Land East of 20 Bernard Road, fronting Latimer Road, Worthing, West Sussex, BN11 5EL
Worthing Borough Council — appeal dismissed
- Outcome
- Dismissed
- Decision date
- 26 February 2025
- Authority
- Worthing Borough Council
- Inspector
- Jolly J
- Procedure
- Written Representations
- Casework type
- Planning Appeal
- Type detail
- Planning Appeals - Full
- Development type
- Minor Dwellings
- Appellant
- Paul Nash Properties Ltd
- LPA reference
- AWDM/0947/23
- ONS LPA code
- E07000229
- Jurisdiction
- Transferred
- Link status
- Not Linked
- Start date
- 16 October 2024
Summary AI
The appeal was dismissed due to the proposed development's failure to meet flood risk policies, including the sequential test and the exception test. The inspector found that the benefits of the proposal did not outweigh the flood risk, and that the proposal conflicted with the development plan.
PDF text
Land East of 20 Bernard Road, fronting Latimer Road, Worthing, West Sussex, BN11 5EL — Worthing Borough Council — Appeal Decision Site visit made on 23 February 2025 by J E Jolly BA (Hons) MA MSc MCIH MRTPI an Inspector appointed by the Secretary of State Decision date: 26 February 2025 Appeal Ref: APP/M3835/W/24/3352190 Land East of 20 Bernard Road, Latimer Road, Worthing, West Sussex BN11 5EL • The appeal is made under section 78 of the Town and Country Planning Act 1990 against a refusal to grant planning permission. • The appeal is made by Mr P Nash against the decision of Worthing Borough Council. • The application Ref is ADWM/0947/23. • The development proposed is for the demolition of an existing garage and erection of a new chalet bungalow. Decision 1. The appeal is dismissed. Preliminary Matters 2. For clarity, I have used the address and description of development given on the Council’s decision notice. 3. The National Planning Policy Framework (the Framework) was revised in December 2024. The parties have had the opportunity to comment on the new document. Consequently, in reaching my decision I have therefore had regard to the new Framework, and any reference to Paragraph numbers are to this version. Main Issue 4. The main issue in this appeal is flood risk. Reasons 5.
Land East of 20 Bernard Road, fronting Latimer Road, Worthing, West Sussex, BN11 5EL — Worthing Borough Council — Appeal Decision The appeal site is a parcel of land located in a residential area which is found to the side of a dwelling that once formed part of the garden space associated with 20 Bernard Road. The proposal is to demolish a garage on the appeal site and construct a chalet bungalow with parking for two vehicles. 6. The appeal site is within an area benefitting from coastal flood defences. As such, the appellant’s updated Flood Risk Assessment (FRA) concluded that flood risk on the site would be minimal. Moreover, it is also a matter of agreement with the Council’s drainage engineer, that any surface water flooding could be managed by an appropriate and conditioned SuDs scheme. Furthermore, the proposed dwelling now meets the Environment Agency’s technical design requirements. https://www.gov.uk/planning-inspectorate
Land East of 20 Bernard Road, fronting Latimer Road, Worthing, West Sussex, BN11 5EL — Worthing Borough Council — Appeal Decision Appeal Decision APP/M3835/W/24/3352190 7. Nonetheless, while the Council acknowledge that flood risk on the appeal site would be ‘low’, the Environment Agency (EA) Flood Map shows that the proposed development would be within Flood Zones 2 and 3a. Paragraph 170 of the Framework states that inappropriate development in areas at risk of flooding should be avoided by directing development away from areas at highest risk. 8. In addition, Paragraph 172 of the Framework sets out the sequential risk-based approach that should be taken for proposals in areas known to be at risk now or in the future from any form of flooding, with the aim being to steer new development to areas with the lowest risk of flooding from any source. 9. However, the appellant contends that sequentially preferable sites within a lower flood risk zone than the appeal site that are developable for housing are not ‘reasonably available’ in the Borough, and even if it were to be otherwise, the FRA suggests that sites recorded in the Council’s Strategic Housing Land Availability Assessment (SHLAA) cannot be delivered within a 2-year timeframe. Therefore, the appellant argues that the proposal meets the sequential test set out in the Framework. 10.
Land East of 20 Bernard Road, fronting Latimer Road, Worthing, West Sussex, BN11 5EL — Worthing Borough Council — Appeal Decision Nevertheless, I have no substantiated evidence before me to persuade me that the SHLAA sites or indeed other private ‘windfall’ sites in Zone 1 are unavailable or undevelopable in a reasonable timeframe in order to contribute towards the Council’s housing targets. Indeed, the Council has not only brought to my attention that a review of the SHLAA identified that at least 26 SHLAA sites can be delivered within a relatively short time frame, but also that a number of sites have already been delivered. Additionally, while garden sites have been excluded, the confined extent of EA Flood Zones 2 and 3 in the Borough means that other small scale infill sites of lower flood risk than the appeal site are likely to be available for development. 11. In spite of this, the appellant has identified a town centre scheme1 which ‘passed’ the required sequential test located in Flood Zone 3 in support of his case.
Land East of 20 Bernard Road, fronting Latimer Road, Worthing, West Sussex, BN11 5EL — Worthing Borough Council — Appeal Decision However, whether under certain circumstances ‘windfall’ sites within higher Flood Risk Zones have been found by the Council to be acceptable or not, given that the proposed development would be on a residential garden type plot located in a different type of area altogether, and that Policy SS3 of the Worthing Local Plan (2023) (WLP) is clear that development is usually directed to the town centre, I give this matter little weight. 12. Therefore, given my findings above, the proposal does not meet the sequential test. It follows then that the application of the ‘Exception Test’ set out in Paragraph 178 of the Framework and the Planning Practice Guidance (the PPG), to this ‘more vulnerable’ site does not apply. 13. Accordingly, I conclude that the proposed development would fail to accord with local and national planning policy relating to flood risk, with specific reference to Policy DM20 of the WLP and the relevant provisions of the Framework set out above. 1 AWDM/1884/22 https://www.gov.uk/planning-inspectorate 2
Land East of 20 Bernard Road, fronting Latimer Road, Worthing, West Sussex, BN11 5EL — Worthing Borough Council — Appeal Decision Appeal Decision APP/M3835/W/24/3352190 Planning Balance 14. It has been brought to my attention by the appellant that the standard method for calculating housing need has been revised to support the Government’s housing delivery targets. Moreover, that Paragraph 11d of the new Framework broadens the circumstances under which the ‘tilted balance’ in favour of sustainable development is engaged. However, Footnote 7 of Paragraph 11 d(i) of the Framework is clear that certain sites, including those at risk of flooding, are to be protected. Therefore, even though the appeal site is ‘defended’, as the proposed dwelling would be in Flood Zone 2 and 3, and the risk of ‘over- topping or a catastrophic flood event cannot be fully eliminated, the ‘tilted balance’ is disengaged. 15. Nonetheless, the appellant contends as the proposal would make effective use of land the benefits of the proposal should be weighed against flood risk. As such, the appellant argues that the proposal would add economically to the vitality of the Borough and improve an unkempt garden site. Moreover, the development would be located in a well-connected area with good amenities and regular transport links to Worthing town centre.
Land East of 20 Bernard Road, fronting Latimer Road, Worthing, West Sussex, BN11 5EL — Worthing Borough Council — Appeal Decision Furthermore, whether rear garden infill plots have been excluded from housing delivery targets or not, it would also make a contribution to the Councils housing land supply. However, even in combination, the benefits provided by a modest single dwelling would be very minimal. I conclude therefore, any benefits associated with the proposal would not outweigh flood risk. Conclusions 16.The proposed development conflicts with the development plan taken as a whole, and as there are no material considerations of sufficient weight to indicate that a decision should be made other than in accordance with the development plan and the Framework, I conclude that the appeal should be dismissed.
Land East of 20 Bernard Road, fronting Latimer Road, Worthing, West Sussex, BN11 5EL — Worthing Borough Council — J E Jolly INSPECTOR https://www.gov.uk/planning-inspectorate 3
Main issues and findings
Flood risk Against appellant ¶7
The proposed development would be within Flood Zones 2 and 3, which is considered to be at risk of flooding. The inspector found that the sequential test was not met, as there were other sites available for development that were at lower risk of flooding.
Flood risk Against appellant ¶12
The inspector found that the sequential test was not met, and therefore the exception test did not apply. The proposed development would fail to accord with local and national planning policy relating to flood risk.
Other Against appellant ¶15
The inspector found that the benefits of the proposal did not outweigh the flood risk. The proposed development would conflict with the development plan, and there were no material considerations of sufficient weight to indicate that a decision should be made other than in accordance with the development plan and the Framework.
Policies relied on
| Reference | Weight |
|---|---|
| NPPF 170 |
Determinative |
| NPPF 172 |
Determinative |
| Policy DM20 of the WLP |
Determinative |
Site constraints from the Casework Database
Source