Case 3344697

2 North Lane, Weston-super-Mare, North Somerset, BS23 1QR

North Somerset Council — appeal allowed

Outcome
Allowed
Decision date
25 September 2024
Authority
North Somerset Council
Inspector
Rose C
Procedure
Written Representations
Casework type
Planning Appeal
Type detail
Planning Appeals - Other
Development type
Change of use
Appellant
Mr M Gauntlett
LPA reference
24/P/0126/FUL
ONS LPA code
E06000024
Jurisdiction
Transferred
Link status
Child
Start date
24 June 2024

Summary AI

The application for costs was refused as the inspector did not find that the appellant acted unreasonably in the appeal process.

Generated from the decision letter — check against the original before relying on it.

PDF text

Page 1 · Chunk 0 by C Rose BA(Hons) BTP MRTPI

2 North Lane, Weston-super-Mare, North Somerset, BS23 1QR — North Somerset Council — by C Rose BA(Hons) BTP MRTPI an Inspector appointed by the Secretary of State Decision date: 2 September 2024

Page 1 · Chunk 1 2 North Lane, Weston-super-Mare, North Somerset BS23 1QR

2 North Lane, Weston-super-Mare, North Somerset, BS23 1QR — North Somerset Council — 2 North Lane, Weston-super-Mare, North Somerset BS23 1QR • The application is made under the Town and Country Planning Act 1990, sections 78, 322 and Schedule 6, and the Local Government Act 1972, section 250(5). • The application is made by North Somerset Council for a full award of costs against Mr M Gauntlett. • The appeal was against a grant of planning permission subject to conditions for Installation of 2no.ground floor windows on south elevation, a rooflight on rear (East) roof sloping roof plane and a flat rooflight on the flat roof to the East. Retrospective application for the rebuild of property comprising the removal of 2no. existing fire damaged pitched roofs, erection of 1no.replacement pitched roof including an increase in ridge height and 1no. flat roof. Replacement wall on 1st floor rear elevation. Replacement windows and alterations to window sizes on south (side) elevation (4 in total), re-instatement of 1no. door opening and reduction of barge board depth on south (side) elevation. Replacement window on first floor front elevation. Installation of 1no. window on first floor north (side) elevation and 1no. replacement window and alteration to window size of 1no. first floor window on North (side) elevation. Re- rendering of external walls. 2no. rooflights.

Page 1 · Chunk 2 4. No response to the applicant’s cost claim has been provided by the appellant.

2 North Lane, Weston-super-Mare, North Somerset, BS23 1QR — North Somerset Council — 4. No response to the applicant’s cost claim has been provided by the appellant. 1 23/P/1242/FUL 2 23/P/1607/CM2A https://www.gov.uk/planning-inspectorate

Page 1 · Chunk 3 4. No response to the applicant’s cost claim has been provided by the appellant.

2 North Lane, Weston-super-Mare, North Somerset, BS23 1QR — North Somerset Council — 4. No response to the applicant’s cost claim has been provided by the appellant. 1 23/P/1242/FUL 2 23/P/1607/CM2A https://www.gov.uk/planning-inspectorate

Page 2 · Chunk 4 4. No response to the applicant’s cost claim has been provided by the appellant.

2 North Lane, Weston-super-Mare, North Somerset, BS23 1QR — North Somerset Council — 4. No response to the applicant’s cost claim has been provided by the appellant. Costs Decision APP/D0121/W/24/3344697 5. While reference to the relevance of the other application and to the extract could have been more clearly presented, it was apparent to me from the evidence that the other application does not form part of the appeal. I do not believe that the extract was included to deliberately mislead and as the other application and extract form part of the planning history for the site, I cannot conclude that they are irrelevant. 6. With regard to the reference to multiple paragraphs from the Framework without explaining their relevance, given that the applicant did not rebut each of the stated paragraphs in detail and the Framework is a material consideration, I do not find that their inclusion was unreasonable or led to unnecessary or wasted expense. 7. Although I have found that I cannot be sure that the other appeal decision is directly comparable, the Council rebutted its relevance in a number of short sentences. Furthermore, it is not unusual for appellants to provide copies of other appeal decisions. As a result, I do not find that reference to the other appeal decision represents unreasonable behaviour that led to unnecessary or wasted expense worthy of the grant of costs. 8.

Page 2 · Chunk 5 4. No response to the applicant’s cost claim has been provided by the appellant.

2 North Lane, Weston-super-Mare, North Somerset, BS23 1QR — North Somerset Council — 4. No response to the applicant’s cost claim has been provided by the appellant. The appellants Statement of Case details their arguments with regard to the removal of conditions 3, 4, 5 and 7 and I have found in favour of the appellant with regard to condition 6. In my view the appellant provided reasons for his concerns in relation to condition 3, 4, 5 and 7 adequately justifying why he considered that the conditions should be removed. In light of the this, I cannot conclude that there was not a reasonable prospect of success in submitting the appeal. 9. In light of the above, I do not find that the appellant acted unreasonably by submitting the appeal, through the reference to another application and the extract, reference to the Framework, reference to the other appeal decision or by failing to provide sufficient evidence to justify his position. This did not therefore lead to unnecessary or unreasonable costs for the applicant. 10. Accordingly, I find that unreasonable behaviour on procedural or substantive terms resulting in unnecessary or wasted expense, as described in the PPG, has not been demonstrated. 11. The application for an award of costs must therefore fail.

Page 2 · Chunk 6 C Rose

2 North Lane, Weston-super-Mare, North Somerset, BS23 1QR — North Somerset Council — C Rose INSPECTOR https://www.gov.uk/planning-inspectorate 2

Extracted from the decision letter PDF and shown in full, chunk by chunk.

Main issues and findings

Living conditions
Against appellant
¶3

The appellant included irrelevant information from another application and a large section of the National Planning Policy Framework without explaining its relevance.

Living conditions
Against appellant
¶4

The appellant referenced another appeal decision with no similarities and inadequate evidence to justify its case.

Conditions
For appellant
¶8

The inspector found in favour of the appellant with regard to condition 6, and the appellant provided adequate reasons for removing conditions 3, 4, 5, and 7.

External appearance
For appellant
¶8

The inspector found that the appellant provided adequate reasons for removing conditions 3, 4, 5, and 7.

Policies relied on

Reference Weight
PPG
Determinative

Site constraints from the Casework Database

Conservation area
Green belt
Listed building setting
AONB
SSSI
Flooding an issue

Source

Decision letter, 2 pages, issued by the Planning Inspectorate on 25 September 2024 under the Open Government Licence.