeal Decision Site visit made on 5 June 2025 by David Cross BA(Hons) PgDip(Dist) TechIOA MRTPI an Inspector appointed by the Secretary of State Decision date: 25 June 2025 Appeal Ref: APP/P2935/W/25/3361925 West View, North Bank, Haydon Bridge NE47 6NA • The appeal is made under section 78 of the Town and Country Planning Act 1990 (as amended) against a refusal to grant approval required under Article 3(1) and Schedule 2, Part 3, Class Q of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (the GPDO). • The appeal is made by Mr Graeme Scantlebury against the decision of Northumberland County Council. • The application Ref is 24/02917/AGTRES. • The development proposed is change of use of agricultural building to residential use. Decision 1. The appeal is dismissed. Preliminary Matters 2. On the application form, it is confirmed that the application will use the permitted development right as it stood prior to 21 May 2024. I have proceeded to determine this appeal on that basis. Main Issue 3.

Page 1 · Chunk 1 Appeal Decision

West View, North Bank, Haydon Bridge , NE47 6NA — Northumberland County Council — Appeal Decision The main issue is whether the proposal would be permitted development under the provisions of Class Q of the GPDO, more specifically would the building operations be considered reasonably necessary to convert the building to a use falling within Class C3 of the Use Classes Order (UCO). Reasons 4. The description of the proposal refers to a change of use of an agricultural building to a residential use. The application form indicates that the proposal includes building works or other operations. Class Q(b) of the GPDO includes building operations which are reasonably necessary to convert the building to a use falling within Class C3 of the UCO. The GPDO at paragraph Q.1(i) includes a range of building operations, but also states that these should be to the extent reasonably necessary for the building to function as a dwellinghouse. 5. As set out in the Planning Practice Guidance1 (the Guidance), it is not the intention of the permitted development right to allow rebuilding work which would go beyond what is reasonably necessary for the conversion of the building to residential use.

Page 1 · Chunk 2 Appeal Decision

West View, North Bank, Haydon Bridge , NE47 6NA — Northumberland County Council — Appeal Decision Therefore, it is only where the existing building is already suitable for conversion to residential use that the building would be considered to have the permitted 1 Paragraph: 105 Reference ID: 13-105-20180615 https://www.gov.uk/planning-inspectorate

Page 1 · Chunk 3 Appeal Decision

West View, North Bank, Haydon Bridge , NE47 6NA — Northumberland County Council — Appeal Decision Therefore, it is only where the existing building is already suitable for conversion to residential use that the building would be considered to have the permitted 1 Paragraph: 105 Reference ID: 13-105-20180615 https://www.gov.uk/planning-inspectorate

Page 2 · Chunk 4 Appeal Decision

West View, North Bank, Haydon Bridge , NE47 6NA — Northumberland County Council — Appeal Decision Appeal Decision APP/P2935/W/25/3361925 development right. The difference between a conversion and a rebuild has also been discussed in the Hibbitt2 judgment. 6. A Structural Survey3 submitted by the appellant specifies that the building structure is capable of conversion to a dwelling. The proposed works involve the retention of existing frame, floor and blockwork but would replace the cement cladding with wood composite cladding and a zinc roof. Therefore, although some elements of the existing structure would be retained, the proposed new materials would cover almost the entire external envelope of the building including the roof. 7. Substantial works can fall within the scope of Class Q. But they should still comprise of a conversion of the building rather than a rebuild, and I have had regard to Hibbitt and the Guidance on this matter. The nature and extent of the proposed building operations involve rebuilding work which would go beyond what is reasonably necessary to convert the building to a residential use and would in effect represent a rebuild.

Page 2 · Chunk 5 Appeal Decision

West View, North Bank, Haydon Bridge , NE47 6NA — Northumberland County Council — Appeal Decision Even if the frame and other elements would be retained and would be capable of supporting the resultant building, as a matter of fact and degree the proposed operations exceed what could reasonably be described as a conversion. 8. The appellant refers to other buildings which they consider are similar to the appeal proposal and which have been converted with planning permission or allowed on appeal. But it has not been demonstrated that these were implemented via the prior approval process, or if they fully reflect the circumstances of the appeal proposal as well as the Guidance or the conclusions of Hibbitt. The Council also refers to inconsistencies in appeal decisions for barn conversions elsewhere. In any event, I have determined this appeal on its individual merits based on the evidence before me. 9. Reference is also made to pre-application comments from the Council which preceded a previous planning application for the site. However, these comments refer to a limited change in the materials which does not reflect the circumstances of the appeal before me. Furthermore, such pre-application discussions are undertaken without prejudice to the decision that the Council may make on a subsequent application.

Page 2 · Chunk 6 Appeal Decision

West View, North Bank, Haydon Bridge , NE47 6NA — Northumberland County Council — Appeal Decision The Council’s pre-planning application comments do not lead me to a different conclusion on the proposal based upon what I have seen and read in respect of this prior approval application. 10. I therefore conclude that the proposal would not be permitted development under Schedule 2, Part 3, Class Q of the GPDO and that the appeal should be dismissed.

Page 2 · Chunk 7 David Cross

West View, North Bank, Haydon Bridge , NE47 6NA — Northumberland County Council — David Cross INSPECTOR 2 Hibbitt and another v Secretary of State for Communities and Local Government (1) and Rushcliffe Borough Council (2) [2016] EWHC 2853 (Admin). 3 BT Bell Consulting Engineers: 24092 BTB SMW https://www.gov.uk/planning-inspectorate 2

Extracted from the decision letter PDF and shown in full, chunk by chunk.

Main issues and findings

Heritage impact
Against appellant
¶6

The proposed works involved replacing cement cladding with wood composite cladding and a zinc roof, covering almost the entire external envelope of the building, including the roof.

Heritage impact
Against appellant
¶7

Substantial works can fall within the scope of Class Q, but they should still comprise a conversion, not a rebuild. The proposed operations exceeded what could reasonably be described as a conversion.

Living conditions
Against appellant
¶8

The appellant's comparison to other buildings that were converted with planning permission or allowed on appeal was not persuasive, as it did not demonstrate that these were implemented via the prior approval process or fully reflect the circumstances of the appeal proposal.

Planning obligations
Against appellant
¶9

Pre-application comments from the Council were not relevant to the appeal, as they referred to a limited change in materials and were not applicable to the circumstances of the appeal.

Policies relied on

Reference Weight
Class Q of the GPDO, NPPF 208
Determinative
Hibbitt judgment, Planning Practice Guidance
Substantial

Site constraints from the Casework Database

Conservation area
Green belt
Listed building setting
AONB
SSSI
Flooding an issue

Source

Decision letter, 2 pages, issued by the Planning Inspectorate on 25 June 2025 under the Open Government Licence.