Case 3346100

1 Granville Drive, HOUGHTON LE SPRING, DH4 4XB

Sunderland City Council — appeal dismissed

Outcome
Dismissed
Decision date
21 July 2025
Authority
Sunderland City Council
Inspector
Hartley D
Procedure
Written Representations
Casework type
Planning Appeal
Type detail
Planning Appeals - Full
Development type
Change of use
Appellant
Mr Barry Brightman
LPA reference
24/00564/FUL
ONS LPA code
E08000024
Jurisdiction
Transferred
Link status
Child
Start date
4 October 2024

Summary AI

The appeal was dismissed due to the harm caused to the character and appearance of the area and the loss of greenspace. The inspector found that the garden extension and fence had a dominant and jarring impact on the environment, and that it did not accord with the development plan for the area taken as a whole.

Generated from the decision letter — check against the original before relying on it.

PDF text

Page 1 · Chunk 0 by D Hartley BA (Hons) MTP MBA MRTPI

1 Granville Drive, HOUGHTON LE SPRING, DH4 4XB — Sunderland City Council — by D Hartley BA (Hons) MTP MBA MRTPI an Inspector appointed by the Secretary of State Decision date: 21st July 2025

Page 1 · Chunk 1 1 Granville Drive, Houghton-le-Spring, Sunderland, DH4 4XB

1 Granville Drive, HOUGHTON LE SPRING, DH4 4XB — Sunderland City Council — 1 Granville Drive, Houghton-le-Spring, Sunderland, DH4 4XB • The appeal is made under section 174 of the Town and Country Planning Act 1990 (as amended). • The appeal is made by Mr Barry Brightman against an enforcement notice issued by Sunderland City Council. • The notice was issued on 31 May 2024. • The breach of planning control as alleged in the notice is without planning permission the material change of use of the land from open space to private garden, shown in more detail on Drawing 01 submitted as part of the below mentioned planning application (Ref: 24/00564/FUL). A copy of drawing No: 01 is attached titled “EN Plan 2”. • The requirements of the notice are to (i) cease the use of the land as a private garden, (ii) remove hard surfacing and sub-base and reinstate the land to its condition prior to the unauthorised development, and (iii) reconstruct a boundary enclosure along the rear boundary of 1 Granville Drive, on the alignment shown by dashed line on the attached plan titled “EN Plan 2”, of the same height, design and materials incorporated in the existing boundary enclosures bounding the rear garden of 1 Granville Road. • The period for compliance with the requirements is no later than two months.

Page 1 · Chunk 2 1 Granville Drive, Houghton-le-Spring, Sunderland, DH4 4XB

1 Granville Drive, HOUGHTON LE SPRING, DH4 4XB — Sunderland City Council — 1 Granville Drive, Houghton-le-Spring, Sunderland, DH4 4XB • The appeal is proceeding on the ground set out in section 174(2)(g) of the Town and Country Planning Act 1990 (as amended).

Page 1 · Chunk 3 1 Granville Drive, Houghton-le-Spring, Sunderland, DH4 4XB

1 Granville Drive, HOUGHTON LE SPRING, DH4 4XB — Sunderland City Council — 1 Granville Drive, Houghton-le-Spring, Sunderland, DH4 4XB • The appeal is made under section 78 of the Town and Country Planning Act 1990 (as amended) against a refusal to grant planning permission. • The appeal is made by Mr Barry Brightman against the decision of Sunderland City Council. • The application Ref is 24/00564/FUL. • The development proposed is the change of use from open land to private garden including the erection of a boundary fence.

Page 1 · Chunk 4 changed in terms of the main issue that relates to Appeal B. It has not therefore

1 Granville Drive, HOUGHTON LE SPRING, DH4 4XB — Sunderland City Council — changed in terms of the main issue that relates to Appeal B. It has not therefore https://www.gov.uk/planning-inspectorate

Page 1 · Chunk 5 changed in terms of the main issue that relates to Appeal B. It has not therefore

1 Granville Drive, HOUGHTON LE SPRING, DH4 4XB — Sunderland City Council — changed in terms of the main issue that relates to Appeal B. It has not therefore https://www.gov.uk/planning-inspectorate Appeal Decisions APP/J4525/C/24/3346104, APP/J4525/W/24/3346100 been necessary for me to seek comments from the main parties about the implications of the 2024 Framework. 4. In the banner heading above, and in respect of Appeal B, I have used the description of development from the Council’s refusal notice rather than the appellant’s application form, as it is it is more precise and succinct. Reasons Appeal A – ground (g) appeal 5. The appeal on ground (g) is that the period specified in the notice in accordance with section 173(9) of the Act falls short of what should reasonably be allowed. 6. The appellant considers that the two months compliance period is too short as a planning application for the same development has been refused and hence requests an extended compliance period to nine months so that the appeal made under section 78 of the Act can be determined. I have determined such an appeal below and therefore it is not necessary to extend the compliance period as requested by the appellant. 7.

Page 2 · Chunk 6 changed in terms of the main issue that relates to Appeal B. It has not therefore

1 Granville Drive, HOUGHTON LE SPRING, DH4 4XB — Sunderland City Council — changed in terms of the main issue that relates to Appeal B. It has not therefore On the evidence that is before me, I find that a compliance period of two months strikes a reasonable and proportionate balance between bringing the unauthorised development to an end and affording reasonable time to carry out the requirements of the notice. Therefore, I conclude that the ground (g) appeal fails. Appeal B – appeal made under section 78 of the Act Main Issue 8. The main issue is the effect of the development on the character and appearance of the area and the greenspace. Reasons 9. The proposed garden extension to 1 Granville Road, including the erection of a new enclosing wooden fence, has already occurred on the land. It has been formed on land which forms part of Success Park. Prior to the development occurring, the land formed part of a segment of vegetation which lined the public pathway leading from Bradwell Way to Dunraven Close. 10. On my site visit, I was able to appreciate an otherwise pleasing consistency to the linear pattern of the fence lines to the rear of the properties in Granville Road, and, accordingly, a deliberately planned form of development relative to how the rear of the residential plots in Granville Road relate to Success Park.

Page 2 · Chunk 7 changed in terms of the main issue that relates to Appeal B. It has not therefore

1 Granville Drive, HOUGHTON LE SPRING, DH4 4XB — Sunderland City Council — changed in terms of the main issue that relates to Appeal B. It has not therefore Indeed, prior to the fence being erected, I find that there was a pleasing balance and symmetry to the undeveloped nature of the greenspace either side of the public footpath running through this part of Success Park. In this regard, I find that the appeal land contributed positively and distinctively to the character and appearance of the area, and to the greenspace as a whole. 11. In the context of the above, the garden extension and fence is experienced as having a dominant and jarring impact in the environment, particularly when seen from the adjacent public footpath in Success Park. I find that the fence and garden extension unacceptably erodes the sense of undeveloped space within this part of Success Park and, owing to the position and height of the fence, it harmfully https://www.gov.uk/planning-inspectorate 2

Page 3 · Chunk 8 changed in terms of the main issue that relates to Appeal B. It has not therefore

1 Granville Drive, HOUGHTON LE SPRING, DH4 4XB — Sunderland City Council — changed in terms of the main issue that relates to Appeal B. It has not therefore Appeal Decisions APP/J4525/C/24/3346104, APP/J4525/W/24/3346100 protrudes into the undeveloped greenspace to the extent that it materially departs from the otherwise linear and well planned pattern of development that exists in terms of the relationship between the housing plots on Granville Road and the greenspace in this part of Success Park. 12. I acknowledge that the plans show that new shrubs would be planted in front the fence. This may soften the impact of the fence to some degree, although such vegetation would take some time to mature and may not endure forever. Moreover, this would not overcome the harm caused in terms of the loss of greenspace and owing to the erection of the fence given the adverse impact on the pattern of development in this area. 13. On the evidence that is before me, a case has not been made to justify the loss of the greenspace in accordance with the requirements of paragraph 4 of policy NE4 of the CS&DP. The appellant has commented that the land was previously overgrown (including brambles) and was not properly maintained by the previous owner, despite numerous attempts to try to resolve this matter. 14. The evidence indicates that the appellant now owns the land.

Page 3 · Chunk 9 changed in terms of the main issue that relates to Appeal B. It has not therefore

1 Granville Drive, HOUGHTON LE SPRING, DH4 4XB — Sunderland City Council — changed in terms of the main issue that relates to Appeal B. It has not therefore Consequently, it can now be appropriately maintained by the appellant. It need not be an inevitable consequence that maintenance can only take place in conjunction with an extended garden and including the erection of a fence. This is not therefore a matter which justifies the loss of greenspace and/or the harm caused to the character and appearance of the area. In this context, I do not therefore find that a case has been made that the development has ‘enhanced the quality’ of the greenspace. 15. The undisputed evidence is that the site falls within a ward where the Council’s Greenspace Audit states that there is a below average provision of greenspace. While the appeal land may not have been used for a specific recreational purpose, it has nevertheless functioned as an area of public amenity space as part and parcel of the wider greenspace known as Success Park. Fencing off the land to form a private garden space does not provide the same undeveloped greenspace amenity function and value associated with use of this part of Success Park. 16.

Page 3 · Chunk 10 changed in terms of the main issue that relates to Appeal B. It has not therefore

1 Granville Drive, HOUGHTON LE SPRING, DH4 4XB — Sunderland City Council — changed in terms of the main issue that relates to Appeal B. It has not therefore For the above reasons, I conclude that the development has caused significant harm to the character and appearance of the area and has resulted in an unjustified loss of greenspace in a ward where there is below average provision. Consequently, the development does not accord with the design and greenspace requirements of policies BH1 and NE4 of the CS&DP, and chapter 10 of the 2024 Framework. Other Matters 17. The appellant has referred me to an appeal decision for the change of use of amenity land to residential in Wokingham1. I do not have the plans that accompanied this planning application and, moreover, the development relates to a different area. I have considered this appeal on its individual planning merits and have exercised my own planning judgement based on the circumstances that prevail in terms of the appeal development. The referenced appeal decision does not alter or outweigh by overall conclusion below. 1 APP/X0360/W/16/3163813 https://www.gov.uk/planning-inspectorate 3

Page 4 · Chunk 11 changed in terms of the main issue that relates to Appeal B. It has not therefore

1 Granville Drive, HOUGHTON LE SPRING, DH4 4XB — Sunderland City Council — changed in terms of the main issue that relates to Appeal B. It has not therefore Appeal Decisions APP/J4525/C/24/3346104, APP/J4525/W/24/3346100 Section 78 Appeal Conclusion 18. For the reasons given above, I conclude that the development does not accord with the development plan for the area taken as a whole and there are no material considerations that indicate the decision should be made other than in accordance with the development plan. Therefore, the appeal should be dismissed. Overall Conclusions Appeal A Ref: APP/J4525/C/24/3346104 19. For the reasons given above, I conclude that the appeal should not succeed. I shall uphold the enforcement notice. Appeal B Ref: APP/J4525/W/24/3346100 20. For the reasons given above, the appeal should be dismissed.

Page 4 · Chunk 12 D Hartley

1 Granville Drive, HOUGHTON LE SPRING, DH4 4XB — Sunderland City Council — D Hartley INSPECTOR https://www.gov.uk/planning-inspectorate 4

Extracted from the decision letter PDF and shown in full, chunk by chunk.

Main issues and findings

Character and appearance
Against appellant
¶9

The proposed garden extension to 1 Granville Road, including the erection of a new enclosing wooden fence, has already occurred on the land. It has been formed on land which forms part of Success Park. Prior to the development occurring, the land formed part of a segment of vegetation which lined the public pathway leading from Bradwell Way to Dunraven Close.

Character and appearance
Against appellant
¶10

I was able to appreciate an otherwise pleasing consistency to the linear pattern of the fence lines to the rear of the properties in Granville Road, and, accordingly, a deliberately planned form of development relative to how the rear of the residential plots in Granville Road relate to Success Park.

Character and appearance
Against appellant
¶11

The garden extension and fence is experienced as having a dominant and jarring impact in the environment, particularly when seen from the adjacent public footpath in Success Park.

Other
Against appellant
¶15

Fencing off the land to form a private garden space does not provide the same undeveloped greenspace amenity function and value associated with use of this part of Success Park.

Policies relied on

Reference Weight
policy NE4
Determinative
policy BH1
Determinative
Chapter 10 of the 2024 Framework
Determinative

Site constraints from the Casework Database

Conservation area
Green belt
Listed building setting
AONB
SSSI
Flooding an issue

Source

Decision letter, 4 pages, issued by the Planning Inspectorate on 21 July 2025 under the Open Government Licence.