Case 3316793

20 Gibson Drive, PAIGNTON, TQ4 7AL

Torbay Council — appeal allowed

Outcome
Allowed
Decision date
1 September 2023
Authority
Torbay Council
Inspector
Hills J
Procedure
Written Representations
Casework type
Planning Appeal
Type detail
Planning Appeals - Full
Development type
Minor Dwellings
Appellant
Mr Sam Thomas
LPA reference
P/2022/1070
ONS LPA code
E06000027
Jurisdiction
Transferred
Link status
Not Linked
Start date
17 May 2023

Summary AI

The appeal for a self-build 2-storey semi-detached dwelling at 20 Gibson Drive, Torbay, Paignton was allowed. The development would not harmfully enclose the openness or pleasant gap between existing properties and would be of a high quality, adding to the overall quality of the area.

Generated from the decision letter — check against the original before relying on it.

PDF text

Page 1 · Chunk 0 Appeal Decision

20 Gibson Drive, PAIGNTON, TQ4 7AL — Torbay Council — Appeal Decision Site visit made on 17 August 2023 by J Hills MRTPI an Inspector appointed by the Secretary of State Decision date: 1 September 2023 Appeal Ref: APP/X1165/W/23/3316793 20 Gibson Drive, Torbay, Paignton TQ4 7AL • The appeal is made under section 78 of the Town and Country Planning Act 1990 against a refusal to grant outline planning permission. • The appeal is made by Mr Sam Thomas against the decision of Torbay Council. • The application Ref P/2022/1070, dated 28 September 2022, was refused by notice dated 29 November 2022. • The development proposed is erection of new self build 2 storey semi-detached dwelling. Decision 1. The appeal is allowed and planning permission is granted for erection of new self build 2 storey semi-detached dwelling at 20 Gibson Drive, Torbay, Paignton TQ4 7AL in accordance with the terms of the application, Ref P/2022/1070, dated 28 September 2022, subject to conditions set out in the attached schedule. Preliminary Matters 2. I note the appeal is made in outline with appearance and landscaping reserved for later consideration. This is reflective of the application form, appeal form and Council’s decision notice.

Page 1 · Chunk 1 Appeal Decision

20 Gibson Drive, PAIGNTON, TQ4 7AL — Torbay Council — Appeal Decision I have therefore taken any indication of reserved matters shown on the submitted drawings to be illustrative. Main Issue 3. The main issue is the effect of the proposal on the character and appearance of the area. Reasons 4. The appeal site forms part of a generous side garden to an attached, two storey property and is adjacent to a footpath that provides access into and out of the wider residential estate and a pleasant gap allowing a sense of openness. The immediate surrounding urban area is characterised by relatively dense groups of terraced and semi-detached properties, some of which include linked, flat roofed garages. 5. Whilst a corner of the side elevation of the development would be positioned relatively close to the footpath, the proposed scale and layout would bring the overall massing of the property away from it. This, together with the proposed single storey element to the scheme, would ensure a clear visual separation between footpath and property, despite the limited set back from the host property frontage. In that context, the development would be of a similar height, scale and layout to the host property it would adjoin. This would result https://www.gov.uk/planning-inspectorate

Page 2 · Chunk 2 Appeal Decision

20 Gibson Drive, PAIGNTON, TQ4 7AL — Torbay Council — Appeal Decision Appeal Decision APP/X1165/W/23/3316793 in a continuity and consistency of built form that would respect the existing street frontages. Additionally, the scale of the overall ground floor accommodation would sit comfortably within the wider plot. For the above reasons the development would not be cramped, overbearing or overly dominant. 6. Some longer distant views of the wider estate would be restricted by the development from certain public vantage points. However, these views would not be significantly eroded to an extent where the development would harmfully enclose the openness or pleasant gap between existing properties. Furthermore, the single storey element of the development could conceivably be progressed at the reserved matter stage with a pitched roof, though even if it were to be a flat roof, the design would maintain an unimposing façade that would not appear incongruous or untypical of the wider built up area. Accordingly, the development would be of a high quality, and would function well and add to the overall quality of the area. 7. I therefore conclude on the main issue that the proposal would preserve the character and appearance of the area.

Page 2 · Chunk 3 Appeal Decision

20 Gibson Drive, PAIGNTON, TQ4 7AL — Torbay Council — Appeal Decision As such, it would not conflict with Policy DE1 of the Torbay Local Plan 2012-2030 or Policy PNP1(c) of the Paignton Neighbourhood Plan 2012-2030 adopted June 2019 which, together in this respect, seek to promote development that would relate to the surrounding built environment in terms of scale, height and massing, and respect important townscape vistas. There would also be no conflict with paragraphs 126 and 130 of the National Planning Policy Framework. Conditions 8. I have imposed standard conditions relating to the submission and timing of reserved matters applications and the commencement of development. It is necessary to require compliance with the submitted plans, but only in relation to access, layout and scale as these are not reserved matters. 9. A construction management plan condition is required in the interests of neighbouring amenity and in the interest of the convenience of highways users. Details for electric vehicle charging points, the storage of bicycles and a compliance condition relating to the delivery of a hardstanding are all required to ensure suitable provision is made for a range of transport modes.

Page 2 · Chunk 4 Appeal Decision

20 Gibson Drive, PAIGNTON, TQ4 7AL — Torbay Council — Appeal Decision Refuse/recycling storage and landscaping details are necessary in the interests of the character and appearance of the area. 10. A drainage condition is necessary in the interests of managing flood risk. Compliance with the tree appraisal plan and a scheme to provide biodiversity net gain are needed in the interests of biodiversity. 11. I have made some amendments to the Council’s suggested conditions in the interests of clarity and to ensure compliance with the Framework. Conclusion 12. For the reasons given I conclude the appeal should succeed.

Page 2 · Chunk 5 J Hills

20 Gibson Drive, PAIGNTON, TQ4 7AL — Torbay Council — J Hills INSPECTOR https://www.gov.uk/planning-inspectorate 2

Page 2 · Chunk 6 J Hills

20 Gibson Drive, PAIGNTON, TQ4 7AL — Torbay Council — J Hills INSPECTOR https://www.gov.uk/planning-inspectorate 2 Appeal Decision APP/X1165/W/23/3316793 Schedule of Conditions 1. Details of the appearance and landscaping (hereinafter called "the reserved matters") shall be submitted to and approved in writing by the local planning authority before any development takes place and the development shall be carried out as approved. 2. Application for approval of the reserved matters shall be made to the local planning authority not later than three years from the date of this permission. 3. The development hereby permitted shall take place not later than two years from the date of approval of the last of the reserved matters to be approved. 4. The development hereby permitted shall be carried out in accordance with the following approved plans: STP 10; STP 12; STP 13; STP 14; STP 15 (but only in respect of those matters not reserved for later approval). 5. No development shall take place until a construction management plan has been submitted to and approved in writing by the local planning authority.

Page 3 · Chunk 7 J Hills

20 Gibson Drive, PAIGNTON, TQ4 7AL — Torbay Council — J Hills The plan should include, but not be limited to: (a) the parking of vehicles of site operatives and visitors (b) loading and unloading of plant and materials (c) storage of plant and materials used in constructing the development (d) the erection and maintenance of security hoarding, where appropriate (e) wheel and/or highway washing facilities (f) measures to control the emission of dust and dirt during construction (g) measures to minimise noise nuisance to neighbours from plant and machinery. (h) construction working hours from 8:00 to 18:00 Monday to Friday, 8:00 to 13:00 on Saturdays and at no time on Sundays or Bank Holidays. The approved construction management plan shall be adhered to throughout the construction period. 6. Prior to the occupation of the dwelling hereby approved, a scheme for the insertion of one electrical vehicle charging point to be located within the site shall be submitted to and approved in writing by the local planning authority. Details shall include design, location, specification and a timescale for insertion prior to occupation. The approved electrical vehicle charging points shall be thereafter available for use, maintained and retained for the lifetime of the development. 7.

Page 3 · Chunk 8 J Hills

20 Gibson Drive, PAIGNTON, TQ4 7AL — Torbay Council — J Hills Prior to the first occupation of the dwelling hereby permitted, provision shall be made for the storage of bicycles according to details which shall previously have been submitted to and approved in writing by the local planning authority. Once provided, the agreed storage arrangements shall be retained for the life of the development. https://www.gov.uk/planning-inspectorate 3

Page 3 · Chunk 9 J Hills

20 Gibson Drive, PAIGNTON, TQ4 7AL — Torbay Council — J Hills Prior to the first occupation of the dwelling hereby permitted, provision shall be made for the storage of bicycles according to details which shall previously have been submitted to and approved in writing by the local planning authority. Once provided, the agreed storage arrangements shall be retained for the life of the development. https://www.gov.uk/planning-inspectorate 3

Page 4 · Chunk 10 J Hills

20 Gibson Drive, PAIGNTON, TQ4 7AL — Torbay Council — J Hills Appeal Decision APP/X1165/W/23/3316793 8. Prior to the first occupation of the dwelling hereby permitted, provision shall be made for the storage of refuse and recycling according to details which shall previously have been submitted to and approved in writing by the local planning authority. Once provided, the agreed storage arrangements shall be retained for the life of the development. 9. The dwelling hereby approved shall not be occupied or brought into use until the hardstanding parking area detailed on approved plan ‘STP 12’ has been provided in full. The hardstanding shall thereafter be permanently retained for the use of parking by the dwelling. 10. Surface water drainage shall be provided by means of soakaways within the site which shall comply with the requirements of BRE Digest 365 for the critical 1 in 100 year storm event plus 50% for climate change unless an alternative means of surface water drainage is submitted to and agreed in writing by the local planning authority prior to installation. To adhere to current best practice and take account of urban creep, the impermeable area of the proposed development must be increased by 10% in surface water drainage calculations.

Page 4 · Chunk 11 J Hills

20 Gibson Drive, PAIGNTON, TQ4 7AL — Torbay Council — J Hills The development hereby approved shall not be occupied or brought into use until the agreed drainage scheme has been provided and it shall be retained and maintained for the lifetime of the development. 11. The development shall not be carried out otherwise than in strict accordance with the hereby approved ’22.942.1.TAP Tree Appraisal Plan’. 12. The reserved matters application/s for ‘landscaping’ shall be accompanied by full details of the hard and soft landscape works, including an implementation and management plan. Details of soft landscape works shall include retention of any existing trees and hedges; finished levels/contours; planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate. The hard landscape works shall include means of enclosure; boundary and surface treatments and vehicle and pedestrian/cyclist circulation.

Page 4 · Chunk 12 J Hills

20 Gibson Drive, PAIGNTON, TQ4 7AL — Torbay Council — J Hills All planting, seeding, turfing or hard surfacing comprised in the approved landscaping scheme shall be carried out by the end of the first planting and seeding seasons following the first occupation of the dwellings hereby approved or completion of the development, whichever is the sooner. Any trees or plants which within a period of five years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species unless the local planning authority gives written consent to any variation. The approved landscaping scheme shall be carried out in its entirety and shall accord with the approved details and timetable. Any boundary treatments or means of enclosure shall be carried out and installed prior to the first occupation of the new dwelling and shall be retained for the life of the development. 13. The reserved matters application/s for ‘landscaping’ shall be accompanied by a scheme to provide a biodiversity net gain across the application site. https://www.gov.uk/planning-inspectorate 4

Page 5 · Chunk 13 J Hills

20 Gibson Drive, PAIGNTON, TQ4 7AL — Torbay Council — J Hills Appeal Decision APP/X1165/W/23/3316793 The biodiversity net gain measures shall be installed/undertaken or secured prior to first occupation of the dwelling hereby approved and shall be maintained and retained in perpetuity thereafter. Any biodiversity net gain measures including planting measures shall be carried out by the end of the first planting and seeding seasons following the first occupation of the dwelling hereby approved or completion of the development, whichever is the sooner. Any trees or plants which within a period of five years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species unless the local planning authority gives written consent to any variation. https://www.gov.uk/planning-inspectorate 5

Extracted from the decision letter PDF and shown in full, chunk by chunk.

Main issues and findings

Character and appearance
Against appellant
¶4-7

The development would bring the overall massing of the property away from the footpath, resulting in a clear visual separation. The development would be of a similar height, scale, and layout to the host property it would adjoin, resulting in continuity and consistency of built form.

Ecology and biodiversity
Against appellant
¶12-13

A biodiversity net gain scheme would be implemented, providing measures to be installed/undertaken or secured prior to first occupation of the dwelling.

Flood risk
Against appellant
¶10

Surface water drainage would be provided by means of soakaways within the site, complying with the requirements of BRE Digest 365 for the critical 1 in 100 year storm event plus 50% for climate change.

Trees and landscape
Against appellant
¶11-12

The reserved matters application for 'landscaping' would be accompanied by full details of the hard and soft landscape works, including an implementation and management plan.

Affordable housing
Neutral

Not mentioned in the decision letter.

Policies relied on

Reference Weight
Policy DE1 of the Torbay Local Plan 2012-2030
Determinative
Policy PNP1(c) of the Paignton Neighbourhood Plan 2012-2030
Determinative
paragraphs 126 and 130 of the National Planning Policy Framework
Determinative

Site constraints from the Casework Database

Conservation area
Green belt
Listed building setting
AONB
SSSI
Flooding an issue

Source

Decision letter, 6 pages, issued by the Planning Inspectorate on 1 September 2023 under the Open Government Licence.