Case 3353550

Land adjacent to Adamswell Crossing, Broom Lane, Broadwater Forest, Tunbridge Wells, East Sussex, TN3 9JL

Wealden District Council — appeal dismissed

Outcome
Dismissed
Decision date
14 July 2025
Authority
Wealden District Council
Inspector
Knight A
Procedure
Written Representations
Casework type
Planning Appeal
Type detail
Planning Appeals - Full
Development type
Other minor developments
Appellant
Mr Christopher Morris
LPA reference
WD/2024/7014/AD
ONS LPA code
E07000065
Jurisdiction
Transferred
Link status
Not Linked
Start date
23 October 2024

Summary AI

The appeal was dismissed because the development had started before the prior approval application or appeal, making it ineligible for prior approval. The inspector did not consider the planning merits of the development as it was not relevant to the decision. This determination does not affect any future applications the appellant may make.

Generated from the decision letter — check against the original before relying on it.

PDF text

Page 1 · Chunk 0 Appeal Decision

Land adjacent to Adamswell Crossing, Broom Lane, Broadwater Forest, Tunbridge Wells, East Sussex, TN3 9JL — Wealden District Council — Appeal Decision Site visit made on 7 May 2025 by A Knight BA PG Dip MRTPI an Inspector appointed by the Secretary of State Decision date: 14 July 2025 Appeal Ref: APP/C1435/W/24/3353550 Land adjacent to Adamswell Crossing, Broom Lane, Broadwater Forest, East Sussex TN3 9JL • The appeal is made under section 78 of the Town and Country Planning Act 1990 (as amended) against a refusal to grant approval required under Article 3(1) and Schedule 2, Part 6, Class E of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). • The appeal is made by Mr Christopher Morris against the decision of Wealden District Council. • The application Ref is WD/2024/7014/AD. • The development proposed is forestry shelter and possible tool/equipment store for use on site. Decision 1. The appeal is dismissed. Preliminary Matters 2. The Council’s decision did not refer to the development having begun. I have invited and considered comments on this matter from both main parties. Main Issue 3. To benefit from the provisions of Schedule 2, Part 6, Class E of the General Permitted Development Order the proposed development must comply with the conditions set out in paragraph E.2. 4.

Page 1 · Chunk 1 Appeal Decision

Land adjacent to Adamswell Crossing, Broom Lane, Broadwater Forest, Tunbridge Wells, East Sussex, TN3 9JL — Wealden District Council — Appeal Decision This includes, at (a), that the developer must, before beginning the development, apply to the local planning authority for a determination as to whether prior approval will be required as to the siting, design and external appearance of the building and, at (c), that the development must not begin before the occurrence of either; a written notice of the Council’s determination that prior approval is not required; the giving of such approval, or; the expiry of 28 days following the date on which the application was received without the local planning authority notifying the applicant of their determination. In short, prior approval cannot be granted for development that has already begun, even if it is not completed1. 5. The main issue in this appeal is whether the prior approval application or appeal was made “before beginning the development” as required by conditions E.2(a) and (c). 1Winters v SSCLG & Havering LBC [2017] EWHC 357 (Admin). https://www.gov.uk/planning-inspectorate

Page 2 · Chunk 2 Appeal Decision

Land adjacent to Adamswell Crossing, Broom Lane, Broadwater Forest, Tunbridge Wells, East Sussex, TN3 9JL — Wealden District Council — Appeal Decision Appeal Decision APP/C1435/W/24/3353550 Reasons 6. The application includes several references to the erection of the cabin having already begun. Photographs of the partially completed cabin have been supplied, and I saw it for myself during my site visit. 7. The appellant feels they followed advice from the Council. In assessing the application, the Council focused on whether the cabin is reasonably necessary for the purposes of forestry. However, the development has already begun and so cannot benefit from prior approval. The appeal must therefore be dismissed, and it has not been necessary for me to form a view on whether the cabin is reasonably necessary. 8. Furthermore, given the context set out above the planning merits of the development are not material, and I have formed no view on them. This determination has no bearing on any application, whether for planning permission or otherwise, the appellant may subsequently make in respect of the cabin. 9. The appeal is dismissed.

Page 2 · Chunk 3 A Knight

Land adjacent to Adamswell Crossing, Broom Lane, Broadwater Forest, Tunbridge Wells, East Sussex, TN3 9JL — Wealden District Council — A Knight INSPECTOR https://www.gov.uk/planning-inspectorate 2

Extracted from the decision letter PDF and shown in full, chunk by chunk.

Main issues and findings

Planning obligations
Against appellant
¶4

The development must comply with conditions set out in paragraph E.2, including applying for prior approval before beginning development. This was not done.

Planning obligations
Against appellant
¶5

The main issue in this appeal was whether the prior approval application or appeal was made before beginning development. The development had already started.

Living conditions
Against appellant
¶6-7

Photographs showed the cabin was partially completed, and the inspector saw it during the site visit. The development had already begun, making it ineligible for prior approval.

Policies relied on

Reference Weight
General Permitted Development Order Schedule 2, Part 6, Class E
Determinative

Site constraints from the Casework Database

Conservation area
Green belt
Listed building setting
AONB
SSSI
Flooding an issue

Source

Decision letter, 2 pages, issued by the Planning Inspectorate on 14 July 2025 under the Open Government Licence.