Case 3297751

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ

West Suffolk — appeal allowed

Outcome
Allowed
Decision date
13 October 2022
Authority
West Suffolk
Inspector
Fagan N
Procedure
Inquiry
Casework type
Planning Appeal
Type detail
Planning Appeals - Outline
Development type
Major dwellings
Appellant
St Joseph Homes Ltd
LPA reference
DC/19/2456/HYB
ONS LPA code
E07000245
Jurisdiction
Transferred
Link status
Not Linked
Start date
27 May 2022

Summary AI

The proposed development, comprising up to 1,375 dwellings, was granted planning permission, subject to conditions and the signing of a Section 106 agreement. The development complies with the development plan and the National Planning Policy Framework. The infrastructure requirements, including highway and public transport improvements, were agreed upon, and the appellant has committed to paying for the necessary works.

Generated from the decision letter — check against the original before relying on it.

PDF text

Page 1 · Chunk 0 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Inquiry Held on 13, 14, 22 & 27 September 2022 Site visits made on 12 & 15 September 2022 by Nick Fagan BSc (Hons) DipTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 13th October 2022 Appeal Ref: APP/F3545/W/22/3297751 Land North East of Bury St Edmunds, Bury Road, Great Barton, Suffolk • The appeal is made under section 78 of the Town and Country Planning Act 1990 against a failure to give notice within the prescribed period of a decision on an hybrid application for planning permission. • The appeal is made by Berkeley St Joseph Homes against West Suffolk Council. • The application Ref DC/19/2456/HYB, is dated 13 December 2019.

Page 1 · Chunk 1 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Inquiry Held on 13, 14, 22 & 27 September 2022 Site visits made on 12 & 15 September 2022 by Nick Fagan BSc (Hons) DipTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 13th October 2022 Appeal Ref: APP/F3545/W/22/3297751 Land North East of Bury St Edmunds, Bury Road, Great Barton, Suffolk • The appeal is made under section 78 of the Town and Country Planning Act 1990 against a failure to give notice within the prescribed period of a decision on an hybrid application for planning permission. • The appeal is made by Berkeley St Joseph Homes against West Suffolk Council. • The application Ref DC/19/2456/HYB, is dated 13 December 2019.

Page 1 · Chunk 2 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision • The development proposed is described as a Hybrid Planning Application For i) Outline Application (With All Matters Reserved Except For Access) - For Up To 1,375 Dwellings, Access (Including Two New Roundabouts Onto A143 And Creation Of New Foot And Cycleway Links Into The Site Which Would Include New Cycle/Pedestrian Crossings Of The A143 And Cycle/Pedestrian Link Through The Existing Railway Underpass), Public Open Space (Including Buffer To Cattishall And Great Barton) And Landscaping; New Local Centre (Which Could Include The Following Uses A1; A2; A3; A4; A5; B1; D1; Or D2); Primary School; And Associated Infrastructure And Works (Including Access Roads, Drainage Infrastructure And Substations), And ii) Planning Application - Full Details For Phase 1 Of The Outline Application For 287 Dwellings (Which Are Part Of The Overall Up To 1,375 Dwelling Proposal), Garages, Access Roads, Parking, Open Space, Drainage Infrastructure And Associated Infrastructure And Works. Decision 1.

Page 1 · Chunk 3 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision The appeal is allowed and planning permission is granted for this Hybrid Planning Application For i) Outline Application (With All Matters Reserved Except For Access) - For Up To 1,375 Dwellings, Access (Including Two New Roundabouts Onto A143 And Creation Of New Foot And Cycleway Links Into The Site Which Would Include New Cycle/Pedestrian Crossings Of The A143 And Cycle/Pedestrian Link Through The Existing Railway Underpass), Public Open Space (Including Buffer To Cattishall And Great Barton) And Landscaping; New Local Centre (Which Could Include Any Uses within Class E of the Use Classes Order 1987, as amended in 2020); Primary School; And Associated Infrastructure And Works (Including Access Roads, Drainage Infrastructure And Substations), And ii) Planning Application - Full Details For Phase 1 Of The Outline Application For 287 Dwellings (Which Are Part Of The Overall Up To 1,375 Dwelling Proposal), Garages, Access Roads, Parking, Open Space, Drainage Infrastructure And Associated Infrastructure And Works at Land North East of Bury St Edmunds, Bury Road, Great Barton, Suffolk in accordance with the terms of the application, Ref DC/19/2456/HYB, dated 13 December 2019, subject to the conditions set out in the

Page 1 · Chunk 4 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Schedule below. https://www.gov.uk/planning-inspectorate

Page 1 · Chunk 5 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision https://www.gov.uk/planning-inspectorate

Page 2 · Chunk 6 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Appeal Decision APP/F3545/W/22/3297751 Main Issues 2. The main issues at the start of the Inquiry were as follows: (1) Whether the proposed development would result in an unacceptable impact on highway safety or severe residual cumulative impacts on the local and strategic transport network contrary to relevant development plan policies and NPPF paragraph 111 (essentially as expressed in the LPA’s first putative refusal reason). (2) With reference to this, in terms of both the improvements to local highway junctions (including the A14 and congested local road junctions) and walking and cycling improvements to the site, what are the exact areas of disagreement between the parties and why: i.e. which improvements required by WSC/SCC is the appellant contesting and why? (3) How and when highway/transport improvements would be delivered – i.e., via S106 agreement or otherwise, including for the full and outline parts of the proposed development. (4) Whether the leisure centre (indoor sports provision) contribution of £870,513 is justified and meets the legal tests in CIL Reg 122(2). (5) Whether the libraries contribution of £297,000 is justified and meets the legal tests in CIL Reg 122(2). 3.

Page 2 · Chunk 7 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision The Inquiry was scheduled to last up to 10 days. In the event it was clear that the main parties – the appellant, the Council – West Suffolk Council (WSC), the Local Planning Authority (LPA), and the Rule 6 Party – Suffolk County Council (SCC), the Local Highway Authority (LHA) – were close to agreement on some or all of these main issues. Accordingly, I allowed several adjournments of the Inquiry to facilitate requisite discussions to take place between them. This culminated on the penultimate day of the Inquiry to agreement between all three main parties, including in respect to the precise wording of the planning conditions and of the obligations in a final draft S106 agreement (the S106), on all of the above main issues, which was reflected in all their closing statements on the last sitting day of the Inquiry. 4. In short it was agreed that, subject to the agreed conditions and obligations in the S106, there would be no unacceptable impact on highway safety or severe residual cumulative impacts on the local or strategic transport network. The quantum of financial contributions towards WSC’s indoor sports provision and SCC’s libraries in the area was also agreed.

Page 2 · Chunk 8 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision This meant that neither the LPA nor the LHA, nor indeed National Highways, which had initially also raised highway objections to the proposed development as the body responsible for the A14 strategic road, had any continuing objections. They all agreed that planning permission should be granted on the basis that the development complied with both the development plan for the area and the National Planning Policy Framework (NPPF). 5. It was not possible to obtain the signature of the mortgagee by the last sitting day of the Inquiry and I allowed a period of up to two weeks for the S106 to be finalised. In the event, the S106 was signed, dated and sent in on 7 October 2022. https://www.gov.uk/planning-inspectorate 2

Page 2 · Chunk 9 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision This meant that neither the LPA nor the LHA, nor indeed National Highways, which had initially also raised highway objections to the proposed development as the body responsible for the A14 strategic road, had any continuing objections. They all agreed that planning permission should be granted on the basis that the development complied with both the development plan for the area and the National Planning Policy Framework (NPPF). 5. It was not possible to obtain the signature of the mortgagee by the last sitting day of the Inquiry and I allowed a period of up to two weeks for the S106 to be finalised. In the event, the S106 was signed, dated and sent in on 7 October 2022. https://www.gov.uk/planning-inspectorate 2

Page 3 · Chunk 10 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Appeal Decision APP/F3545/W/22/3297751 Reasons The Site and Surroundings in the Context of the Proposed Development 6. The application site (the Site) extends to approximately 79ha including the highway land required to facilitate access and an area of land to the north of the Orttewell Road roundabout, which is required for surface water drainage purposes. 7. The Site forms a broad triangle shape and is contained on its southern boundary by the Cambridge to Ipswich railway line whilst the A143, which runs from the south west to north east, contains the Site on its northern boundary. The eastern boundary of the Site is formed by the hamlet of Cattishall and Green Lane that runs southwards towards an existing level crossing at the railway line. The Site lies within the ‘plateau estate farmlands’ landscape character area as defined in the Suffolk Landscape Character Assessment. 8. It is presently in an arable agricultural use, broadly comprising 5 separate fields separated by existing hedgerows. Some of those hedgerows are identified as comprising ‘Important’ hedgerow under the Wildlife and Landscape Criteria of Hedgerow Regulations (1997).

Page 3 · Chunk 11 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Within the Site there are incidental groups of trees and similar, the most notable of which is referred to as ‘Severals Clump’. Two Tree Preservation Orders are in place on the site together with the presence of veteran trees. The proposed development would preserve these important trees and hedgerows. In addition to this a restricted public Byway (‘Green Lane’) cuts through the site. 9. An existing ‘seasonally wet’ drainage channel runs along the northwestern boundary of the Site adjacent to the A143. Within the Site there is a small existing pond broadly within the north-eastern quadrant of the Site. A further small water body lies on the edge of the northern boundary of the Site within a copse of existing trees. 10. Where existing development is located close to the Site it is generally mixed in nature. To the south of the railway line is a large modern housing estate (often referred to as ‘Moreton Hall’). Access to this housing area from the Site is afforded via an existing underpass under the railway line, albeit for health and safety reasons this is presently blocked.

Page 3 · Chunk 12 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision To the west of the Site is the Chapel Pond Hill Industrial Estate and the British Sugar factory, whose silo chimneys dominate views in the landscape. To the north of the Site (on the opposite side of the A143) lies Barton Stud, whilst the village of Great Barton lies to the northeast of the Site. 11. The Site lies within the Bury St Edmunds Housing Settlement Boundary as defined upon the Council’s adopted Policy Map (2015). The Site as a whole is excluded from the defined ‘countryside’ as set out within the Vision 2031 document. 12. It does not fall within a Conservation Area and does not contain any listed buildings or scheduled ancient monuments. The Grade I listed Church of the Holy Innocents lies approximately 500m to the east of the application site, while the Grade II listed Great Barton Lodge lies approximately 500m to the north of the site. Archaeological assessment of the Site has identified that it has a high potential for buried archaeological features with the ‘Cattishall https://www.gov.uk/planning-inspectorate 3

Page 4 · Chunk 13 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Appeal Decision APP/F3545/W/22/3297751 Tumulus’ identified within the eastern area of Site and a concentration of Iron Age/Roman remains in the central northern portion of the Site. 13. There is no compelling evidence or information that the proposed development would adversely affect any heritage assets; indeed, there is agreement between the LPA and appellant that it would not and that it would satisfy the two statutory requirements in regard to the preservation or enhancement of listed buildings, their settings or buildings or land in Conservation Areas1, subject to conditions relating to the requirement for archaeological investigation (Conditions 7 and 8 in the schedule below). 14. There are no local, national or European ecological/biodiversity designations within the existing site. However, there are such designations within the local area, including: • The Glen Chalk Caves Site of Special Scientific Interest (SSSI) is located circa 1km from the Site and is so designated on the basis that it supports a nationally important population of bats. • The Horringer Court Caves SSSI is located 4.3km south-west of the Site and is so designated on the basis that it supports a nationally important population of bats.

Page 4 · Chunk 14 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision • The Breckland Special Protection Area (SPA) is located approximately 7.7km north-west of the Site. The SPA is of international importance for its populations of breeding Stone Curlew, Nightjar and Woodlark. There is no compelling evidence or information that the proposed development would adversely affect these designated ecological sites. 15. There is also agreement between the LPA and appellant that the proposed development would provide well in excess of a 10% biodiversity net gain. It is uncontested that the proposed development would preserve the landscape character of the area, including by retaining important veteran and other protected trees as well as important hedgerows across the site, which would be strengthened. 16. The Great Barton Air Quality Management Area (AQMA) lies approximately 1km to the north of the site, comprising an area incorporating Gatehouse Cottage and 1 to 8 The Street. The management area was declared for Nitrogen Dioxide (NO2) exceedances. There is no compelling evidence or information that the proposed development would adversely affect this AQMA. 17. The Site lies within Flood Zone 1 and is at low risk of flooding.

Page 4 · Chunk 15 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision It lies within a Minerals Safeguarding Zone as defined within SCC’s Minerals Core Strategy 2008, but its subsequent designation as an allocated development site within the development plan overrides that zoning. The Development Proposals in Detail 18. Planning permission is sought for the provision of a total of up to 1,375 dwellings on the site as well as other associated uses. The application is made in a hybrid form and the first phase of dwellings (totalling 287 dwelling units) is proposed in detail. 30% of the dwellings in the detailed Phase 1 stage and 30% within each outline phase – as set out within the S106 (Second Schedule) – 1 Sections 66 (1) & 72 (1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 (as amended) https://www.gov.uk/planning-inspectorate 4

Page 5 · Chunk 16 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Appeal Decision APP/F3545/W/22/3297751 would be affordable housing; 80% of these would be at affordable rents and 20% as intermediate units including shared ownership; all such affordable dwellings would require occupation prior to a similar percentage of the market units in any particular phase. 19. The proposed distribution of residential development parcels across the site is shown on the Land Use Parameter Plan. There are also Parameter Plans for density and building heights. In line with the Masterplan SPD, the majority of the development parcels are proposed to be limited to no more than three storeys in height apart from some limited areas of two and four storey development. Housing density within the development parcels is also shown in line with the Masterplan SPD, broadly providing for lower density development on the more sensitive parcel edges and higher densities in more central locations. 20. House types proposed within the Phase 1 full element of the development are mixed, comprising; detached, semi-detached, terraced and flatted properties. Vehicular access into and out from the site is proposed by way of two roundabouts on the A143. Detailed planning permission is sought for both roundabouts.

Page 5 · Chunk 17 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Additional pedestrian and cycle access points into and out from the site are proposed at other locations, including Green Lane and the existing railway underpass. Those access points are indicatively shown on the illustrative framework masterplan that accompanies the application and on the Access and Movement Parameter Plan. 21. Land sufficient to accommodate up to a two-form entry primary school and early years setting is proposed as part of the development; the proposed location of the school is indicated on the Land Use Parameter Plan and is situated between Green Lane and the southern roundabout access. 22. A ‘local centre’ is proposed near the school site. This is intended to provide service and facility floor space to serve the development. The precise mix of uses that this centre will comprise of is not known at this stage and neither have specific operators been established. As such the application description includes a broad range of uses (now generally Use Class E), any of which may be suitable in this location. 23. A community building is proposed within a central location of the Site and will be delivered as part of Phase 1.

Page 5 · Chunk 18 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision This building is intended to be a multi-function community facility space akin to a village hall or similar and is intended to meet the specific community needs of the development itself, and not any wider need. The design and layout of this building is reserved for later approval. 24. A network of green spaces and corridors is proposed within the scheme and the extent of the network is shown on the Green Infrastructure Parameter Plan. The proposals include the provision of a substantial green buffer – essentially a country park – along the eastern edge of the site, which aligns precisely with the extent of the buffer as shown within the adopted policies map. A large central open space is proposed, centred on Severals Clump. Where green corridors are identified as likely being required to host drainage features those corridors have been sized such that they will not be dominated by that drainage infrastructure. https://www.gov.uk/planning-inspectorate 5

Page 6 · Chunk 19 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Appeal Decision APP/F3545/W/22/3297751 25. It is envisaged that the development proposals will be delivered across five principal phases of development. Indicative Plan ref. 1011 PL C provides an indication of the disposition of phases across the site. 26. The planning application was initially submitted concurrently with a separate application for planning permission for the construction of a footbridge across the Ipswich to Cambridge Railway Lane at the location of an existing at grade crossing to the southeast of the appeal site. This application was subsequently withdrawn by the appellant and the delivery of the footbridge is now secured by condition (Condition 60 in the Schedule). Relevant Development Plan Policies 27. The statutory adopted development plan, insofar as it relates to this appeal, comprises the following: • St Edmundsbury Core Strategy adopted December 2010 • Bury St Edmunds Vision 2031 adopted September 2014 • Joint Development Management Document adopted February 2015 • Great Barton Neighbourhood Plan made June 2021 28. The following were, at the start of the Inquiry, the most important policies of the development plan for the purposes of the determination of the application.

Page 6 · Chunk 20 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision St Edmundsbury Core Strategy adopted December 2010: • Policy CS1 – St Edmundsbury Spatial Strategy • Policy CS2 – Sustainable Development • Policy CS3 – Design and Local Distinctiveness • Policy CS7 – Sustainable Transport • Policy CS8 – Strategic Transport Improvements • Policy CS11 - Bury St Edmunds Strategic Growth • Policy CS14 – Community Infrastructure Capacity and Tariffs Bury St Edmunds Vision 2031 adopted September 2014: • Policy BV2 – Housing Development Within Bury St Edmunds • Policy BV6 – Strategic Site North-East Bury St Edmunds Joint Development Management Document adopted February 2015: • Policy DM42 – Open Space, Sport and Recreation Facilities • Policy DM45 – Transport Assessments and Travel Plans Great Barton Neighbourhood Plan made June 2021: This Plan does not allocate the Site for development (it has already been allocated by the preceding Plans), but Policies GB1 – Spatial Strategy and GB2 – Housing Delivery make reference to this allocation. https://www.gov.uk/planning-inspectorate 6

Page 7 · Chunk 21 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Appeal Decision APP/F3545/W/22/3297751 29. Additionally, the various policies within the above Plans that make reference to masterplanning and design are clearly of relevance to this appeal, in particular: Policies DM2 (Creating Places – Development Principles and Local Distinctiveness) and DM3 (Masterplans) of the Joint DM Document, and Policies GB4 (Housing Mix) and GB5 (Housing Design) of the Neighbourhood Plan, as well as the other detailed policies of these Plans mentioned in section 7 of WSC’s Committee Report particularly in regard to Phase 1 (the detailed phase) of the proposed development. Objections From Third Parties 30. Although the main parties agree that planning permission should be granted subject to the agreed conditions and S106, there remain the initial objections to the proposed development from Great Barton Parish Council, Bury St Edmunds Town Council, British Sugar and from 28 local residents, as well as additional objections from several local residents at the appeal stage, including from Cattishall Residents Association and the late objection from Green Ixworth. 31.

Page 7 · Chunk 22 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Many if not most of these objections express concerns that there would or may be insufficient infrastructure – from roads, schools and doctor’s surgeries for instance – to adequately cater for the additional residents of the proposed development, in particular as regards the additional vehicle journeys that would arise from it and taking into account all the other recent, planned and under-construction housing and other developments in and around Bury, for instance at Thurston to the east. Some of these objections also question the necessity and wisdom of building houses on this greenfield site. 32. I have considered these objections in light of development plan policies for the Site, in particular the fact that Policy CS11 iv) of the St Edmundsbury Core Strategy and Policy BV6 of the Bury St Edmunds Vision allocate this site for about this level of residential development. Furthermore, the resulting Masterplan Document and the made Great Barton Neighbourhood Plan acknowledge this. The proposed scheme is in full accordance with all these documents and policies. 33. The main issue at the start of the Inquiry was the impact of the development on highways in the area.

Page 7 · Chunk 23 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision There is now no objection from National Highways, who are responsible for the operation of the A14 trunk road and its junctions, nor from SCC as the LHA, who are responsible for the operation of the local non-strategic roads and junctions. This is because everything these two bodies have requested in order to satisfactorily mitigate the impact of additional traffic and journeys to and from the proposed development have been agreed to by the appellant and will be provided either through Grampian-type planning conditions set out in Conditions 54-80 of the Schedule below or by way of planning obligations in the S106. I am satisfied that, accordingly, all third party objections on highway grounds, including those from British Sugar in terms of the development’s effects on its Beet Campaigns, have also been overcome by such conditions and obligations. 34. There was initially dispute about two other aspects of infrastructure that the proposed scheme had to provide for by way of financial contributions to libraries and to public indoor open space, in particular to WSC’s requirement for the scheme to contribute proportionally to the funding of the swimming pool in its new proposed leisure centre next to its offices in the town.

Page 7 · Chunk 24 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision The appellant https://www.gov.uk/planning-inspectorate 7

Page 7 · Chunk 25 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision The appellant https://www.gov.uk/planning-inspectorate 7 Appeal Decision APP/F3545/W/22/3297751 has now agreed to do this. It has also agreed to pay the full amount, £297,000, that SCC requires as a contribution to carry out a full revamp of its central library in the town. I have no reason to disagree with WSC or SCC that these substantial financial contributions, achieved via the S106, are sufficient to mitigate the effects of the proposed development on these aspects of the town’s public infrastructure, as set out in the CIL Compliance Statement, jointly written by WSC and SCC. 35. Bury St Edmunds Town Council in its objections continues to maintain that the development would fail to accord with Core Strategy Policy CS2 (Sustainable Development) and that the designs of the dwellings in Phase 1 would be repetitive and poor. I disagree. The proposal would constitute sustainable development because it would be built on an allocated site in the Local Plan and provide all the necessary infrastructure required to mitigate the impact of all its future residents, as agreed by WSC, SCC and National Highways. 36.

Page 8 · Chunk 26 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision The designs of the dwellings and the associated landscaping within Phase 1 (the detailed element) of the scheme have been iteratively improved since the application was submitted in late 2019. I agree with the LPA that the dwellings will be suitably varied and well-designed, with a satisfactory palette of appropriate well-chosen exterior materials. There would be an acceptable amount of parking, both on- and off-street for both residents and visitors and I am satisfied that the layout of the internal access roads and footpaths are well designed, specifically to prioritise the rights of way of pedestrians and cyclists over vehicle traffic. 37. I am also pleased that the landscaping of the residential areas within Phase 1 would be well connected to the country park on the eastern edge of the Site and that it’s layout and design would enable suitable links to the later phases of the scheme which adjoin it, as well as retaining and improving the best landscape features of the existing site. 38. In conclusion, I am confident that Phase 1 is well designed, subject of course to satisfactory compliance with the relevant conditions in the Schedule below. 39.

Page 8 · Chunk 27 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Subject to these conditions and the S106 obligations, I am satisfied that the proposed hybrid development (both the detailed Phase 1 aspect and the outline elements of the scheme) would comply with all the relevant development plan policies mentioned above and with all relevant policies within the NPPF, in particular paragraph 111 relating to its effect on local highways. Summary of Required Infrastructure To be Provided 40. The differences between the appellant on the one hand and WSC, SCC and National Highways on the other at the start of the Inquiry related not to the principal of development on the Site, because it is an allocated site in the development plan, but solely to the combined public bodies’ cases that the appellant was failing to fund the necessary highway, public indoor sports and public libraries infrastructure that was required through development plan policy. By the last sitting day of the Inquiry, and following negotiation between the parties, the details including financial contributions by way of obligations in the S106 of such infrastructure had been agreed, as set out below. 41.

Page 8 · Chunk 28 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision In terms of highways and transport infrastructure this comprises a series of works to improve the traffic operation of several road junctions, as well as https://www.gov.uk/planning-inspectorate 8

Page 8 · Chunk 29 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision In terms of highways and transport infrastructure this comprises a series of works to improve the traffic operation of several road junctions, as well as https://www.gov.uk/planning-inspectorate 8 Appeal Decision APP/F3545/W/22/3297751 works and facilities to improve pedestrian and cycle links to and from the site to the centre of Bury St Edmunds and consequently minimise the growth of vehicular traffic on the local road network arising from the proposed development. Indicated in the list below are financial contributions secured as obligations in the S106 and works and facilities which will be secured through the indicated Grampian-style planning conditions. 42. These are as follows: (A) Public Right of Way (PRoW) Contribution of £187,8002 – defined in the S106 as Highways (destination A) Contribution – to create a field edge bridleway from the northern end of bridleway BR6 to the new cycle path at Bury St Edmunds Recycling Centre adjacent to Fornham Business Park on Fornham Road. (B) PRoW Contribution of £25,350 – defined in the S106 as Footpath 21 Contribution – to upgrade existing public Footpath 21 to a public bridleway, divert it to the field end and extend it south eastwards to East Barton Road.

Page 9 · Chunk 30 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision (C) Offsite Walking and Cycling Contribution of £695,000 – defined in the S106 as Highways (destination C) Contribution – from the site at Barton Road to the town centre to include pedestrian and cycle path improvements to Eastgate Street, Mustow Street and Looms Lane. (D) Highways (mitigation) Contribution of £1,788,758 – defined in the S106 as such – that will enable improvements to the highway network in the Bury St Edmunds Area. This definition would allow the expenditure of this contribution by the LHA to combine walking and cycling improvements with or instead of junction and carriageway improvements to improve vehicular traffic flows, at its discretion. (E) Speed Management Contribution of £15,000 – defined in the S106 Highways (A143 TRO) Contribution – towards bringing forward a Traffic Regulation Order to secure a speed limit reduction on the A143 along the accesses to the Site. (F) Construction of the southern roundabout to the Site prior to occupation of the 150th dwelling – secured by Condition 58 in the Schedule of Conditions below.

Page 9 · Chunk 31 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision (G) Construction of the northern roundabout to the Site (adjacent to the Phase 1 detailed scheme) prior to first occupation of any of the dwellings – secured by Condition 59 in the Schedule. (H) Construction of footbridge over the Cattishall rail crossing prior to no more than 500 dwellings being occupied including no more than 30 dwellings in Phase 2 – secured by Condition 60. (I) The southern access (roundabout) shall not be brought into use until the traffic signal upgrade scheme (MOVA) including the toucan crossing at 2 The amount of this and all the other contributions agreed in the S106 are BCIS indexed – i.e., shall be increased by an amount equivalent to the increase in the Building Cost Information Service of the Royal Institute of Chartered Surveyors (BCIS Index) from the date of the S106 until the date on which each sum is payable using a set formula. https://www.gov.uk/planning-inspectorate 9

Page 10 · Chunk 32 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Appeal Decision APP/F3545/W/22/3297751 Orttewell Road and the cycle link to the Orttewell Road crossing shall have been completed – secured by Condition 61. (J) Submit a suitable scheme for the upgrade of the surface of Green Lane (Byway RB4) prior to first occupation of Phase 1, complete the Byway RB4 crossing of the A143 prior to occupation of the 150th dwelling and the spine road crossing within the scheme prior to occupation of the 288th dwelling – secured by Condition 62. (K) Upgrading of the BR5 bridleway along the north side of the A143 including the A143 crossing prior to occupation of the 287th dwelling – secured by Condition 63. (L) Re-surface bridleway BR6 with hoggin or Breedon Gravel from the junction of Fornham Road southwards for 300 metres prior to occupation of the 287th dwelling – secured by Condition 64. (M) Details of the works to be undertaken to re-open the railway underpass between the Site and Moreton Hall estate to be submitted and approved prior to commencement – secured by Condition 66.

Page 10 · Chunk 33 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision (N) A scheme for an enhanced right hand turn off the A143 onto Fornham Road in Great Barton to be submitted and approved prior to first occupation of development, such scheme to be caried out prior to occupation of the 288th dwelling – secured by Condition 68. (O) Completion of walking and cycling link from the northeast corner of the Site to Great Barton including a new crossing on the A143 to be completed in full and made available for public use prior to occupation of the 287th dwelling – secured by Condition 69. (P) The agreed works to the Compeigne Way approach to the Northgate roundabout shall be completed and made available for use prior to occupation of the 500th dwelling – secured by Condition 70. (Q) A scheme for the traffic calming and associated measures on East Barton Road shall be submitted, agreed and completed prior to first occupation of the 500th dwelling – secured by Condition 71. (R) A scheme showing two lane segregation by means of hatching on the A143(S) approach to the A143/A134 roundabout shall be submitted, agreed and completed prior to occupation of the 150th dwelling – secured by Condition 72.

Page 10 · Chunk 34 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision (S) A signage strategy for pedestrians and cyclists including a timetable for its implementation to be submitted and agreed prior to first occupation of Phase 1, to be carried out and retained thereafter – secured by Condition 73. (T) Travel plans relating to respectively the non-residential, residential and primary school/early years facility shall be submitted for LPA approval prior to first occupation of these elements of the scheme – secured respectively by Conditions 74, 75 and 76. (U) Details of a shuttle bus service to/from the site to the town centre to be submitted and approved prior to occupation of the development, such https://www.gov.uk/planning-inspectorate 10

Page 10 · Chunk 35 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision (S) A signage strategy for pedestrians and cyclists including a timetable for its implementation to be submitted and agreed prior to first occupation of Phase 1, to be carried out and retained thereafter – secured by Condition 73. (T) Travel plans relating to respectively the non-residential, residential and primary school/early years facility shall be submitted for LPA approval prior to first occupation of these elements of the scheme – secured respectively by Conditions 74, 75 and 76. (U) Details of a shuttle bus service to/from the site to the town centre to be submitted and approved prior to occupation of the development, such https://www.gov.uk/planning-inspectorate 10

Page 11 · Chunk 36 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Appeal Decision APP/F3545/W/22/3297751 service to be delivered before first occupation of the 50th dwelling – secured by Condition 80. 43. Various financial contributions to public open space are set out in the S106: towards outdoor sports pitches within Bury St Edmunds including the provision of a synthetic pitch at Victory Ground (£73,270); towards outdoor sports facilities, in particular sports pitches at Victory Ground (£831,600); towards sports halls in the town (£271,557); and towards providing swimming pools within the town (£113,157). These, which together total £1,289,584 towards public open space, have all now been agreed between WSC and the appellant. 44. The appellant has now agreed to pay SCC’s full requested library contribution of £297,000, which would allow it to essentially refurbish and upgrade the central library in the town centre. 45. The S106 also provides for considerable additional infrastructure, none of which was disputed at the start of the Inquiry. This includes: (a) An early years on site contribution of £1,845,720 to provide for an early years facility. (b) An early year off site contribution of £241,752 if necessary.

Page 11 · Chunk 37 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision (c) The transfer of a suitably unencumbered site of a minimum of 2.06ha within the Site to SCC for the primary school and early years facility for the sum of £1. (d) A primary school contribution of £6,808,656 to allow the construction of a 2-form entry 420-place primary school for children aged 5-11. (e) A secondary school contribution of £5,610,900 to allow the expansion of secondary schools in the town. (f) A sixth form contribution of £1,117,425 to allow the expansion of sixth forms in the town. (g) A temporary classroom contribution of £250,000 to be used to provide temporary classrooms during the construction of the proposed development. (h) An NHS contribution towards local health facilities of £739,000. (i) A travel plan contribution of £1,000 to enable monitoring of the travel plans. 46. The CIL Compliance Statement3 jointly produced by WSC and SCC comprehensively justifies how all the above obligations fulfil the three tests under regulation 122(2) of the Community Infrastructure Regulations 2010 as follows: (a) Necessary to make the development acceptable in planning terms; (b) Directly related to the development; and (c) Fairly and reasonably related in scale and kind to the development.

Page 11 · Chunk 38 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision 3 ID8 https://www.gov.uk/planning-inspectorate 11

Page 11 · Chunk 39 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision 3 ID8 https://www.gov.uk/planning-inspectorate 11 Appeal Decision APP/F3545/W/22/3297751 47. In particular, it explains in detail which relevant development plan policies and/or SPDs or other relevant documents require such infrastructure to be provided, how this is relevant to this development and precisely how the financial contributions have been arrived at to ensure that they are proportionate to mitigate the effects of the proposed development, for instance by reference to specific formulae within these documents. Hence, I am satisfied that all the above infrastructure is fully justified and legally compliant. Conditions 48. I asked the parties to agree a combined (for both the detailed and outline elements of this hybrid application) list of conditions, having first seen earlier drafts of such conditions and commented on them where necessary. This is the list of 80 conditions in the Schedule below. 49. It comprises (Conditions 54-80) the relevant highway and traffic conditions including in respect of the infrastructure set out in items (F)-(U) as well as the highway and parking details et cetera of the estate roads in the scheme itself. 50.

Page 12 · Chunk 40 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision The rest of the conditions (Conditions 1-53) encompass all the other relevant detailed design and other conditions for both the detailed Phase 1 element of the scheme and all the outline elements, including all the reserved matters and the timings for these matters to be concluded. Condition 4 refers to the approved plans for the outline and detailed elements of the scheme, which are respectively set out in Tables 2 and 3, below the Schedule. 51. All the conditions are set out in the Schedule in the form of a table, which lists their numbers, timings, headings/titles and reasons including legal and development plan and other policy documents references. I am satisfied that for all these reasons all these conditions are necessary and otherwise meet the requirements of NPPF paragraph 56. The Section 106 Agreement (S106) 52. The S106 encompasses the infrastructure and affordable housing obligations and also allows for necessary monitoring fees for such to be recouped by WSC and SCC, all as set out and justified above, with reference to the joint CIL Compliance Statement. Conclusions 53. The proposed development would deliver up to 1,375 dwellings in phases, as envisaged by the allocation in the development plan.

Page 12 · Chunk 41 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision It therefore complies in principle with the LPA’s spatial strategy. The detailed (Phase 1) aspect of the scheme would provide 287 well designed dwellings accessed by an appropriate estate road network giving priority to pedestrians and cyclists, with adequate parking and high-quality landscaping all of which would link well to later phases of the development. 54. The hybrid proposal scheme would comply with the development plan when considered as a whole, and there are no other material considerations which outweigh such compliance. It would meet the statutory heritage tests as set out above and Section 149 of the Equality Act 2010 in that it would not cause harm to any person or persons with protected characteristics under that Act (the public sector equality duty). https://www.gov.uk/planning-inspectorate 12

Page 13 · Chunk 42 Appeal Decision

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Appeal Decision Appeal Decision APP/F3545/W/22/3297751 55. As such, and subject to the conditions in the Schedule below and to the S106 obligations, Section 38(6) of the Planning and Compensation Act 2004 and Section 70(2) of the Town and Country Planning Act 1990, as well as paragraph 11 c) of the NPPF, indicate that planning permission should be granted.

Page 13 · Chunk 43 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan INSPECTOR https://www.gov.uk/planning-inspectorate 13 Appeal Decision APP/F3545/W/22/3297751 Schedule of Conditions – Table 1

Page 14 · Chunk 44 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 Schedule of Conditions – Table 1

Page 14 · Chunk 45 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | No. | Timing | Heading | Condition | Reason | | --- | --- | --- | --- | --- | | 1 | | Time limit – detailed phase | The development of the detailed phase hereby permitted shall be commenced no later than 3 years from the date of this permission. | In accordance with Section 91 of the Town and Country Planning Act 1990. | | 2 | | Time limit – outline component | Applications for the approval of the first reserved matters in respect of the outline component of this permission shall be made to the Local Planning Authority before the expiration of three years from the date of this permission. Applications for approval of all reserved matters shall be made to the Local Planning Authority before the expiration of 12 (twelve) years from the date of this permission. The development hereby permitted for a phase of the outline component of this permission shall commence, in the case of each such phase, no later than three years from date of approval of the final reserved matters for the specific phase in question. | To conform with the requirements of Section 92 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |

Page 14 · Chunk 46 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | No. | Timing | Heading | Condition | Reason | | --- | --- | --- | --- | --- | | 3 | Prior to commencement | Reserved matters | Prior to the commencement of development (excluding site preparation) in any outline phase (or any sub-phase or development parcel indicated on the phasing plan) details of the access, appearance, landscaping, layout, and scale (hereinafter called "the reserved matters") for such phase (or sub- phase or development parcel indicated on the Phasing Plan, as relevant) shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out as approved. | Required to be imposed pursuant to Section 92 of the Town and Country Planning Act 1990 (as amended) and to enable to the Local Planning Authority to exercise proper control over these aspects of the development. | | 4 | | Approved plans | The development hereby permitted shall be carried out generally in accordance with the details shown on the following approved plans: *See Tables 2 and 3 below | To ensure the satisfactory development of the site and for the avoidance of doubt as to what has been |

Page 14 · Chunk 47 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 14 Appeal Decision APP/F3545/W/22/3297751

Page 15 · Chunk 48 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 | | | | | considered and approved as part of the outline submission. | | --- | --- | --- | --- | --- | | 5 | Prior to commencement | Phasing plan | Prior to commencement of development (excluding site preparation) a Phasing Plan setting out the details of the phasing of the development shall be submitted to and approved in writing by the Local Planning Authority. The Phasing Plan shall include the following information: a. Details of a phased approach to the submission of reserved matters (if appropriate) to address and cover the relevant phase. Thereafter, the development shall be carried out in complete accordance with the approved Phasing Plan. | The condition is imposed in order to seek high standards of design and comprehensively planned development in accordance with the NPPF and provisions of Core Strategy Policies CS2 and CS3 and policies DM2 and DM22 of the Joint Development Management Policies Document 2015. |

Page 15 · Chunk 49 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | considered and approved as part of the outline submission. | | --- | --- | --- | --- | --- | | 6 | Reserved matters submission | Design statement | Any submission of reserved matters in respect of the outline component of this planning permission shall, as relevant, be accompanied by a Design Statement in respect of the development subject to the relevant reserved matters application for approval by the Local Planning Authority. The Design Statement shall address matters of development layout, building blocks and heights, architectural approaches and materials, the function and treatments of key open spaces, street types and street materials, parking (vehicle and cycle), boundary treatments, hard and soft landscaping, bin storage and collection, lighting of outdoor spaces, measures and strategies to design out opportunities for crime. The development shall be carried out in accordance with the approved details. | These details are required to explain and demonstrate the submission of reserved matters in advance of the development commencing. The condition is imposed in order to seek high standards of design and comprehensively planned development in accordance with the NPPF and provisions of Core Strategy

Page 15 · Chunk 50 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | considered and approved as part of the outline submission. | | --- | --- | --- | --- | --- | Policies CS2 and CS3 and policies DM2 and DM22 of the Joint Development Management Policies Document 2015. | | | | | | considered and approved as part of the outline submission. | | --- | --- | --- | --- | --- | | 7 | Prior to commencement | Archaeological investigation | 1. No development shall take place within each phase or sub- phase until the following have been submitted to and approved in writing by the Local | To safeguard archaeological assets within the approved development | https://www.gov.uk/planning-inspectorate 15 Appeal Decision APP/F3545/W/22/3297751

Page 16 · Chunk 51 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 16 · Chunk 52 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Planning Authority: A. The methodology for an archaeological field evaluation in respect of the phase or sub- phase (which may or may not form part of an evaluation of the entire site); B. The results of an archaeological field evaluation in respect of the phase or sub-phase (which may or may not form part of an evaluation of the entire site) C. A Written Scheme of Investigation for the phase or sub-phase informed by the approved results of the archaeological field evaluation and to include the following: i. An assessment of significance and research questions ii. -The programme and methodology of site investigation and recording. iii. The programme for post investigation assessment. iv. Provision to be made for analysis of the site investigation and recording. v. Provision to be made for publication and dissemination of the analysis and records of the site investigation. vi. Provision to be made for archive deposition of the analysis and records of the site investigation. vii. Nomination of a competent person or persons/organisation to undertake the works set out within the Written Scheme of Investigation. viii. An Archaeological Mitigation Strategy for each phase or sub- phase 2. The Archaeological

Page 16 · Chunk 53 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Mitigation Strategy for each phase or sub- phase shall be implemented in accordance with the approved Written Scheme of Investigation and completed prior to commencement of the relevant | boundary from impacts relating to any groundworks associated with the development scheme and to ensure the proper and timely investigation, recording, reporting and presentation of archaeological assets affected by this development in accordance with policy DM20 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 16 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition is required to be agreed prior to the commencement of any development to ensure matters of archaeological importance are preserved and secured early to ensure avoidance of damage or lost due to the development and/or its construction. If agreement was sought at any later stage there is an unacceptable risk of lost and damage to archaeological and historic assets. | | --- | --- | --- | --- | --- |

Page 16 · Chunk 54 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 16 Appeal Decision APP/F3545/W/22/3297751

Page 17 · Chunk 55 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 17 · Chunk 56 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Phase (or sub-phase) of development. | | | --- | --- | --- | --- | --- | | 8 | Prior to occupation | Investigation/ recording complete | No building within any phase or sub phase shall be occupied until: a. The site investigation and post investigation assessment for the relevant phase or sub phase has been completed, submitted to and approved in writing by the Local Planning Authority, in accordance with the Written Scheme of Investigation approved under Condition 7, and b. Provision has been made for the publication and dissemination of results and archive deposition, and a timetable for this has been submitted to and approved in writing by the Local Planning Authority. The publication and dissemination of results and archive deposition, and further investigations (if required) shall be carried out in accordance with the approved timetables. | To safeguard archaeological assets within the approved development boundary from impacts relating to any groundworks associated with the development scheme and to ensure the proper and timely investigation, recording, reporting and presentation of archaeological assets affected by this development in accordance with policy DM20 of the West Suffolk Joint Development

Page 17 · Chunk 57 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Phase (or sub-phase) of development. | | | --- | --- | --- | --- | --- | Management Policies Document 2015, Chapter 16 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 17 · Chunk 58 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Phase (or sub-phase) of development. | | | --- | --- | --- | --- | --- | Management Policies Document 2015, Chapter 16 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | | | | Phase (or sub-phase) of development. | | | --- | --- | --- | --- | --- | | 9 | Prior to commencement | Remediation strategy | 1. No development within any phase or sub-phase shall take place until a remediation strategy that includes the following components to deal with the risks associated with contamination of the relevant phase or sub-phase has been submitted to and approved, in writing, by the Local Planning Authority: a) A Preliminary Risk Assessment (PRA) including a Conceptual Site Model (CSM) of the relevant phase or sub-phase indicating potential sources, pathways and receptors, including those off site. | To protect and prevent the pollution of controlled waters from potential pollutants associated with current and previous land uses in line with National Planning Policy Framework (NPPF), paragraphs 170, 178, 179 and Environment Agency Groundwater Protection Position Statements. This condition requires matters to be agreed prior to |

Page 17 · Chunk 59 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 17 Appeal Decision APP/F3545/W/22/3297751

Page 18 · Chunk 60 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 18 · Chunk 61 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | |

Page 18 · Chunk 62 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | 10

Page 18 · Chunk 63 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | |

Page 18 · Chunk 64 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Com

Page 18 · Chunk 65 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | pli

Page 18 · Chunk 66 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | anc

Page 18 · Chunk 67 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | e

Page 18 · Chunk 68 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | con

Page 18 · Chunk 69 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | dit

Page 18 · Chunk 70 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ion

Page 18 · Chunk 71 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | |

Page 18 · Chunk 72 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Une

Page 18 · Chunk 73 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | xpe

Page 18 · Chunk 74 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | cte

Page 18 · Chunk 75 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | d

Page 18 · Chunk 76 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | con

Page 18 · Chunk 77 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | tam

Page 18 · Chunk 78 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ina

Page 18 · Chunk 79 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | tio

Page 18 · Chunk 80 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | n

Page 18 · Chunk 81 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | |

Page 18 · Chunk 82 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | If,

Page 18 · Chunk 83 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | dur

Page 18 · Chunk 84 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ing

Page 18 · Chunk 85 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | dev

Page 18 · Chunk 86 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | elo

Page 18 · Chunk 87 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | pme

Page 18 · Chunk 88 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | nt

Page 18 · Chunk 89 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | of

Page 18 · Chunk 90 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | any

Page 18 · Chunk 91 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | pha

Page 18 · Chunk 92 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | se

Page 18 · Chunk 93 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | or

Page 18 · Chunk 94 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | sub

Page 18 · Chunk 95 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | -ph

Page 18 · Chunk 96 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ase

Page 18 · Chunk 97 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ,

Page 18 · Chunk 98 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | con

Page 18 · Chunk 99 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | tam

Page 18 · Chunk 100 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ina

Page 18 · Chunk 101 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | tio

Page 18 · Chunk 102 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | n

Page 18 · Chunk 103 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | not

Page 18 · Chunk 104 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | pre

Page 18 · Chunk 105 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | vio

Page 18 · Chunk 106 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | usl

Page 18 · Chunk 107 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | y

Page 18 · Chunk 108 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ide

Page 18 · Chunk 109 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | nti

Page 18 · Chunk 110 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | fie

Page 18 · Chunk 111 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | d

Page 18 · Chunk 112 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | is

Page 18 · Chunk 113 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | fou

Page 18 · Chunk 114 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | nd

Page 18 · Chunk 115 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | to

Page 18 · Chunk 116 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | be

Page 18 · Chunk 117 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | pre

Page 18 · Chunk 118 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | sen

Page 18 · Chunk 119 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | t

Page 18 · Chunk 120 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | wit

Page 18 · Chunk 121 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | hin

Page 18 · Chunk 122 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | the

Page 18 · Chunk 123 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | rel

Page 18 · Chunk 124 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | eva

Page 18 · Chunk 125 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | nt

Page 18 · Chunk 126 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | pha

Page 18 · Chunk 127 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | se

Page 18 · Chunk 128 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | or

Page 18 · Chunk 129 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | sub

Page 18 · Chunk 130 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | -ph

Page 18 · Chunk 131 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ase

Page 18 · Chunk 132 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | the

Page 18 · Chunk 133 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | n

Page 18 · Chunk 134 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | no

Page 18 · Chunk 135 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | fur

Page 18 · Chunk 136 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | the

Page 18 · Chunk 137 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | r

Page 18 · Chunk 138 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | dev

Page 18 · Chunk 139 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | elo

Page 18 · Chunk 140 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | pme

Page 18 · Chunk 141 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | nt

Page 18 · Chunk 142 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | of

Page 18 · Chunk 143 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | the

Page 18 · Chunk 144 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | rel

Page 18 · Chunk 145 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | eva

Page 18 · Chunk 146 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | nt

Page 18 · Chunk 147 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | pha

Page 18 · Chunk 148 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | se

Page 18 · Chunk 149 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | or

Page 18 · Chunk 150 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | sub

Page 18 · Chunk 151 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | -ph

Page 18 · Chunk 152 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ase

Page 18 · Chunk 153 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | (un

Page 18 · Chunk 154 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | les

Page 18 · Chunk 155 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | s

Page 18 · Chunk 156 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | oth

Page 18 · Chunk 157 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | erw

Page 18 · Chunk 158 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ise

Page 18 · Chunk 159 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | agr

Page 18 · Chunk 160 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | eed

Page 18 · Chunk 161 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | in

Page 18 · Chunk 162 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | wri

Page 18 · Chunk 163 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | tin

Page 18 · Chunk 164 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | g

Page 18 · Chunk 165 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | wit

Page 18 · Chunk 166 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | h

Page 18 · Chunk 167 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | the

Page 18 · Chunk 168 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Loc

Page 18 · Chunk 169 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | al

Page 18 · Chunk 170 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Pla

Page 18 · Chunk 171 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | nni

Page 18 · Chunk 172 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ng

Page 18 · Chunk 173 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Aut

Page 18 · Chunk 174 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | hor

Page 18 · Chunk 175 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ity

Page 18 · Chunk 176 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | )

Page 18 · Chunk 177 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | sha

Page 18 · Chunk 178 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ll

Page 18 · Chunk 179 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | be

Page 18 · Chunk 180 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | car

Page 18 · Chunk 181 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | rie

Page 18 · Chunk 182 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | d

Page 18 · Chunk 183 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | out

Page 18 · Chunk 184 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | unt

Page 18 · Chunk 185 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | il

Page 18 · Chunk 186 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | the

Page 18 · Chunk 187 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | dev

Page 18 · Chunk 188 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | elo

Page 18 · Chunk 189 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | per

Page 18 · Chunk 190 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | has

Page 18 · Chunk 191 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | sub

Page 18 · Chunk 192 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | mit

Page 18 · Chunk 193 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ted

Page 18 · Chunk 194 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | a

Page 18 · Chunk 195 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | rem

Page 18 · Chunk 196 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | edi

Page 18 · Chunk 197 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ati

Page 18 · Chunk 198 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | on

Page 18 · Chunk 199 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | str

Page 18 · Chunk 200 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ate

Page 18 · Chunk 201 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | gy

Page 18 · Chunk 202 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | to

Page 18 · Chunk 203 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | the

Page 18 · Chunk 204 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Loc

Page 18 · Chunk 205 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | al

Page 18 · Chunk 206 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Pla

Page 18 · Chunk 207 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | nni

Page 18 · Chunk 208 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ng

Page 18 · Chunk 209 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Aut

Page 18 · Chunk 210 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | hor

Page 18 · Chunk 211 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ity

Page 18 · Chunk 212 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | det

Page 18 · Chunk 213 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ail

Page 18 · Chunk 214 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ing

Page 18 · Chunk 215 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | how

Page 18 · Chunk 216 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | thi

Page 18 · Chunk 217 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | s

Page 18 · Chunk 218 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | uns

Page 18 · Chunk 219 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | usp

Page 18 · Chunk 220 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ect

Page 18 · Chunk 221 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ed

Page 18 · Chunk 222 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | con

Page 18 · Chunk 223 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | tam

Page 18 · Chunk 224 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ina

Page 18 · Chunk 225 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | tio

Page 18 · Chunk 226 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | n

Page 18 · Chunk 227 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | sha

Page 18 · Chunk 228 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ll

Page 18 · Chunk 229 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | be

Page 18 · Chunk 230 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | dea

Page 18 · Chunk 231 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | lt

Page 18 · Chunk 232 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | wit

Page 18 · Chunk 233 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | h

Page 18 · Chunk 234 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | and

Page 18 · Chunk 235 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | obt

Page 18 · Chunk 236 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ain

Page 18 · Chunk 237 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ed

Page 18 · Chunk 238 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | wri

Page 18 · Chunk 239 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | tte

Page 18 · Chunk 240 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | n

Page 18 · Chunk 241 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | app

Page 18 · Chunk 242 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | rov

Page 18 · Chunk 243 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | al

Page 18 · Chunk 244 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | fro

Page 18 · Chunk 245 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | m

Page 18 · Chunk 246 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | the

Page 18 · Chunk 247 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Loc

Page 18 · Chunk 248 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | al

Page 18 · Chunk 249 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Pla

Page 18 · Chunk 250 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | nni

Page 18 · Chunk 251 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ng

Page 18 · Chunk 252 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | |

Page 18 · Chunk 253 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | To

Page 18 · Chunk 254 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | pro

Page 18 · Chunk 255 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | tec

Page 18 · Chunk 256 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | t

Page 18 · Chunk 257 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | and

Page 18 · Chunk 258 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | pre

Page 18 · Chunk 259 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ven

Page 18 · Chunk 260 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | t

Page 18 · Chunk 261 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | the

Page 18 · Chunk 262 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | pol

Page 18 · Chunk 263 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | lut

Page 18 · Chunk 264 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ion

Page 18 · Chunk 265 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | of

Page 18 · Chunk 266 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | con

Page 18 · Chunk 267 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | tro

Page 18 · Chunk 268 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | lle

Page 18 · Chunk 269 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | d

Page 18 · Chunk 270 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | wat

Page 18 · Chunk 271 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ers

Page 18 · Chunk 272 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | fro

Page 18 · Chunk 273 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | m

Page 18 · Chunk 274 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | pot

Page 18 · Chunk 275 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ent

Page 18 · Chunk 276 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ial

Page 18 · Chunk 277 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | pol

Page 18 · Chunk 278 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | lut

Page 18 · Chunk 279 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ant

Page 18 · Chunk 280 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | s

Page 18 · Chunk 281 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ass

Page 18 · Chunk 282 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | oci

Page 18 · Chunk 283 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ate

Page 18 · Chunk 284 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | d

Page 18 · Chunk 285 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | wit

Page 18 · Chunk 286 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | h

Page 18 · Chunk 287 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | cur

Page 18 · Chunk 288 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ren

Page 18 · Chunk 289 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | t

Page 18 · Chunk 290 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | and

Page 18 · Chunk 291 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | pre

Page 18 · Chunk 292 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | vio

Page 18 · Chunk 293 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | us

Page 18 · Chunk 294 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | lan

Page 18 · Chunk 295 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | d

Page 18 · Chunk 296 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | use

Page 18 · Chunk 297 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | s

Page 18 · Chunk 298 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | in

Page 18 · Chunk 299 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | lin

Page 18 · Chunk 300 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | e

Page 18 · Chunk 301 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | wit

Page 18 · Chunk 302 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | h

Page 18 · Chunk 303 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Nat

Page 18 · Chunk 304 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ion

Page 18 · Chunk 305 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | al

Page 18 · Chunk 306 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Pla

Page 18 · Chunk 307 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | nni

Page 18 · Chunk 308 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ng

Page 18 · Chunk 309 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Pol

Page 18 · Chunk 310 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | icy

Page 18 · Chunk 311 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Fra

Page 18 · Chunk 312 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | mew

Page 18 · Chunk 313 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ork

Page 18 · Chunk 314 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | (NP

Page 18 · Chunk 315 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | PF)

Page 18 · Chunk 316 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ,

Page 18 · Chunk 317 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | par

Page 18 · Chunk 318 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | agr

Page 18 · Chunk 319 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | aph

Page 18 · Chunk 320 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | s

Page 18 · Chunk 321 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | 170

Page 18 · Chunk 322 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ,

Page 18 · Chunk 323 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | 178

Page 18 · Chunk 324 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ,

Page 18 · Chunk 325 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | 179

Page 18 · Chunk 326 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | and

Page 18 · Chunk 327 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Env

Page 18 · Chunk 328 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | iro

Page 18 · Chunk 329 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | nme

Page 18 · Chunk 330 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | nt

Page 18 · Chunk 331 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Age

Page 18 · Chunk 332 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | ncy

Page 18 · Chunk 333 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Gro

Page 18 · Chunk 334 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | und

Page 18 · Chunk 335 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | wat

Page 18 · Chunk 336 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | er

Page 18 · Chunk 337 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Pro

Page 18 · Chunk 338 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | tec

Page 18 · Chunk 339 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | tio

Page 18 · Chunk 340 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | n

Page 18 · Chunk 341 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | Pos

Page 18 · Chunk 342 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | iti

Page 18 · Chunk 343 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | on

Page 18 · Chunk 344 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) The results of a site investigation of the relevant phase or sub-phase based on (a) and a detailed risk assessment, including a revised CSM. c) Based on the risk assessment in (b) an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency actions. The plan shall also detail a long term monitoring and maintenance plan as necessary. 2. No occupation of any part of the permitted development within the relevant phase or sub-phase shall take place until a verification report demonstrating completion of works set out in the remediation strategy in (c) has been submitted to and approved in writing by the Local Planning Authority. The long-term monitoring and maintenance plan in (c) shall be updated, to the extent necessary, and be implemented as approved. | commencement since it relates to consideration of below ground matters that require resolution prior to further development taking place, to ensure any contaminated material is satisfactorily dealt with. | | --- | --- | --- | --- | --- | |

Page 18 · Chunk 345 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 18 Appeal Decision APP/F3545/W/22/3297751

Page 19 · Chunk 346 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 | | | | Authority. The remediation strategy shall be implemented as approved. | Statements. | | --- | --- | --- | --- | --- | | 11 | Compliance condition | Piling/ foundation design | Piling or any other foundation designs and investigation boreholes using penetrative methods shall not be permitted other than with the express written consent of the Local Planning Authority, which may be given for those parts of the site where it has been demonstrated that there is no resultant unacceptable risk to groundwater. The development shall be carried out in accordance with the approved details. | To protect and prevent the pollution of controlled waters from potential pollutants associated with current and previous land uses in line with National Planning Policy Framework (NPPF), paragraphs 170, 178, 179 and Environment Agency Groundwater Protection Position Statements. |

Page 19 · Chunk 347 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Authority. The remediation strategy shall be implemented as approved. | Statements. | | --- | --- | --- | --- | --- | | 12 | Prior to commencement - | Surface water drainage strategy | Prior to commencement of development in any phase or sub phase of the development a surface water drainage scheme for the phase or sub phase shall be submitted to, and approved in writing by, the Local Planning Authority. The scheme shall be in accordance with the approved FRA ref. 5213-FRA-001 and Surface Water Drainage Strategy Addendum dated 14 May 2021 and shall include: a) Dimensioned plans and drawings of the surface water drainage scheme; b) Further infiltration testing on the site in accordance with BRE 365 and the use of infiltration as the means of drainage if the infiltration rates and groundwater levels show it to be possible; c) If the use of infiltration is not possible then modelling shall be submitted to demonstrate that the surface water runoff will be restricted to QBAR or 2l/s/ha for all events up to the critical 1 in 100 year rainfall events including climate change as specified in the FRA; d) Modelling of the surface water drainage scheme to show that the attenuation/infiltration | To ensure that the

Page 19 · Chunk 348 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Authority. The remediation strategy shall be implemented as approved. | Statements. | | --- | --- | --- | --- | --- | principles of sustainable drainage are incorporated into this proposal, to ensure that the proposed development can be adequately drained, in accordance with policy DM6 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 14 of the National Planning Policy Framework and all relevant Core Strategy Policies. The condition is pre- commencement as it may require the installation of below ground infrastructure and details should be secured prior to any ground disturbance taking place. | https://www.gov.uk/planning-inspectorate 19 Appeal Decision APP/F3545/W/22/3297751

Page 20 · Chunk 349 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 20 · Chunk 350 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | features will contain the 1 in 100 year rainfall event including climate change; e) Modelling of the surface water conveyance network in the 1 in 30 year rainfall event to show no above ground flooding, and modelling of the volumes of any above ground flooding from the pipe network in a 1 in 100 year rainfall event including climate change, along with topographic plans showing where the water will flow and be stored to ensure no flooding of buildings or offsite flows; f) Topographical plans depicting all exceedance flow paths and demonstration that the flows would not flood buildings or flow offsite, and if they are to be directed to the surface water drainage system then the potential additional rates and volumes of surface water must be included within the modelling of the surface water system; g) Details of the maintenance and management of the surface water drainage scheme. h) Details of a Construction Surface Water Management Plan (CSWMP) detailing how surface water and storm water will be managed on the site during construction (including demolition and site clearance operations) The CSWMP shall include: Method statements, scaled and dimensioned plans and drawings detailing surface water management

Page 20 · Chunk 351 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan proposals to include:- i. Temporary drainage systems ii. Measures for managing pollution / water quality and protecting controlled waters and watercourses iii. Measures for managing any on or offsite flood risk associated | | | --- | --- | --- | --- | --- | https://www.gov.uk/planning-inspectorate 20 Appeal Decision APP/F3545/W/22/3297751

Page 21 · Chunk 352 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 21 · Chunk 353 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | with construction The scheme shall be fully implemented as approved | | | --- | --- | --- | --- | --- | | 13 | Within 28 days of practical completion | Surface water drainage verification report | Within 28 days of practical completion of the last dwelling/building in each phase, a surface water drainage verification report shall be submitted to the Local Planning Authority, detailing and verifying that the surface water drainage system has been inspected and has been built and functions in accordance with the approved designs and drawings. The report shall include details of all SuDS components and piped networks, in an agreed form, for inclusion on the Lead Local Flood Authority’s Flood Risk Asset Register. | To ensure that the surface water drainage system has been built in accordance with the approved drawings and is fit to be put into operation and to ensure that the Sustainable Drainage System has been implemented as permitted and that all flood risk assets and their owners are recorded onto the LLFA’s statutory flood risk asset register as required under s21 of the Flood and Water Management Act 2010 in order to enable the proper management of flood risk with the county of Suffolk. |

Page 21 · Chunk 354 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | with construction The scheme shall be fully implemented as approved | | | --- | --- | --- | --- | --- | | 14 | Prior to commencement | Foul drainage | Prior to the commencement of development within any phase or sub phase, a scheme for on-site foul water drainage works within the relevant phase, including connection point and discharge rate, shall be submitted to and approved in writing by the Local Planning Authority. Prior to the occupation of any part of the development within the relevant phase or sub phase, the foul water drainage works relating to that phase must have been carried out in accordance with the approved scheme. | To ensure that the principles of sustainable drainage are incorporated into this proposal, to ensure that the proposed development can be adequately drained, in accordance with policy DM6 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 14 of the National Planning Policy Framework |

Page 21 · Chunk 355 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 21 Appeal Decision APP/F3545/W/22/3297751

Page 22 · Chunk 356 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 22 · Chunk 357 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | and all relevant Core Strategy Policies. The condition is pre- commencement as it may require the installation of below ground infrastructure and details should be secured prior to any ground disturbance taking place. | | --- | --- | --- | --- | --- | | 15 | Prior to commencement | Fire hydrants | Prior to commencement of development within any phase or sub- phase a scheme for the provision of fire hydrants within the relevant phase or sub-phase shall be submitted to and approved in writing by the Local Planning Authority. No part of the development within the relevant phase or sub-phase shall be occupied or brought into use until the fire hydrants for the relevant phase or sub-phase have been provided in accordance with the approved scheme. Thereafter the hydrants shall be retained in their approved form unless the prior written consent of the Local Planning Authority is obtained for any variation. | To ensure the adequate supply of water for firefighting and community safety, in accordance with policy DM2 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 8 and 12 of the National Planning Policy Framework and all relevant Core Strategy Policies. The condition is pre-

Page 22 · Chunk 358 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | and all relevant Core Strategy Policies. The condition is pre- commencement as it may require the installation of below ground infrastructure and details should be secured prior to any ground disturbance taking place. | | --- | --- | --- | --- | --- | commencement as it may require the installation of below ground infrastructure and details should be secured prior to any ground disturbance taking place. |

Page 22 · Chunk 359 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | and all relevant Core Strategy Policies. The condition is pre- commencement as it may require the installation of below ground infrastructure and details should be secured prior to any ground disturbance taking place. | | --- | --- | --- | --- | --- | commencement as it may require the installation of below ground infrastructure and details should be secured prior to any ground disturbance taking place. |

Page 22 · Chunk 360 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | and all relevant Core Strategy Policies. The condition is pre- commencement as it may require the installation of below ground infrastructure and details should be secured prior to any ground disturbance taking place. | | --- | --- | --- | --- | --- | | 16 | Prior to commencement | Retrofitting heat pumps | Prior to commencement of development within the detailed phase, details showing how dwellings that will have gas fired boilers installed within this phase can have heat pumps retrofitted shall be submitted and approved by the Local Planning Authority. The information submitted will confirm appropriate cupboard and space allocations for indoor equipment (including hot water tanks, pipes and pumps and internal | To ensure that the proposal meets with the requirements of sustainability, in accordance with policy DM7 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 14 of the National Planning |

Page 22 · Chunk 361 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 22 Appeal Decision APP/F3545/W/22/3297751

Page 23 · Chunk 362 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 | | | | units) and outdoor equipment with scale drawings of indicative locations, and also including confirming that the outdoor units could be installed without causing significant noise issues for residents. | Policy Framework and all relevant Core Strategy Policies. The condition is pre- commencement to ensure that units are constructed in such a manner so as not to prejudice the installation of an alternative means of heating at a later date. | | --- | --- | --- | --- | --- | | 17 | Compliance condition | Water consumption | No individual dwelling or flat hereby approved shall be occupied until the requirement for water consumption (110 litres use per person per day) in Part G2, Regulation 36 of the Building Regulations (2016) has been secured in accordance with Policy DM7 of the Joint Development Management Policies Document (2015). | Reason: To ensure that reasonable provision is made by the installation of fittings and fixed appliances that use water efficiently for the prevention of undue consumption of water in accordance with the Building Regulations (2016) and in accordance with Policy DM7 of the Joint Development Management Policies Document (2015). |

Page 23 · Chunk 363 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | units) and outdoor equipment with scale drawings of indicative locations, and also including confirming that the outdoor units could be installed without causing significant noise issues for residents. | Policy Framework and all relevant Core Strategy Policies. The condition is pre- commencement to ensure that units are constructed in such a manner so as not to prejudice the installation of an alternative means of heating at a later date. | | --- | --- | --- | --- | --- | | 18 | Compliance condition | Retention of public open spaces | The public open spaces (and other similar spaces) identified hereby approved as shown on Drawing No. 1446/002RevP shall, once completed, thereafter be retained and maintained with public access and made available for public use in perpetuity. | Reason: To ensure the public open spaces and other similar spaces secured from the development and made available for public use in perpetuity. The requirements of this condition accord with the requirements of the NPPF policy CS14 of the St Edmundsbury Core Strategy (2010) and policy DM42 of the Joint Development |

Page 23 · Chunk 364 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 23 Appeal Decision APP/F3545/W/22/3297751

Page 24 · Chunk 365 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 24 · Chunk 366 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | Management Policies document (2015). | | --- | --- | --- | --- | --- | | 19 | Prior to commencement | Noise Impact Assessment and Acoustic Design Statement | Prior to any above ground work being carried out within any phase or sub- phase a Noise Impact Assessment and Acoustic Design Statement for the relevant phase or sub-phase demonstrating that relevant good acoustic design principles for the suitable protection of future occupants from noise associated with the A143 and the railway line shall be secured, shall be submitted to and approved in writing by the local planning authority. Thereafter, the development within the relevant phase or sub-phase shall be constructed in accordance with the approved details and no individual dwelling or flat within the relevant phase or sub-phase, shall be occupied until those measures have been provided and/or incorporated into the design of the dwelling or flat concerned. The adopted noise mitigation strategy for dwelling units within each Phase or sub-phase shall be such to ensure noise does not exceed an LAeq (16hrs) of 35dB (A) within bedrooms and living rooms between 07:00 and 23:00hrs and an LAeq (8hrs) of 30dB(A) within bedrooms and living rooms between 23:00

Page 24 · Chunk 367 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | Management Policies document (2015). | | --- | --- | --- | --- | --- | and 07:00hrs, and individual noise events from passing trains do not exceed 45dB LAmax,f more than 10x a night within bedrooms. The noise levels specified in this condition shall be achieved with the windows closed and other means of ventilation provided. | To ensure that the residential development is protected from existing noise sources, in accordance with policies DM2, DM22 and DM14 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 24 · Chunk 368 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | Management Policies document (2015). | | --- | --- | --- | --- | --- | and 07:00hrs, and individual noise events from passing trains do not exceed 45dB LAmax,f more than 10x a night within bedrooms. The noise levels specified in this condition shall be achieved with the windows closed and other means of ventilation provided. | To ensure that the residential development is protected from existing noise sources, in accordance with policies DM2, DM22 and DM14 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | | | | | Management Policies document (2015). | | --- | --- | --- | --- | --- | | 20 | Compliance condition | Construction hours | Demolition or construction works shall not take place outside 08:00 hours to 18:00 hours Mondays to Fridays and 08:00 hours to 13:00 hours on Saturdays and at no time on Sundays, public holidays or bank holidays. | To protect the amenity of occupiers of adjacent properties from noise and disturbance, in accordance with policies DM2 and DM14 of the West |

Page 24 · Chunk 369 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | Management Policies document (2015). | | --- | --- | --- | --- | --- | | 20 | Compliance condition | Construction hours | Demolition or construction works shall not take place outside 08:00 hours to 18:00 hours Mondays to Fridays and 08:00 hours to 13:00 hours on Saturdays and at no time on Sundays, public holidays or bank holidays. | To protect the amenity of occupiers of adjacent properties from noise and disturbance, in accordance with policies DM2 and DM14 of the West | https://www.gov.uk/planning-inspectorate 24 Appeal Decision APP/F3545/W/22/3297751

Page 25 · Chunk 370 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 | | | | | Suffolk Joint Development Management Policies Document 2015, Chapter 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 21 | Compliance condition | No burning of waste | The burning of any waste arising from the development hereby permitted shall be prohibited at any time within the site. | To ensure that the development will not have a negative impact on ground and surface water and to protect the amenity of adjacent areas, in accordance with policies DM6 and DM32 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 14 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 25 · Chunk 371 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | Suffolk Joint Development Management Policies Document 2015, Chapter 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 21 | Compliance condition | No burning of waste | The burning of any waste arising from the development hereby permitted shall be prohibited at any time within the site. | To ensure that the development will not have a negative impact on ground and surface water and to protect the amenity of adjacent areas, in accordance with policies DM6 and DM32 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 14 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 25 · Chunk 372 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | Suffolk Joint Development Management Policies Document 2015, Chapter 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 22 | No development above slab level | Materials | No development above slab level within any phase or sub-phase shall take place until details of the external materials for the buildings within the relevant phase or sub-phase have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. | To safeguard the character and appearance of the area, in accordance with policy DM2 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 12 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 25 · Chunk 373 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | Suffolk Joint Development Management Policies Document 2015, Chapter 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 23 | Prior to commencement | Residents building | Prior to commencement of the detailed phase a timetable for the delivery of the Residents/Community Building shall be submitted to and approved in writing by the Local Planning Authority. The Residents/Community building and its associated infrastructure shall be | To ensure the timely delivery of the necessary infrastructure to meets the needs of the community in accordance with Core Strategy Policy | https://www.gov.uk/planning-inspectorate 25

Page 25 · Chunk 374 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 25 Appeal Decision APP/F3545/W/22/3297751

Page 26 · Chunk 375 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 26 · Chunk 376 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | constructed in accordance with the approved details. | CS14. This condition is pre- commencement to ensure that sufficient information is submitted to ensure that the residents/community building will be constructed and available for use at the appropriate time. | | --- | --- | --- | --- | --- | | 24 | Reserved matters submission | Soft landscaping – outline | Any submission of reserved matters in respect of the outline component of this planning permission and which seeks approval of landscape matters shall include a scheme of soft landscaping for the areas of the site included in that particular reserved matters submission for approval by the Local Planning Authority. The scheme shall be in accordance with the Landscaping Strategy ref. 1546/023 Rev E. The plan/s shall be drawn to a scale of not less than 1:200 and shall include accurate indications of the position, species, girth, canopy spread and height of all existing trees and hedgerows on and adjacent to that part of the site and details of any to be retained, together with measures for their protection during the course of development. The scheme shall also include details of the siting, design, height and materials of the screen walls/fences to be

Page 26 · Chunk 377 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | constructed in accordance with the approved details. | CS14. This condition is pre- commencement to ensure that sufficient information is submitted to ensure that the residents/community building will be constructed and available for use at the appropriate time. | | --- | --- | --- | --- | --- | constructed or erected. The plan/s shall include details of how any areas of public open space shall be protected from incursion by vehicles. All planting comprised in the approved details of landscaping shall be carried out in the first planting season following the commencement of the development within the area subject to the scheme (or within such extended and/or phased period as may first be agreed in writing with the Local Planning Authority). Any retained trees or planting removed, | To enhance the appearance of the development in the interests of the character and appearance of the area in accordance with the NPPF, the provisions of Policies CS2 and CS3 of the St Edmundsbury Core Strategy (2010) and policies DM2 and DM22 of the Joint Development Management Policies Document (2015). These details are required with the reserved matters submission/s and prior to the commencement of development in order to define

Page 26 · Chunk 378 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | constructed in accordance with the approved details. | CS14. This condition is pre- commencement to ensure that sufficient information is submitted to ensure that the residents/community building will be constructed and available for use at the appropriate time. | | --- | --- | --- | --- | --- | the scope of the soft landscaping details required to accompany reserved matters. | https://www.gov.uk/planning-inspectorate 26 Appeal Decision APP/F3545/W/22/3297751

Page 27 · Chunk 379 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 27 · Chunk 380 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | dying or becoming seriously damaged or diseased within five years of commencement shall be replaced within the first available planting season thereafter with trees or planting of similar size and species unless the Local Planning Authority gives written consent for any variation. | | | --- | --- | --- | --- | --- | | 25 | No development above ground level | Soft landscaping – detailed phase | No development above ground level within the detailed phase shall take place until a scheme of soft landscaping for such phase drawn to a scale of not less than 1:200 has been submitted to and approved in writing by the Local Planning Authority. The soft landscaping details shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants noting species, plant sizes and proposed numbers/ densities. The details shall include planting to enhance Severals Clump and the means to prevent vehicles incursion onto any area of public open space. The approved scheme of soft landscaping works shall be implemented not later than the first planting season following commencement of the detailed phase (or within such extended period as

Page 27 · Chunk 381 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | dying or becoming seriously damaged or diseased within five years of commencement shall be replaced within the first available planting season thereafter with trees or planting of similar size and species unless the Local Planning Authority gives written consent for any variation. | | | --- | --- | --- | --- | --- | may first be agreed in writing with the Local Planning Authority). Any planting removed, dying or becoming seriously damaged or diseased within five years of planting shall be replaced within the first available planting season thereafter with planting of similar size and species unless the Local Planning Authority gives written consent for any variation. | To assimilate the development into its surroundings and protect the character and appearance of the area, in accordance with policies DM2, DM12 and DM13 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 27 · Chunk 382 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | dying or becoming seriously damaged or diseased within five years of commencement shall be replaced within the first available planting season thereafter with trees or planting of similar size and species unless the Local Planning Authority gives written consent for any variation. | | | --- | --- | --- | --- | --- | | 26 | Reserved matters submission | Hard landscaping - outline | Any submission of reserved matters in respect of the outline component of this planning permission and which seeks the approval of landscape matters shall include full details of a hard landscaping scheme for the areas of the site included in that particular Reserved Matters submission for | To enhance the appearance of the development in the interests of the character and appearance of the area in accordance with the NPPF, the |

Page 27 · Chunk 383 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 27 Appeal Decision APP/F3545/W/22/3297751

Page 28 · Chunk 384 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 28 · Chunk 385 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | approval by the Local Planning Authority. These details shall include existing and proposed finished ground levels and contours showing earthworks and mounding; means of enclosure; car parking layouts; other vehicle and pedestrian access and circulations areas; hard surfacing materials; minor artefacts and structures (for example street furniture, and similar features); how the boundary between public and private land will be defined and barriers to prevent vehicular access onto any areas of public open space; hedgehog gaps in boundary features; proposed and existing functional services above and below ground (for example power, communications cables and pipelines, indicating lines, manholes, supports and other technical features). The approved scheme shall be implemented in accordance with a timetable to be agreed as part of the submission of the hard landscaping details. The hard landscaping scheme shall include a landscape management plan, including long term design objectives, management responsibilities and maintenance schedules for all hard landscape areas (other than small privately owned domestic or communal gardens and adoptable roads and adoptable footpaths) together with a timetable for the

Page 28 · Chunk 386 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan implementation of the landscape management plan and it shall be implemented in accordance with the approved details and timetable. | provisions of Policies CS2 and CS3 of the St Edmundsbury Core Strategy (2010) and policies DM2 and DM22 of the Joint Development Management Policies Document (2015). These details are required with the reserved matters submission/s and prior to the commencement of development in order to define the scope of the hard landscaping details required to accompany reserved matters. | | --- | --- | --- | --- | --- | | 27 | No development above ground level | Hard landscaping – detailed phase | No development above ground level within the detailed phase shall take place until details of a hard landscaping scheme for such phase have been submitted to and approved in writing by the Local Planning Authority. These details shall include proposed finished levels and contours showing earthworks and mounding; surfacing materials; means of enclosure; car parking layouts; other vehicle and pedestrian access and | To assimilate the development into its surroundings and protect the character and appearance of the area, in accordance with policies DM2 and DM13 of the West Suffolk Joint Development Management

Page 28 · Chunk 387 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Policies | https://www.gov.uk/planning-inspectorate 28 Appeal Decision APP/F3545/W/22/3297751

Page 29 · Chunk 388 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 29 · Chunk 389 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | circulations areas; hard surfacing materials; minor artefacts and structures (for example furniture, play equipment, refuse and/or other storage units, signs, lighting and similar features); proposed and existing functional services above and below ground (for example drainage, power, communications cables and pipelines, indicating lines, manholes, supports and other technical features); retained historic landscape features and proposals for restoration where relevant. The approved scheme shall be implemented in accordance with a timetable to be agreed as part of the submission of the hard landscaping details. The hard landscaping scheme shall include a landscape management plan, including long term design objectives, management responsibilities and maintenance schedules for all hard landscape areas (other than small privately owned domestic or communal gardens and adoptable roads and adoptable footpaths) together with a timetable for the implementation of the landscape management plan and it shall be implemented in accordance with the approved details and timetable. | Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | ---

Page 29 · Chunk 390 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | --- | | 28 | Prior to development above ground level | Landscape and Ecology Management Plan (LEMP) | No development above ground level within any phase or sub-phase shall take place until a landscape and ecology management plan (LEMP) for all soft landscape areas within the relevant phase or sub-phase (other than small privately owned domestic gardens), including the Countryside Park, Several Clump and the open space adjacent to Hedgerows H1 and H2 (Tree Survey Report AIA AMS – Appendix A) has been submitted to and approved in writing by the Local Planning Authority. The content of the LEMP shall include the following: a) Description and evaluation of features to be managed including a plan b) Ecological trends and constraints on site that might | To ensure the longevity of the landscaping scheme and protect the visual amenity and character of the area, in accordance with policy DM12 and DM13 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 29 · Chunk 391 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 29 Appeal Decision APP/F3545/W/22/3297751

Page 30 · Chunk 392 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 30 · Chunk 393 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | influence management. c) Aims and objectives of management. d) Appropriate management options for achieving aims and objectives. e) Prescriptions for management actions including a plan. f) Preparation of a work schedule and timetable for delivery (including an annual work plan capable of being rolled forward over a five-year period). g) Details of the body or organization responsible for implementation of the plan. h) Ongoing monitoring and remedial measures. i) Details of the legal and funding mechanism(s) by which the long-term implementation of the plan will be secured by the developer with the management body(ies) responsible for its delivery. j) Where the results from monitoring show that conservation aims and objectives of the LEMP are not being met, details of how contingencies and/or remedial action will be identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme. k) Details of the management of existing elm hedgerows including G8 and G23 (as shown on Tree Survey Report AIA AMS – Appendix A) The approved LEMP for the relevant phase or sub-phase shall be carried out in accordance with the approved details

Page 30 · Chunk 394 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan and timetable. | | | --- | --- | --- | --- | --- | | 29 | Prior to commencement | Arboricultural method statement | Prior to commencement of development within any phase or sub- phase a Specific Arboricultural Method Statement (AMS) (including any demolition, groundworks and site clearance) for the relevant phase or | To ensure that the trees on site are adequately protected, to safeguard the character and | https://www.gov.uk/planning-inspectorate 30 Appeal Decision APP/F3545/W/22/3297751

Page 31 · Chunk 395 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 31 · Chunk 396 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | sub-phase shall be submitted to and approved in writing by the Local Planning Authority. The AMS should include details of the following: a) Measures for the protection of those trees and hedges within the relevant phase that are to be retained, b) Details of all construction measures within the 'Root Protection Area' (RPA) (defined by a radius of dbh x 12 where dbh is the diameter of the trunk measured at a height of 1.5m above ground level or for veteran and ancient trees the buffer zone recommendations in the Natural England and Forestry Commission standing advice should be followed) of those trees within the relevant phase which are to be retained specifying the position, depth, and method of construction/installation/excava tion of service trenches, building foundations, hardstandings, roads and footpaths, c) A schedule of proposed surgery works to be undertaken to those trees and hedges on the application site which are to be retained. d) Details of any work within the RPA to existing trees and hedges to be retained including the formation of access routes through hedges, measures for supervision of works within the RPA, and monitoring throughout construction e) Details of any intended works to

Page 31 · Chunk 397 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan veteranise existing trees together with detailed proposals for the tunnelling of services through hedgerow (H1), as shown on Drawing 2 of 12 Tree Survey Report AIA AMS - Appendix A. | appearance of the area, in accordance with policy DM12 and DM13 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition requires matters to be agreed prior to commencement of development to ensure that existing trees are adequately protected prior to any ground disturbance. | | --- | --- | --- | --- | --- | https://www.gov.uk/planning-inspectorate 31 Appeal Decision APP/F3545/W/22/3297751

Page 32 · Chunk 398 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 32 · Chunk 399 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | The development shall be carried out in accordance with the approved AMS unless agreed in writing by the Local Planning Authority. | | | --- | --- | --- | --- | --- | | 30 | Reserved matters submission | Levels | Any submission of reserved matters in respect of the outline component of this planning permission shall include details of any earthworks / changes in levels to be carried out within the area in relation to that reserved matters application together with a timetable for their implementation for approval by the Local Planning Authority. These details shall include the proposed grading and mounding of land areas including the levels and contours to be formed, showing the relationship of the proposed mounding or excavation to existing vegetation and surrounding landform. Development shall be carried out in accordance with the approved details and timetable. | To ensure a satisfactory landform in the interests of visual amenity and the retention of existing landscape features within the locality, in accordance with policies DM2 and DM13 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy

Page 32 · Chunk 400 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | The development shall be carried out in accordance with the approved AMS unless agreed in writing by the Local Planning Authority. | | | --- | --- | --- | --- | --- | Policies. These details are required with the reserved matters submission/s and prior to the commencement of development as it concerns the topography of the site and it is necessary to agree the details prior to any ground disturbance taking place. |

Page 32 · Chunk 401 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | The development shall be carried out in accordance with the approved AMS unless agreed in writing by the Local Planning Authority. | | | --- | --- | --- | --- | --- | Policies. These details are required with the reserved matters submission/s and prior to the commencement of development as it concerns the topography of the site and it is necessary to agree the details prior to any ground disturbance taking place. | | | | | The development shall be carried out in accordance with the approved AMS unless agreed in writing by the Local Planning Authority. | | | --- | --- | --- | --- | --- | | 31 | Prior to commencement | Levels | Prior to commencement of development within the detailed phase details of any earthworks / changes in levels to be carried out within such phase together with a timetable for their implementation have been submitted to and approved in writing by the Local Planning Authority. These details shall include the proposed grading and mounding of land areas as well as the levels and contours to | To ensure a satisfactory landform in the interests of visual amenity and the retention of existing landscape features within the locality, in accordance with policies DM2 and DM13 of the West |

Page 32 · Chunk 402 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 32 Appeal Decision APP/F3545/W/22/3297751

Page 33 · Chunk 403 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 33 · Chunk 404 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | be formed, showing the relationship of the proposed mounding or excavation to existing vegetation and surrounding landform. Development shall be carried out in accordance with the approved details and timetable. | Suffolk Joint Development Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. The condition is pre- commencement as it concerns the topography of the site and it is necessary to agree the details prior to any ground disturbance taking place. | | --- | --- | --- | --- | --- | | 32 | Prior to above ground development | Lighting strategy | Prior to commencement of above ground works within each phase or sub-phase a lighting design strategy for bio-diversity shall be submitted for the relevant phase or sub-phase. The strategy shall: a) Identify those areas/features on site that are particularly sensitive and that are likely to be disturbed by lighting; and b) Show how and where external lighting will be installed (through the provision of appropriate lighting contour plans and technical specifications) to demonstrate that areas to be lit will not disturb any sensitive features identified or prevent any species using

Page 33 · Chunk 405 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | be formed, showing the relationship of the proposed mounding or excavation to existing vegetation and surrounding landform. Development shall be carried out in accordance with the approved details and timetable. | Suffolk Joint Development Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. The condition is pre- commencement as it concerns the topography of the site and it is necessary to agree the details prior to any ground disturbance taking place. | | --- | --- | --- | --- | --- | their territory or having access to their breeding sites and resting places. All external lighting shall be installed in accordance with the specifications and locations set out in the strategy, and these shall be maintained thereafter in accordance with the strategy. No other external lighting shall be installed without prior consent from the Local Planning Authority. | To safeguard the visual amenities of the locality and the ecological value of the area, in accordance with policies DM2 and DM12 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 15 of the National Planning Policy Framework and all relevant Core

Page 33 · Chunk 406 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | be formed, showing the relationship of the proposed mounding or excavation to existing vegetation and surrounding landform. Development shall be carried out in accordance with the approved details and timetable. | Suffolk Joint Development Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. The condition is pre- commencement as it concerns the topography of the site and it is necessary to agree the details prior to any ground disturbance taking place. | | --- | --- | --- | --- | --- | Strategy Policies. | https://www.gov.uk/planning-inspectorate 33 Appeal Decision APP/F3545/W/22/3297751

Page 34 · Chunk 407 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 34 · Chunk 408 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 33 | Prior to the construction of the northern access | Northern access – soft landscaping | Prior to the construction of the Northern Access Roundabout as shown on Drawing No. 70055213-SK- 011 H a detailed soft landscape scheme for the access point shall be submitted to and approved in writing by the local planning authority. The scheme shall be carried out in accordance with the approved details. | To assimilate the development into its surroundings and protect the character and appearance of the area, in accordance with policies DM2 and DM13 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 34 | Prior to the construction of the southern access | Southern access – soft landscaping | Prior to the construction of the Southern Access Roundabout as shown on Drawing No. 70055213-SK- 010 F a detailed soft landscape scheme for the access point shall be submitted to and approved in writing by the local planning authority. The scheme shall be carried out in accordance with the approved details. | To assimilate the development into its surroundings and protect the

Page 34 · Chunk 409 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 33 | Prior to the construction of the northern access | Northern access – soft landscaping | Prior to the construction of the Northern Access Roundabout as shown on Drawing No. 70055213-SK- 011 H a detailed soft landscape scheme for the access point shall be submitted to and approved in writing by the local planning authority. The scheme shall be carried out in accordance with the approved details. | To assimilate the development into its surroundings and protect the character and appearance of the area, in accordance with policies DM2 and DM13 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | character and appearance of the area, in accordance with policies DM2 and DM13 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 34 · Chunk 410 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 33 | Prior to the construction of the northern access | Northern access – soft landscaping | Prior to the construction of the Northern Access Roundabout as shown on Drawing No. 70055213-SK- 011 H a detailed soft landscape scheme for the access point shall be submitted to and approved in writing by the local planning authority. The scheme shall be carried out in accordance with the approved details. | To assimilate the development into its surroundings and protect the character and appearance of the area, in accordance with policies DM2 and DM13 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 35 | Prior to commencement | Green Infrastructure and Landscape Strategy | Prior to the commencement of development within any phase or sub phase a Green Infrastructure and Landscape Strategy shall be submitted to and approved in writing by the local planning authority. The Strategy shall demonstrate how the development within the relevant phase or sub phase accords with the Green Infrastructure parameter plan 2742A1205PLE and the Landscape | To assimilate the

Page 34 · Chunk 411 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 33 | Prior to the construction of the northern access | Northern access – soft landscaping | Prior to the construction of the Northern Access Roundabout as shown on Drawing No. 70055213-SK- 011 H a detailed soft landscape scheme for the access point shall be submitted to and approved in writing by the local planning authority. The scheme shall be carried out in accordance with the approved details. | To assimilate the development into its surroundings and protect the character and appearance of the area, in accordance with policies DM2 and DM13 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | development into its surroundings and protect the character and appearance of the area, in accordance with policies DM2, DM12 and DM13 of the West Suffolk Joint Development |

Page 34 · Chunk 412 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 34 Appeal Decision APP/F3545/W/22/3297751

Page 35 · Chunk 413 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 35 · Chunk 414 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Strategy 1546/023 Rev E September 2021 and shall include: a. A green infrastructure plan to show the GI across the development and how it connects into existing and proposed GI; b. A summary of how each aspect of the GI will be managed, including any habitats across the site; c. How GI will be phased to ensure it is delivered in a timely and appropriate manner so that the new residents have sufficient GI for their daily needs; and d. How the proposed GI will be monitored post-development to measure its effectiveness, in terms of the environment, residents and the local community. | Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition requires matters to be agreed prior to commencement of development to ensure that the principles of good green infrastructure and landscape design are incorporated into the scheme. | | --- | --- | --- | --- | --- | | 36 | Prior to above ground works | Ecological masterplan | Prior to commencement of any above ground works within any phase or sub-phase an ecological masterplan for the relevant phase or sub-phase shall be submitted to and approved in writing by the local planning

Page 35 · Chunk 415 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Strategy 1546/023 Rev E September 2021 and shall include: a. A green infrastructure plan to show the GI across the development and how it connects into existing and proposed GI; b. A summary of how each aspect of the GI will be managed, including any habitats across the site; c. How GI will be phased to ensure it is delivered in a timely and appropriate manner so that the new residents have sufficient GI for their daily needs; and d. How the proposed GI will be monitored post-development to measure its effectiveness, in terms of the environment, residents and the local community. | Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition requires matters to be agreed prior to commencement of development to ensure that the principles of good green infrastructure and landscape design are incorporated into the scheme. | | --- | --- | --- | --- | --- | authority. The masterplan shall detail the locations, numbers and designs of proposed additional avoidance and mitigation measures as set out within the Environmental Statement (chapter 8) including but not restricted to: a) log and brash piles using arisings from Site

Page 35 · Chunk 416 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Strategy 1546/023 Rev E September 2021 and shall include: a. A green infrastructure plan to show the GI across the development and how it connects into existing and proposed GI; b. A summary of how each aspect of the GI will be managed, including any habitats across the site; c. How GI will be phased to ensure it is delivered in a timely and appropriate manner so that the new residents have sufficient GI for their daily needs; and d. How the proposed GI will be monitored post-development to measure its effectiveness, in terms of the environment, residents and the local community. | Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition requires matters to be agreed prior to commencement of development to ensure that the principles of good green infrastructure and landscape design are incorporated into the scheme. | | --- | --- | --- | --- | --- | clearance b) a range of bird nesting boxes on buildings and trees including swift bricks c) provision of refuge and hibernation opportunities such as log piles and purpose-built hibernacula d) installation of a range of bat boxes on trees and built structures e) gaps in

Page 35 · Chunk 417 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Strategy 1546/023 Rev E September 2021 and shall include: a. A green infrastructure plan to show the GI across the development and how it connects into existing and proposed GI; b. A summary of how each aspect of the GI will be managed, including any habitats across the site; c. How GI will be phased to ensure it is delivered in a timely and appropriate manner so that the new residents have sufficient GI for their daily needs; and d. How the proposed GI will be monitored post-development to measure its effectiveness, in terms of the environment, residents and the local community. | Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition requires matters to be agreed prior to commencement of development to ensure that the principles of good green infrastructure and landscape design are incorporated into the scheme. | | --- | --- | --- | --- | --- | boundary fencing and use of dropped kerbs and off-set gully pots in appropriate locations to allow movement of wildlife such as Hedgehogs and amphibians. The development shall be carried out in accordance with the approved | To safeguard the ecological and nature

Page 35 · Chunk 418 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Strategy 1546/023 Rev E September 2021 and shall include: a. A green infrastructure plan to show the GI across the development and how it connects into existing and proposed GI; b. A summary of how each aspect of the GI will be managed, including any habitats across the site; c. How GI will be phased to ensure it is delivered in a timely and appropriate manner so that the new residents have sufficient GI for their daily needs; and d. How the proposed GI will be monitored post-development to measure its effectiveness, in terms of the environment, residents and the local community. | Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition requires matters to be agreed prior to commencement of development to ensure that the principles of good green infrastructure and landscape design are incorporated into the scheme. | | --- | --- | --- | --- | --- | conservation value of the area, in accordance with policy DM12 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 35 · Chunk 419 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 35 Appeal Decision APP/F3545/W/22/3297751

Page 36 · Chunk 420 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 36 · Chunk 421 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | details. | | | --- | --- | --- | --- | --- | | 37 | Prior to commencement | Construction Environmental Management Plan | Prior to commencement of development in any phase or sub- phase (including demolition, ground works, vegetation clearance) a construction environmental management plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall be based on updated surveys for protected and notable species where appropriate and shall include the following: a) Risk assessment of potentially damaging construction activities b) Identification of "biodiversity protection zones" c) Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements) d) The location and timing of sensitive works to avoid harm to biodiversity features e) The times during construction when specialist ecologists need to be present on site to oversee works f) Responsible persons and lines of communication g) The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person h) Use of protective fences, exclusion barriers and warning signs. i) Method

Page 36 · Chunk 422 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | details. | | | --- | --- | --- | --- | --- | statement for all site clearance which shall incorporate supervision by an appropriately qualified person The approved CEMP shall be adhered to and implemented throughout the construction period for the relevant phase strictly in accordance with the approved details, unless otherwise agreed in writing by the Local Planning Authority. | To safeguard the ecological and nature conservation value of the area, in accordance with policy DM12 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition requires matters to be agreed prior to commencement to ensure that appropriate protection measures etc. are put into place to avoid harm and disturbance to local wildlife and the ecological value of the area. |

Page 36 · Chunk 423 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 36 Appeal Decision APP/F3545/W/22/3297751

Page 37 · Chunk 424 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 37 · Chunk 425 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 38 | Prior to commencement | Badger survey | Prior to commencement of development in any phase or sub- phase a badger survey for such phase or sub-phase shall be undertaken and details of the survey along with an updated mitigation plan and method statement implementing any such mitigation shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. | To identify and ensure the protection of important species and those protected by legislation, in accordance with policies DM11 and DM12 of the West Suffolk Joint Development Management Policies Document 2015, chapter 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition requires matters to be agreed prior to commencement to ensure that an appropriate strategy is in place prior to any disturbance to wildlife and the ecological value of the area. | | --- | --- | --- | --- | --- | | 39 | Reserved matters submission | Sustainability and energy use | Any submission of reserved matters in respect of the outline component of this planning permission shall include, as relevant, a Sustainability and Energy Use Statement for approval by

Page 37 · Chunk 426 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 38 | Prior to commencement | Badger survey | Prior to commencement of development in any phase or sub- phase a badger survey for such phase or sub-phase shall be undertaken and details of the survey along with an updated mitigation plan and method statement implementing any such mitigation shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. | To identify and ensure the protection of important species and those protected by legislation, in accordance with policies DM11 and DM12 of the West Suffolk Joint Development Management Policies Document 2015, chapter 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition requires matters to be agreed prior to commencement to ensure that an appropriate strategy is in place prior to any disturbance to wildlife and the ecological value of the area. | | --- | --- | --- | --- | --- | the Local Planning Authority. The Statement shall be based on the Energy Statement December 2019 and Energy Statement Addendum 2 June 2021. The statement shall outline how the development within the area in relation to that reserved matters application has

Page 37 · Chunk 427 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 38 | Prior to commencement | Badger survey | Prior to commencement of development in any phase or sub- phase a badger survey for such phase or sub-phase shall be undertaken and details of the survey along with an updated mitigation plan and method statement implementing any such mitigation shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. | To identify and ensure the protection of important species and those protected by legislation, in accordance with policies DM11 and DM12 of the West Suffolk Joint Development Management Policies Document 2015, chapter 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition requires matters to be agreed prior to commencement to ensure that an appropriate strategy is in place prior to any disturbance to wildlife and the ecological value of the area. | | --- | --- | --- | --- | --- | adhered to broad principles of sustainable design and construction and how energy efficiency will be optimised through the use of design, layout, orientation, materials, insulation and construction techniques. The development shall be carried out in

Page 37 · Chunk 428 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 38 | Prior to commencement | Badger survey | Prior to commencement of development in any phase or sub- phase a badger survey for such phase or sub-phase shall be undertaken and details of the survey along with an updated mitigation plan and method statement implementing any such mitigation shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. | To identify and ensure the protection of important species and those protected by legislation, in accordance with policies DM11 and DM12 of the West Suffolk Joint Development Management Policies Document 2015, chapter 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition requires matters to be agreed prior to commencement to ensure that an appropriate strategy is in place prior to any disturbance to wildlife and the ecological value of the area. | | --- | --- | --- | --- | --- | accordance with the approved Statement. | To ensure that the proposal meets with the requirements of sustainability, in accordance with policy DM7 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 14 of the National Planning

Page 37 · Chunk 429 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 38 | Prior to commencement | Badger survey | Prior to commencement of development in any phase or sub- phase a badger survey for such phase or sub-phase shall be undertaken and details of the survey along with an updated mitigation plan and method statement implementing any such mitigation shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. | To identify and ensure the protection of important species and those protected by legislation, in accordance with policies DM11 and DM12 of the West Suffolk Joint Development Management Policies Document 2015, chapter 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition requires matters to be agreed prior to commencement to ensure that an appropriate strategy is in place prior to any disturbance to wildlife and the ecological value of the area. | | --- | --- | --- | --- | --- | Policy Framework and all relevant Core Strategy Policies. |

Page 37 · Chunk 430 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 37 Appeal Decision APP/F3545/W/22/3297751

Page 38 · Chunk 431 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 38 · Chunk 432 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 40 | Prior to above ground works | Sustainability and energy use | Prior to any above ground works within the detailed phase a Sustainability and Energy Statement for such phase shall be submitted to and approved in writing by the Local Planning Authority. The Statement shall be based on the Energy Statement December 2019 and Energy Statement Addendum 2 June 2021. The statement shall outline how the detailed phase has adhered to broad principles of sustainable design and construction and how energy efficiency will be optimised through the use of design, materials, insulation and construction techniques. The development shall be carried out in accordance with the approved Statement. | To ensure that the proposal meets with the requirements of sustainability, in accordance with policy DM7 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 14 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 41 | Prior to first occupation | Northern Countryside Park | Prior to first occupation of development within the detailed phase the Northern Countryside Park shown on the Drawing No. 1546/018 Rev F shall be provided and open for public

Page 38 · Chunk 433 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 40 | Prior to above ground works | Sustainability and energy use | Prior to any above ground works within the detailed phase a Sustainability and Energy Statement for such phase shall be submitted to and approved in writing by the Local Planning Authority. The Statement shall be based on the Energy Statement December 2019 and Energy Statement Addendum 2 June 2021. The statement shall outline how the detailed phase has adhered to broad principles of sustainable design and construction and how energy efficiency will be optimised through the use of design, materials, insulation and construction techniques. The development shall be carried out in accordance with the approved Statement. | To ensure that the proposal meets with the requirements of sustainability, in accordance with policy DM7 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 14 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | use and all associated hard and soft landscaping works in respect of such park, including the provision of the trim trail, detailed in the approved landscaping scheme shall be completed. Thereafter the Northern Countryside Park shall be

Page 38 · Chunk 434 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 40 | Prior to above ground works | Sustainability and energy use | Prior to any above ground works within the detailed phase a Sustainability and Energy Statement for such phase shall be submitted to and approved in writing by the Local Planning Authority. The Statement shall be based on the Energy Statement December 2019 and Energy Statement Addendum 2 June 2021. The statement shall outline how the detailed phase has adhered to broad principles of sustainable design and construction and how energy efficiency will be optimised through the use of design, materials, insulation and construction techniques. The development shall be carried out in accordance with the approved Statement. | To ensure that the proposal meets with the requirements of sustainability, in accordance with policy DM7 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 14 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | retained and used for no other purpose than as a publicly accessible countryside park with associated recreational facilities. No play equipment or other hard landscaping shall be removed from the area(s) or be replaced with

Page 38 · Chunk 435 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 40 | Prior to above ground works | Sustainability and energy use | Prior to any above ground works within the detailed phase a Sustainability and Energy Statement for such phase shall be submitted to and approved in writing by the Local Planning Authority. The Statement shall be based on the Energy Statement December 2019 and Energy Statement Addendum 2 June 2021. The statement shall outline how the detailed phase has adhered to broad principles of sustainable design and construction and how energy efficiency will be optimised through the use of design, materials, insulation and construction techniques. The development shall be carried out in accordance with the approved Statement. | To ensure that the proposal meets with the requirements of sustainability, in accordance with policy DM7 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 14 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | equipment/hard landscaping not forming part of the approved landscaping scheme unless the prior written consent of the Local Planning Authority has been obtained for any variation to the approved scheme. | To ensure that sufficient play

Page 38 · Chunk 436 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 40 | Prior to above ground works | Sustainability and energy use | Prior to any above ground works within the detailed phase a Sustainability and Energy Statement for such phase shall be submitted to and approved in writing by the Local Planning Authority. The Statement shall be based on the Energy Statement December 2019 and Energy Statement Addendum 2 June 2021. The statement shall outline how the detailed phase has adhered to broad principles of sustainable design and construction and how energy efficiency will be optimised through the use of design, materials, insulation and construction techniques. The development shall be carried out in accordance with the approved Statement. | To ensure that the proposal meets with the requirements of sustainability, in accordance with policy DM7 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 14 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | area space is provided on the development site for the future occupiers of the dwellings, in accordance with policy DM42 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 8 and 12 of the National Planning

Page 38 · Chunk 437 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 40 | Prior to above ground works | Sustainability and energy use | Prior to any above ground works within the detailed phase a Sustainability and Energy Statement for such phase shall be submitted to and approved in writing by the Local Planning Authority. The Statement shall be based on the Energy Statement December 2019 and Energy Statement Addendum 2 June 2021. The statement shall outline how the detailed phase has adhered to broad principles of sustainable design and construction and how energy efficiency will be optimised through the use of design, materials, insulation and construction techniques. The development shall be carried out in accordance with the approved Statement. | To ensure that the proposal meets with the requirements of sustainability, in accordance with policy DM7 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 14 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | Policy Framework and all relevant Core Strategy Policies. |

Page 38 · Chunk 438 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 40 | Prior to above ground works | Sustainability and energy use | Prior to any above ground works within the detailed phase a Sustainability and Energy Statement for such phase shall be submitted to and approved in writing by the Local Planning Authority. The Statement shall be based on the Energy Statement December 2019 and Energy Statement Addendum 2 June 2021. The statement shall outline how the detailed phase has adhered to broad principles of sustainable design and construction and how energy efficiency will be optimised through the use of design, materials, insulation and construction techniques. The development shall be carried out in accordance with the approved Statement. | To ensure that the proposal meets with the requirements of sustainability, in accordance with policy DM7 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 14 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 42 | Reserved matters submission | Play area provision | Any reserved matters application for a phase of development which includes a play area or play areas, shall be accompanied by details of the layout of the area(s) and the play

Page 38 · Chunk 439 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 40 | Prior to above ground works | Sustainability and energy use | Prior to any above ground works within the detailed phase a Sustainability and Energy Statement for such phase shall be submitted to and approved in writing by the Local Planning Authority. The Statement shall be based on the Energy Statement December 2019 and Energy Statement Addendum 2 June 2021. The statement shall outline how the detailed phase has adhered to broad principles of sustainable design and construction and how energy efficiency will be optimised through the use of design, materials, insulation and construction techniques. The development shall be carried out in accordance with the approved Statement. | To ensure that the proposal meets with the requirements of sustainability, in accordance with policy DM7 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 14 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | equipment to be installed for approval by the | To ensure that sufficient play area space is provided on the development site for the future occupiers of the |

Page 38 · Chunk 440 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 38 Appeal Decision APP/F3545/W/22/3297751

Page 39 · Chunk 441 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 39 · Chunk 442 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | local planning authority. The details shall include a timetable for the completion of the play area and its opening for public use and the development shall be carried out in accordance with the approved details and timetable. Once completed, the play area(s) shall be retained and used for no other purpose. No play equipment or other hard landscaping shall be removed from the area(s) or be replaced with equipment/hard landscaping not forming part of the approved scheme unless the prior written consent of the Local Planning Authority has been obtained for any variation to the approved scheme. | dwellings, in accordance with policy DM42 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 8 and 12 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 43 | Prior to occupation of 215th dwelling | Play area provision | Prior to the occupation of the 215th dwelling the play area(s) within the area labelled as ‘The Green’ as shown on the Drawing No. 1546/010 Rev M shall be provided and open for public use and all associated hard and soft landscaping works in respect of the play areas, including the provision of play

Page 39 · Chunk 443 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | local planning authority. The details shall include a timetable for the completion of the play area and its opening for public use and the development shall be carried out in accordance with the approved details and timetable. Once completed, the play area(s) shall be retained and used for no other purpose. No play equipment or other hard landscaping shall be removed from the area(s) or be replaced with equipment/hard landscaping not forming part of the approved scheme unless the prior written consent of the Local Planning Authority has been obtained for any variation to the approved scheme. | dwellings, in accordance with policy DM42 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 8 and 12 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | equipment, detailed in the approved landscaping scheme shall be completed. Thereafter the play area(s) shall be retained and used for no other purpose. No play equipment or other hard landscaping shall be removed from the area(s) or be replaced with equipment/hard landscaping not forming part of the approved landscaping scheme unless the prior written consent of the Local

Page 39 · Chunk 444 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | local planning authority. The details shall include a timetable for the completion of the play area and its opening for public use and the development shall be carried out in accordance with the approved details and timetable. Once completed, the play area(s) shall be retained and used for no other purpose. No play equipment or other hard landscaping shall be removed from the area(s) or be replaced with equipment/hard landscaping not forming part of the approved scheme unless the prior written consent of the Local Planning Authority has been obtained for any variation to the approved scheme. | dwellings, in accordance with policy DM42 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 8 and 12 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | Planning Authority has been obtained for any variation to the approved scheme. | To ensure that sufficient play area space is provided on the development site for the future occupiers of the dwellings, in accordance with policy DM42 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 8 and 12 of the National Planning Policy Framework and all

Page 39 · Chunk 445 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | local planning authority. The details shall include a timetable for the completion of the play area and its opening for public use and the development shall be carried out in accordance with the approved details and timetable. Once completed, the play area(s) shall be retained and used for no other purpose. No play equipment or other hard landscaping shall be removed from the area(s) or be replaced with equipment/hard landscaping not forming part of the approved scheme unless the prior written consent of the Local Planning Authority has been obtained for any variation to the approved scheme. | dwellings, in accordance with policy DM42 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 8 and 12 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | relevant Core Strategy Policies. |

Page 39 · Chunk 446 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | local planning authority. The details shall include a timetable for the completion of the play area and its opening for public use and the development shall be carried out in accordance with the approved details and timetable. Once completed, the play area(s) shall be retained and used for no other purpose. No play equipment or other hard landscaping shall be removed from the area(s) or be replaced with equipment/hard landscaping not forming part of the approved scheme unless the prior written consent of the Local Planning Authority has been obtained for any variation to the approved scheme. | dwellings, in accordance with policy DM42 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 8 and 12 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 44 | Prior to above ground work | Allotments | Prior to any above ground works taking place in connection with the Northern Countryside Park shown on the Drawing No. 1546/018 Rev F details of the layout of the allotments, including access and car parking, shall be submitted to and approved in writing by the local planning authority. The details shall include measures to

Page 39 · Chunk 447 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | local planning authority. The details shall include a timetable for the completion of the play area and its opening for public use and the development shall be carried out in accordance with the approved details and timetable. Once completed, the play area(s) shall be retained and used for no other purpose. No play equipment or other hard landscaping shall be removed from the area(s) or be replaced with equipment/hard landscaping not forming part of the approved scheme unless the prior written consent of the Local Planning Authority has been obtained for any variation to the approved scheme. | dwellings, in accordance with policy DM42 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 8 and 12 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | prevent vehicular access to the | To sure the timely delivery of the necessary infrastructure to meets the needs of the community in accordance with Core Strategy Policy CS14. |

Page 39 · Chunk 448 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 39 Appeal Decision APP/F3545/W/22/3297751

Page 40 · Chunk 449 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 40 · Chunk 450 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Northern Countryside Park (other than for the purposes of maintenance) and the provision of an electric charging point for such maintenance vehicles. The allotments shall be provided in accordance with the approved details prior to the occupation of the 215th dwelling and retained for that use thereafter. | | | --- | --- | --- | --- | --- | | 45 | Prior to above ground works | Pond restoration and management | Prior to any above ground works taking place in connection with the Northern Countryside Park shown on the Drawing No. 1546/018 Rev F details of the restoration of the pond shown on Drawing No. 1546/018 Rev F, including a timetable for the restoration works, shall be submitted to and approved in writing by the local planning authority. The details shall include the future management of the pond and the surrounding area. The pond restoration and management plan shall be implemented in accordance with the approved details and timetable. | To secure biodiversity enhancements commensurate with the scale of the development, in accordance with policies DM11 and DM12 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 15 of the National Planning Policy Framework and all relevant

Page 40 · Chunk 451 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Northern Countryside Park (other than for the purposes of maintenance) and the provision of an electric charging point for such maintenance vehicles. The allotments shall be provided in accordance with the approved details prior to the occupation of the 215th dwelling and retained for that use thereafter. | | | --- | --- | --- | --- | --- | Core Strategy Policies. |

Page 40 · Chunk 452 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Northern Countryside Park (other than for the purposes of maintenance) and the provision of an electric charging point for such maintenance vehicles. The allotments shall be provided in accordance with the approved details prior to the occupation of the 215th dwelling and retained for that use thereafter. | | | --- | --- | --- | --- | --- | Core Strategy Policies. |

Page 40 · Chunk 453 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | Northern Countryside Park (other than for the purposes of maintenance) and the provision of an electric charging point for such maintenance vehicles. The allotments shall be provided in accordance with the approved details prior to the occupation of the 215th dwelling and retained for that use thereafter. | | | --- | --- | --- | --- | --- | | 46 | Prior to commencement | Veteran tree management plan | Prior to commencement of development within the detailed phase a Veteran Tree Management Plan - shall be submitted to and approved in writing by the local planning authority. The Veteran Tree Management Plan shall be implemented in accordance with the approved details. | To ensure that the trees on site are adequately protected, to safeguard the character and visual amenity of the area, in accordance with policies DM12 and DM13 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition requires matters to be agreed prior to commencement of |

Page 40 · Chunk 454 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 40 Appeal Decision APP/F3545/W/22/3297751

Page 41 · Chunk 455 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 | | | | | development to ensure that existing trees are adequately protected prior to any ground disturbance. | | --- | --- | --- | --- | --- | | 47 | Compliance condition | Farmland bird mitigation | The Farmland Bird Mitigation Strategy (HDA ref: 2090.43 April 2021) shall be implemented in the first nesting season following commencement of the development and in accordance with the approved details, or any amendment as may be approved in writing pursuant to this condition, and all mitigation features shall be delivered for a minimum period of 10 years. | To ensure the protection of priority species, in accordance with policies DM11 and DM12 of the West Suffolk Joint Development Management Policies Document 2015 and to allow the LPA to discharge its duties under the NERC Act 2006 (Priority habitats & species) |

Page 41 · Chunk 456 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | development to ensure that existing trees are adequately protected prior to any ground disturbance. | | --- | --- | --- | --- | --- | | 48 | Reserved matters submission | Biodiversity net gain | Any submission of reserved matters in respect of the outline component of this planning permission shall be accompanied by a Biodiversity Net Gain (BNG) design stage report which shall demonstrate a minimum 10% BNG for that phase of the development unless agreed otherwise with the Local Planning Authority. The report shall be in line with Table 2 of CIEEM Biodiversity Net Gain report and audit templates (July 2021 or any updated edition) and use the current version of the Defra Biodiversity Metric 3 (or any successor). The content of the Biodiversity Net Gain report should include the following: a) Baseline data collection and assessment of current conditions on site including a Habitat Baseline Plan b) A commitment to measures in line with the Mitigation Hierarchy and evidence of how BNG Principles have been applied to maximise benefits to biodiversity | To demonstrate measurable biodiversity net gain. |

Page 41 · Chunk 457 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 41 Appeal Decision APP/F3545/W/22/3297751

Page 42 · Chunk 458 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 42 · Chunk 459 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | c) Provision of the full BNG calculations, with detailed justifications for the choice of habitat types, distinctiveness and condition, connectivity and ecological functionality d) Design details which must be supported by a Proposed Habitats Plan e) Details of the implementation measures and management of proposals, and f) Details of the monitoring and auditing measures. Off-site enhancement will only be acceptable where on-site provision is not possible, or it would make a better contribution to improving biodiversity than wholly on-site provision. The proposed enhancement measures shall be implemented in accordance with the approved details and shall be retained in that manner thereafter. | | | --- | --- | --- | --- | --- | | 49 | No later that 6 months after any non- residential building is brought into use | BREEAM | No later than six months after any non-residential building is first brought into use, a certificate demonstrating that the approved building has gained at least a BREAAM Very Good status shall be submitted to the Local Planning Authority. | To ensure that the proposal meets with the requirements of sustainability, in accordance with policy DM7 of the West Suffolk Joint Development

Page 42 · Chunk 460 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | c) Provision of the full BNG calculations, with detailed justifications for the choice of habitat types, distinctiveness and condition, connectivity and ecological functionality d) Design details which must be supported by a Proposed Habitats Plan e) Details of the implementation measures and management of proposals, and f) Details of the monitoring and auditing measures. Off-site enhancement will only be acceptable where on-site provision is not possible, or it would make a better contribution to improving biodiversity than wholly on-site provision. The proposed enhancement measures shall be implemented in accordance with the approved details and shall be retained in that manner thereafter. | | | --- | --- | --- | --- | --- | Management Policies Document 2015, Chapter 14 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 42 · Chunk 461 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | c) Provision of the full BNG calculations, with detailed justifications for the choice of habitat types, distinctiveness and condition, connectivity and ecological functionality d) Design details which must be supported by a Proposed Habitats Plan e) Details of the implementation measures and management of proposals, and f) Details of the monitoring and auditing measures. Off-site enhancement will only be acceptable where on-site provision is not possible, or it would make a better contribution to improving biodiversity than wholly on-site provision. The proposed enhancement measures shall be implemented in accordance with the approved details and shall be retained in that manner thereafter. | | | --- | --- | --- | --- | --- | | 50 | Reserved matters submission | Affordable housing | Any submission of reserved matters in respect of the outline component of this planning permission shall include a scheme for the provision of affordable housing for the areas of the site included in that particular reserved matters submission for the approval of the local planning authority. The scheme shall include | To ensure an appropriate mix and tenure of affordable housing is delivered on the site in accordance with

Page 42 · Chunk 462 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | c) Provision of the full BNG calculations, with detailed justifications for the choice of habitat types, distinctiveness and condition, connectivity and ecological functionality d) Design details which must be supported by a Proposed Habitats Plan e) Details of the implementation measures and management of proposals, and f) Details of the monitoring and auditing measures. Off-site enhancement will only be acceptable where on-site provision is not possible, or it would make a better contribution to improving biodiversity than wholly on-site provision. The proposed enhancement measures shall be implemented in accordance with the approved details and shall be retained in that manner thereafter. | | | --- | --- | --- | --- | --- | Chapter 5 of the National Planning Policy Framework |

Page 42 · Chunk 463 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 42 Appeal Decision APP/F3545/W/22/3297751

Page 43 · Chunk 464 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 | | | | full details of the type, tenure and location on the site of the affordable housing. The approved development shall be carried out and thereafter occupied in complete accordance with the approved scheme. | and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 51 | Reserved matters relating to local centre | Local centre | The reserved matters submitted relating to the areas of land indicated as a Local Centre within the parameter plans, shall (to the extent relevant to the reserved matters application in question) include full details of the distribution, Use Class and size of all units proposed within the Local Centre. The local centre shall be completed in accordance with the approved size, mix and distribution of units. | To ensure a strong local centre with a range of types of non-residential premises providing an appropriate range of facilities and services to meet the day to day needs of the locality in a coherent and attractive built form integrated with surrounding uses. |

Page 43 · Chunk 465 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | full details of the type, tenure and location on the site of the affordable housing. The approved development shall be carried out and thereafter occupied in complete accordance with the approved scheme. | and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 52 | Prior to commencement of Development | Community liaison strategy | Prior to commencement of development a Community Liaison Strategy shall be submitted to and approved in writing by the Local Planning Authority. The Strategy shall include a scheme and timetable for the formation and operation of a Community Liaison Group (with details of the target members (including residents of the site) and management of the Group). | In the interests of delivering a sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. This condition is pre- commencement to ensure the timely establishment of the Community Liaison Group. |

Page 43 · Chunk 466 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | full details of the type, tenure and location on the site of the affordable housing. The approved development shall be carried out and thereafter occupied in complete accordance with the approved scheme. | and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 53 | Prior to first occupation | Residents welcome pack | Prior to first occupation details of information to be provided to new | In the interests of delivering a | https://www.gov.uk/planning-inspectorate 43 Appeal Decision APP/F3545/W/22/3297751

Page 44 · Chunk 467 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 44 · Chunk 468 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | | 54 |

Page 44 · Chunk 469 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Prior

Page 44 · Chunk 470 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | to

Page 44 · Chunk 471 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | first

Page 44 · Chunk 472 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | occupat

Page 44 · Chunk 473 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ion

Page 44 · Chunk 474 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | |

Page 44 · Chunk 475 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Electri

Page 44 · Chunk 476 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | c

Page 44 · Chunk 477 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | vehicle

Page 44 · Chunk 478 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | chargin

Page 44 · Chunk 479 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | g

Page 44 · Chunk 480 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | points

Page 44 · Chunk 481 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | -

Page 44 · Chunk 482 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | dwellin

Page 44 · Chunk 483 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | gs

Page 44 · Chunk 484 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | |

Page 44 · Chunk 485 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Prior

Page 44 · Chunk 486 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | to

Page 44 · Chunk 487 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | first

Page 44 · Chunk 488 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | occupat

Page 44 · Chunk 489 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ion

Page 44 · Chunk 490 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | of any

Page 44 · Chunk 491 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | individ

Page 44 · Chunk 492 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ual

Page 44 · Chunk 493 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | dwellin

Page 44 · Chunk 494 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ghouse

Page 44 · Chunk 495 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | which

Page 44 · Chunk 496 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | is not

Page 44 · Chunk 497 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | an

Page 44 · Chunk 498 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | apartme

Page 44 · Chunk 499 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | nt

Page 44 · Chunk 500 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | within

Page 44 · Chunk 501 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | the

Page 44 · Chunk 502 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | detaile

Page 44 · Chunk 503 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | d

Page 44 · Chunk 504 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | phase

Page 44 · Chunk 505 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | or any

Page 44 · Chunk 506 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | outline

Page 44 · Chunk 507 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | phase,

Page 44 · Chunk 508 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | an

Page 44 · Chunk 509 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | operati

Page 44 · Chunk 510 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | onal

Page 44 · Chunk 511 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | electri

Page 44 · Chunk 512 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | c

Page 44 · Chunk 513 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | vehicle

Page 44 · Chunk 514 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | charge

Page 44 · Chunk 515 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | point

Page 44 · Chunk 516 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | at a

Page 44 · Chunk 517 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | reasona

Page 44 · Chunk 518 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | bly

Page 44 · Chunk 519 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | and

Page 44 · Chunk 520 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | practic

Page 44 · Chunk 521 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ably

Page 44 · Chunk 522 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | accessi

Page 44 · Chunk 523 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ble

Page 44 · Chunk 524 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | locatio

Page 44 · Chunk 525 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | n,

Page 44 · Chunk 526 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | with

Page 44 · Chunk 527 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | an

Page 44 · Chunk 528 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | electri

Page 44 · Chunk 529 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | c

Page 44 · Chunk 530 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | supply

Page 44 · Chunk 531 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | to the

Page 44 · Chunk 532 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | charge

Page 44 · Chunk 533 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | point

Page 44 · Chunk 534 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | capable

Page 44 · Chunk 535 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | of

Page 44 · Chunk 536 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | providi

Page 44 · Chunk 537 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ng

Page 44 · Chunk 538 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | a

Page 44 · Chunk 539 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | 7.4kW

Page 44 · Chunk 540 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | charge,

Page 44 · Chunk 541 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | shall

Page 44 · Chunk 542 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | be

Page 44 · Chunk 543 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | install

Page 44 · Chunk 544 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ed

Page 44 · Chunk 545 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | at

Page 44 · Chunk 546 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | such

Page 44 · Chunk 547 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | dwellin

Page 44 · Chunk 548 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ghouse.

Page 44 · Chunk 549 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | | To

Page 44 · Chunk 550 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | promote

Page 44 · Chunk 551 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | and

Page 44 · Chunk 552 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | facilit

Page 44 · Chunk 553 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ate

Page 44 · Chunk 554 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | the

Page 44 · Chunk 555 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | uptake

Page 44 · Chunk 556 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | of

Page 44 · Chunk 557 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | electri

Page 44 · Chunk 558 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | c

Page 44 · Chunk 559 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | vehicle

Page 44 · Chunk 560 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | s

Page 44 · Chunk 561 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | on the

Page 44 · Chunk 562 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | site

Page 44 · Chunk 563 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | in

Page 44 · Chunk 564 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | order

Page 44 · Chunk 565 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | to

Page 44 · Chunk 566 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | minimis

Page 44 · Chunk 567 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | e

Page 44 · Chunk 568 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | emissio

Page 44 · Chunk 569 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ns

Page 44 · Chunk 570 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | and

Page 44 · Chunk 571 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ensure

Page 44 · Chunk 572 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | no

Page 44 · Chunk 573 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | deterio

Page 44 · Chunk 574 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ration

Page 44 · Chunk 575 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | to the

Page 44 · Chunk 576 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | local

Page 44 · Chunk 577 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | air

Page 44 · Chunk 578 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | quality

Page 44 · Chunk 579 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ,

Page 44 · Chunk 580 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | in

Page 44 · Chunk 581 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | accorda

Page 44 · Chunk 582 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | nce

Page 44 · Chunk 583 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | with

Page 44 · Chunk 584 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Policy

Page 44 · Chunk 585 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | DM14

Page 44 · Chunk 586 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | of the

Page 44 · Chunk 587 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Joint

Page 44 · Chunk 588 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Develop

Page 44 · Chunk 589 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ment

Page 44 · Chunk 590 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Managem

Page 44 · Chunk 591 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ent

Page 44 · Chunk 592 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Policie

Page 44 · Chunk 593 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | s

Page 44 · Chunk 594 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Documen

Page 44 · Chunk 595 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | t,

Page 44 · Chunk 596 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | paragra

Page 44 · Chunk 597 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | phs

Page 44 · Chunk 598 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | 105

Page 44 · Chunk 599 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | and

Page 44 · Chunk 600 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | 110 of

Page 44 · Chunk 601 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | the

Page 44 · Chunk 602 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Nationa

Page 44 · Chunk 603 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | l

Page 44 · Chunk 604 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Plannin

Page 44 · Chunk 605 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | g

Page 44 · Chunk 606 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Policy

Page 44 · Chunk 607 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Framewo

Page 44 · Chunk 608 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | rk

Page 44 · Chunk 609 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | and

Page 44 · Chunk 610 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | the

Page 44 · Chunk 611 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Suffolk

Page 44 · Chunk 612 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Parking

Page 44 · Chunk 613 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | Standar

Page 44 · Chunk 614 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | ds.

Page 44 · Chunk 615 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | residents of the scheme in the form of a ‘Residents Pack’ shall be submitted to and approved in writing by the local planning authority. The details shall include the relevant information to be presented to new residents including, but not be limited to, the following matters: a. The relationship of the site with the town of Bury St Edmunds and surrounding area b. facilities and services available on the development as well as links to nearby services and facilities such as schools, medical centres, leisure, cultural and recreation facilities, and employment areas c. details of the management body responsible for the open spaces and community facilities d. the phasing of the development and the obligations secured by the s106 agreement e. details of the agreed Construction Method Statement The development shall be carried out in accordance with the approved details | sustainable development and community and to ensure that the new residents are appropriately informed of the phasing and masterplan principles of the development, in accordance with Policies CS2, CS11 and CS14 of the St Edmundsbury Core Strategy 2010 and Chapter 8 of the National Planning Policy Framework. | | --- | --- | --- | --- | --- | |

Page 44 · Chunk 616 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 44 Appeal Decision APP/F3545/W/22/3297751

Page 45 · Chunk 617 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 45 · Chunk 618 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 55 | Prior to first occupation | Electric vehicle charging points - apartments | Prior to first occupation of any apartment within the detailed phase or any outline phase, all unallocated spaces in private communal parking areas for such apartments shall be provided with an operational electric vehicle charge point capable of providing a 7.4kW charge at reasonably and practicably accessible locations. The Electric Vehicle Charge Points shall be retained thereafter and maintained in an operational condition. | To promote and facilitate the uptake of electric vehicles on the site in order to minimise emissions and ensure no deterioration to the local air quality, in accordance with Policy DM14 of the Joint Development Management Policies Document, paragraphs 105 and 110 of the National Planning Policy Framework and the Suffolk Parking Standards. | | --- | --- | --- | --- | --- | | 56 | Prior to first occupation | Electric vehicle charging points – non- residential | Prior to first occupation of any non- residential use within any outline phase forming part of the development which benefits from off- street car parking spaces, details of the specification and number of electric vehicle charge points in respect of such

Page 45 · Chunk 619 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 55 | Prior to first occupation | Electric vehicle charging points - apartments | Prior to first occupation of any apartment within the detailed phase or any outline phase, all unallocated spaces in private communal parking areas for such apartments shall be provided with an operational electric vehicle charge point capable of providing a 7.4kW charge at reasonably and practicably accessible locations. The Electric Vehicle Charge Points shall be retained thereafter and maintained in an operational condition. | To promote and facilitate the uptake of electric vehicles on the site in order to minimise emissions and ensure no deterioration to the local air quality, in accordance with Policy DM14 of the Joint Development Management Policies Document, paragraphs 105 and 110 of the National Planning Policy Framework and the Suffolk Parking Standards. | | --- | --- | --- | --- | --- | spaces shall be submitted to and approved in writing by the local planning authority. The Electric Vehicle Charge Points shall be installed prior to occupation of the relevant non-residential use and retained thereafter and maintained in an operational condition. | To promote and facilitate the uptake of electric vehicles on the site in order to

Page 45 · Chunk 620 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 55 | Prior to first occupation | Electric vehicle charging points - apartments | Prior to first occupation of any apartment within the detailed phase or any outline phase, all unallocated spaces in private communal parking areas for such apartments shall be provided with an operational electric vehicle charge point capable of providing a 7.4kW charge at reasonably and practicably accessible locations. The Electric Vehicle Charge Points shall be retained thereafter and maintained in an operational condition. | To promote and facilitate the uptake of electric vehicles on the site in order to minimise emissions and ensure no deterioration to the local air quality, in accordance with Policy DM14 of the Joint Development Management Policies Document, paragraphs 105 and 110 of the National Planning Policy Framework and the Suffolk Parking Standards. | | --- | --- | --- | --- | --- | minimise emissions and ensure no deterioration to the local air quality, in accordance with Policy DM14 of the Joint Development Management Policies Document, paragraphs 105 and 110 of the National Planning Policy Framework and the Suffolk Parking Standards. |

Page 45 · Chunk 621 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 55 | Prior to first occupation | Electric vehicle charging points - apartments | Prior to first occupation of any apartment within the detailed phase or any outline phase, all unallocated spaces in private communal parking areas for such apartments shall be provided with an operational electric vehicle charge point capable of providing a 7.4kW charge at reasonably and practicably accessible locations. The Electric Vehicle Charge Points shall be retained thereafter and maintained in an operational condition. | To promote and facilitate the uptake of electric vehicles on the site in order to minimise emissions and ensure no deterioration to the local air quality, in accordance with Policy DM14 of the Joint Development Management Policies Document, paragraphs 105 and 110 of the National Planning Policy Framework and the Suffolk Parking Standards. | | --- | --- | --- | --- | --- | | 57 | Prior to commencement | Construction Method Statement | Prior to commencement of development including any works of demolition, a Construction Method Statement shall be submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall

Page 45 · Chunk 622 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 55 | Prior to first occupation | Electric vehicle charging points - apartments | Prior to first occupation of any apartment within the detailed phase or any outline phase, all unallocated spaces in private communal parking areas for such apartments shall be provided with an operational electric vehicle charge point capable of providing a 7.4kW charge at reasonably and practicably accessible locations. The Electric Vehicle Charge Points shall be retained thereafter and maintained in an operational condition. | To promote and facilitate the uptake of electric vehicles on the site in order to minimise emissions and ensure no deterioration to the local air quality, in accordance with Policy DM14 of the Joint Development Management Policies Document, paragraphs 105 and 110 of the National Planning Policy Framework and the Suffolk Parking Standards. | | --- | --- | --- | --- | --- | provide for: a) The parking of vehicles of site operatives and visitors | To ensure the satisfactory development of the site and to protect the amenity of occupiers of adjacent properties from noise and disturbance, in accordance with policies DM2 and |

Page 45 · Chunk 623 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 45 Appeal Decision APP/F3545/W/22/3297751

Page 46 · Chunk 624 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 46 · Chunk 625 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | b) Loading and unloading of plant and materials c) Site set-up including arrangements for the storage of plant and materials used in constructing the development and the provision of temporary offices, plant and machinery d) The erection and maintenance of security hoarding including external safety and information signage, interpretation boards, decorative displays, and facilities for public viewing, where appropriate e) Wheel washing facilities f) Measures to control the emission of dust and dirt during construction g) A scheme for recycling/disposing of waste resulting from demolition and construction works h) Hours of construction operations including times and routes for deliveries and the removal of excavated materials and waste i) Noise method statements and noise levels for each construction activity including piling and excavation operations j) Access and protection measures around the construction site for pedestrians, cyclists and other road users including arrangements for diversions during the construction period and for the provision of associated directional signage relating thereto. k) The site operator shall maintain a register of complaints and record of actions taken to deal with such

Page 46 · Chunk 626 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan complaints at the site office as specified in the Plan throughout the period of occupation of the site. | DM14 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. This condition requires matters to be agreed prior to commencement to ensure that appropriate arrangements are put into place before any works take place on site that are likely to impact the area and nearby occupiers. | | --- | --- | --- | --- | --- | | 58 | Prior to occupation of 150th dwelling | Southern access | Prior to occupation of the 150th dwelling the southern roundabout as shown on Drawing No. 70055213-SK- | To ensure that the access is made available for use at |

Page 46 · Chunk 627 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 46 Appeal Decision APP/F3545/W/22/3297751

Page 47 · Chunk 628 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 | | | | 010 Rev F shall be constructed and be available for use by all forms of traffic. | an appropriate time, in accordance with policy DM2 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 59 | Prior to first occupation | Northern access | Prior to first occupation of any of the dwellings hereby approved the northern roundabout as shown on Drawing No. 70055213-SK-011 Rev H shall be completed and available for use by all forms of traffic. | To ensure that the access is made available for use at an appropriate time, in accordance with policy DM2 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 47 · Chunk 629 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | 010 Rev F shall be constructed and be available for use by all forms of traffic. | an appropriate time, in accordance with policy DM2 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 60 | Prior to occupation of 500th dwelling | Footbridge over Cattishall crossing | No more than 500 dwellings shall be occupied, of which, no more than 30 dwellings shall be occupied in the area identified as ‘phase 2’ on plan ref. 1011 PL Rev C, until a footbridge over the Cattishall rail crossing has been constructed and is available for use. | To encourage the use of sustainable forms of transport and reduce dependence on the private motor vehicle, in accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 47 · Chunk 630 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | 010 Rev F shall be constructed and be available for use by all forms of traffic. | an appropriate time, in accordance with policy DM2 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 61 | Prior to the southern access being brought into use | Orttewell Road traffic signal improvement and toucan | The southern access, as detailed in condition 5 shall not be brought into use until such time as the traffic signal upgrade scheme (MOVA) including the toucan crossing at Orttewell Road and | To ensure that the pedestrian and cycle link is made available for use at an appropriate time, |

Page 47 · Chunk 631 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 47 Appeal Decision APP/F3545/W/22/3297751

Page 48 · Chunk 632 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 48 · Chunk 633 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | crossing | the pedestrian and cycle link to the Orttewell Road crossing on the adopted highway, all as shown on Drawing No. 70055213-SK-034-B, have been completed and brought into use. | in accordance with policies DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 62 | Prior to occupation of 150th dwelling | Byway RB4 upgrade | Prior to first occupation of the detailed element a scheme for the upgrading of the surface of Green Lane (Byway RB4) and the design of the Spine Road crossing of Green Lane shall be submitted to and agreed in writing by the Local Planning Authority. No more than 150 dwellings shall be occupied until such time as the works to upgrade Green Lane (Byway RB4) as agreed, including the crossing of the A143 as shown on Drawing No. 70055213-SK-010 Rev F, have been completed and are available for use. The spine road crossing of Green Lane shall be carried out in accordance with the approved details prior to the occupation of the 288th dwelling. | To encourage the use of sustainable forms of transport and reduce dependence on the

Page 48 · Chunk 634 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | crossing | the pedestrian and cycle link to the Orttewell Road crossing on the adopted highway, all as shown on Drawing No. 70055213-SK-034-B, have been completed and brought into use. | in accordance with policies DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | private motor vehicle, in accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 48 · Chunk 635 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | crossing | the pedestrian and cycle link to the Orttewell Road crossing on the adopted highway, all as shown on Drawing No. 70055213-SK-034-B, have been completed and brought into use. | in accordance with policies DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | private motor vehicle, in accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 48 · Chunk 636 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | crossing | the pedestrian and cycle link to the Orttewell Road crossing on the adopted highway, all as shown on Drawing No. 70055213-SK-034-B, have been completed and brought into use. | in accordance with policies DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 63 | Prior to the occupation of the 287th dwelling | Bridleway BR5 upgrade | No more than 287 dwellings shall be occupied until such time as the works to upgrade Bridleway BR5, including the A143 crossing, as shown on Drawing No. 70055213-SK-040 Rev A and on the adopted highway have been completed and are available for use. A specification for such works shall be submitted to and agreed in writing by the Local Planning Authority prior to being implemented and shall cover the defined minimum width of the bridleway and include a surface treatment suitable for all users. | To encourage the use of sustainable forms of transport and reduce dependence on the private motor vehicle, in accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015,

Page 48 · Chunk 637 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | crossing | the pedestrian and cycle link to the Orttewell Road crossing on the adopted highway, all as shown on Drawing No. 70055213-SK-034-B, have been completed and brought into use. | in accordance with policies DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | Chapter 9 of the | https://www.gov.uk/planning-inspectorate 48 Appeal Decision APP/F3545/W/22/3297751

Page 49 · Chunk 638 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 | | | | | National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 64 | Prior to the occupation of the 287th dwelling | Bridleway BR6 upgrade | No more than 287 dwellings shall be occupied until works to re-surface Bridleway BR6 from the junction with Fornham Rd, for a length of approximately 300 metres, have been completed and are available for use. A specification for such works shall be submitted to and agreed in writing by the Local Planning Authority prior to being implemented and shall cover the defined minimum width of the bridleway and include a surface treatment suitable for all users. | To encourage the use of sustainable forms of transport and reduce dependence on the private motor vehicle, in accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 49 · Chunk 639 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 65 | Reserved matters submission | Bin storage and presentation | Any submission of reserved matters in respect of the outline component of this planning permission shall include details of refuse and recycling storage and presentation/collection facilities, where applicable, within the area in relation to that reserved matters application for approval by the Local Planning Authority. The development shall be carried out in accordance with the approved details and thereafter the facilities shall be retained in accordance with the approved details and continue to be available for use. | To ensure the incorporation of waste storage and recycling arrangements, in accordance with policies DM2 and DM14 of the West Suffolk Joint Development Management Policies Document 2015, Chapters 12 and 15 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 49 · Chunk 640 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 66 | Prior to commencement | Railway underpass reopening | Prior to commencement of the development details of the works to be undertaken to re-open the underpass on the southern boundary of the site shall be submitted to and approved in writing by the local planning authority. The details shall include: a. The route to the underpass from the approved dwellings to | To encourage the use of sustainable forms of transport and reduce dependence on the private motor vehicle, in accordance with policy DM2 and DM45 of the West | https://www.gov.uk/planning-inspectorate 49 Appeal Decision APP/F3545/W/22/3297751

Page 50 · Chunk 641 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 | | | | the north, including the lighting strategy for the route, and b. All structural and non-structural works to be undertaken to the underpass including drainage, surfacing, lighting, and means to secure access to the south. No dwellings shall be occupied until such time as the approved works are completed and the underpass is open for use. | Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 67 | Prior to commencement | Parking (bicycle and motor vehicle) | The areas to be provided for the manoeuvring and parking of vehicles (including secure cycle storage), as shown within the approved drawings for the detailed element of this consent shall be carried out and thereafter retained and used for no other purpose. | To ensure that sufficient space for the on-site parking of vehicles is provided, in accordance with policy DM2 and DM46 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 50 · Chunk 642 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | the north, including the lighting strategy for the route, and b. All structural and non-structural works to be undertaken to the underpass including drainage, surfacing, lighting, and means to secure access to the south. No dwellings shall be occupied until such time as the approved works are completed and the underpass is open for use. | Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 68 | Prior to first occupation and prior to the occupation of the 288th dwelling | Fornham Road / A143 improvement | Prior to first occupation of the development a scheme shall be submitted to the Local Planning Authority for approval in writing for enhanced right hand turn provision for traffic on the A143 turning onto Fornham Road. The approved scheme shall be implemented in full prior to the occupation of the 288th dwelling. | In the interests of road safety, in accordance with policy DM2 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 50 · Chunk 643 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | the north, including the lighting strategy for the route, and b. All structural and non-structural works to be undertaken to the underpass including drainage, surfacing, lighting, and means to secure access to the south. No dwellings shall be occupied until such time as the approved works are completed and the underpass is open for use. | Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 69 | Prior to the occupation of the 287th dwelling | Great Barton link and A143 crossing | No more than 287 dwellings shall be occupied until such time as the walking and cycling link to Great Barton, including the crossing point on the A143, as shown on Drawing No. 70055213-SK-021 Rev F, have been completed in full and made | To encourage the use of sustainable forms of transport and reduce dependence on the private motor vehicle, in |

Page 50 · Chunk 644 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 50 Appeal Decision APP/F3545/W/22/3297751

Page 51 · Chunk 645 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 | | | | available for public use. The link shall thereafter be retained. | accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 70 | Prior to occupation of 500th dwelling | Northgate / Compiegne Way junction improvement | No more than 500 dwellings shall be occupied until such time as the works to the Compiegne Way approach to the Northgate roundabout on the adopted highway, and as shown on Drawing No. 70055213-SK-066 Rev. A, have been completed and are available for use. | In the interests of road safety, in accordance with policy DM2 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 51 · Chunk 646 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | available for public use. The link shall thereafter be retained. | accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 71 | Prior to first occupation and prior to occupation of the 500th dwelling | East Barton Road improvement scheme | Prior to the first occupation of the development a scheme for traffic calming and associated measures at the areas shown indicatively on drawing reference 70055213-SK-067 shall be submitted to and agreed in writing by the Local Planning Authority. The approved scheme shall be implemented in full prior to the occupation of the 500th dwelling. | In the interests of road safety, in accordance with policy DM2 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 51 · Chunk 647 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | available for public use. The link shall thereafter be retained. | accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 72 | Prior to first occupation and prior to the occupation of the 150th dwelling | A134 / A143 roundabout improvement scheme | Prior to first occupation of the development a scheme shall be submitted to the LPA for approval in writing showing two lane segregation by means of hatching on the A143(S) approach to the A143/A134 roundabout. The approved scheme shall be implemented in full prior to the occupation of the 150th dwelling. | In the interests of road safety, in accordance with policy DM2 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 51 · Chunk 648 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 51 Appeal Decision APP/F3545/W/22/3297751

Page 52 · Chunk 649 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 52 · Chunk 650 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 73 | Prior to first occupation | Signing strategy for pedestrians and cyclists | No occupation within the detailed phase shall take place until a signage strategy for pedestrians and cyclists within that phase including a timetable for implementation has been submitted to and approved in writing by the local planning authority. The signage strategy shall be carried out in accordance with the approved details and retained thereafter. | To encourage the use of sustainable forms of transport and reduce dependence on the private motor vehicle, in accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | | 74 | Prior to the first occupation of any non- residential units | Travel Plan – non- residential | Prior to first occupation of any non- residential units (excluding the primary school and early years facility) within a phase of the development, a Non-Residential Travel Plan shall be submitted for the approval in writing by the local planning authority. This Travel Plan must contain the following: a) Details of the travel arrangements to and

Page 52 · Chunk 651 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 73 | Prior to first occupation | Signing strategy for pedestrians and cyclists | No occupation within the detailed phase shall take place until a signage strategy for pedestrians and cyclists within that phase including a timetable for implementation has been submitted to and approved in writing by the local planning authority. The signage strategy shall be carried out in accordance with the approved details and retained thereafter. | To encourage the use of sustainable forms of transport and reduce dependence on the private motor vehicle, in accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | from the site for employees within the relevant phase b) Baseline travel data based upon the information provided in the Transport Assessment, with suitable measures, objectives and targets identified targets to reduce the vehicular trips made by employees across the whole development, with suitable remedial measures identified to be implemented if these objectives and targets are not met. Baseline data should be used to inform the shuttle bus

Page 52 · Chunk 652 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 73 | Prior to first occupation | Signing strategy for pedestrians and cyclists | No occupation within the detailed phase shall take place until a signage strategy for pedestrians and cyclists within that phase including a timetable for implementation has been submitted to and approved in writing by the local planning authority. The signage strategy shall be carried out in accordance with the approved details and retained thereafter. | To encourage the use of sustainable forms of transport and reduce dependence on the private motor vehicle, in accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | service provision amongst other measures c) Appointment of a suitably qualified Non-Residential Travel Plan Coordinator to implement the Non-Residential Travel Plan in full and clearly identify their | To encourage the use of sustainable forms of transport and reduce dependence on the private motor vehicle, in accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National

Page 52 · Chunk 653 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 73 | Prior to first occupation | Signing strategy for pedestrians and cyclists | No occupation within the detailed phase shall take place until a signage strategy for pedestrians and cyclists within that phase including a timetable for implementation has been submitted to and approved in writing by the local planning authority. The signage strategy shall be carried out in accordance with the approved details and retained thereafter. | To encourage the use of sustainable forms of transport and reduce dependence on the private motor vehicle, in accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | Planning Policy Framework and all relevant Core Strategy Policies. |

Page 52 · Chunk 654 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 52 Appeal Decision APP/F3545/W/22/3297751

Page 53 · Chunk 655 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 53 · Chunk 656 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | | 75 | Prior

Page 53 · Chunk 657 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | to first

Page 53 · Chunk 658 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | occupation |

Page 53 · Chunk 659 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | Travel Plan

Page 53 · Chunk 660 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | –

Page 53 · Chunk 661 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | residential

Page 53 · Chunk 662 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | | Prior to

Page 53 · Chunk 663 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | first

Page 53 · Chunk 664 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | occupation

Page 53 · Chunk 665 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | of any

Page 53 · Chunk 666 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | residential

Page 53 · Chunk 667 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | units within

Page 53 · Chunk 668 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | a phase of

Page 53 · Chunk 669 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | the

Page 53 · Chunk 670 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | development,

Page 53 · Chunk 671 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | a

Page 53 · Chunk 672 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | Residential

Page 53 · Chunk 673 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | Travel Plan

Page 53 · Chunk 674 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | shall be

Page 53 · Chunk 675 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | submitted

Page 53 · Chunk 676 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | for the

Page 53 · Chunk 677 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | approval in

Page 53 · Chunk 678 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | writing by

Page 53 · Chunk 679 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | the local

Page 53 · Chunk 680 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | planning

Page 53 · Chunk 681 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | authority

Page 53 · Chunk 682 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | this shall

Page 53 · Chunk 683 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | include the

Page 53 · Chunk 684 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | following:

Page 53 · Chunk 685 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | a) Baseline

Page 53 · Chunk 686 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | travel data

Page 53 · Chunk 687 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | based upon

Page 53 · Chunk 688 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | the

Page 53 · Chunk 689 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | information

Page 53 · Chunk 690 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | provided in

Page 53 · Chunk 691 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | the

Page 53 · Chunk 692 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | Transport

Page 53 · Chunk 693 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | Assessment,

Page 53 · Chunk 694 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | with

Page 53 · Chunk 695 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | suitable

Page 53 · Chunk 696 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | measures,

Page 53 · Chunk 697 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | objectives |

Page 53 · Chunk 698 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | To encourage

Page 53 · Chunk 699 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | the use of

Page 53 · Chunk 700 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | sustainable

Page 53 · Chunk 701 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | forms of

Page 53 · Chunk 702 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | transport

Page 53 · Chunk 703 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | and reduce

Page 53 · Chunk 704 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | dependence

Page 53 · Chunk 705 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | on the

Page 53 · Chunk 706 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | private

Page 53 · Chunk 707 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | motor

Page 53 · Chunk 708 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | vehicle, in

Page 53 · Chunk 709 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | accordance

Page 53 · Chunk 710 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | with policy

Page 53 · Chunk 711 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | DM2 and DM45

Page 53 · Chunk 712 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | of the West

Page 53 · Chunk 713 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | Suffolk

Page 53 · Chunk 714 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | contact details in the Non- Residential Travel Plan d) A commitment to monitor the vehicular trips generated by the employees and submit a revised Non-Residential Travel Plan no later than six months after first occupation of any non- residential unit and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all employees on the site are engaged in the Non-Residential Travel Plan process f) A Non-Residential Travel Plan budget that covers the full implementation of the Non- Residential Travel Plan until five years has passed after occupation of any non- residential unit g) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area Non-residential uses within any phase shall not be occupied until the Non- Residential Travel Plan has been agreed. The approved Non-Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Non-Residential Travel Plan and shall thereafter adhered to in accordance with the approved Non-Residential Travel Plan. | | | --- | --- | --- | --- | --- | Joint |

Page 53 · Chunk 715 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 53 Appeal Decision APP/F3545/W/22/3297751

Page 54 · Chunk 716 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 54 · Chunk 717 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | and targets identified targets to reduce the vehicular trips made by residents across the whole development, with suitable remedial measures identified to be implemented if these objectives and targets are not met. Baseline data should be used to inform the shuttle bus service provision amongst other measures b) Appointment of Travel Plan Coordinator to implement the Travel Plan in full and clearly identify their contact details in the Travel Plan c) A commitment to monitor the vehicular trips generated by the residents using traffic counters and resident questionnaires and submit a revised Travel Plan two years after first occupation d) A further commitment to monitor the Travel Plan annually on each anniversary of the approval of the Full Travel Plan and provide the outcome in a revised Travel Plan to be submitted to and approved in writing by the Local Planning Authority for a minimum of five years, or one year after occupation of the final dwelling (whichever is the longest duration) using the same methodology as the baseline monitoring e) A suitable marketing strategy to ensure that all residents on the site are engaged in the Travel Plan process f) A Travel Plan budget that covers the full

Page 54 · Chunk 718 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan implementation of the Travel Plan g) A copy of a residents’ travel pack that includes a multi- modal voucher to incentivise residents to use sustainable travel in the local area No residential units shall be occupied until the Residential Travel Plan has | Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. | | --- | --- | --- | --- | --- | https://www.gov.uk/planning-inspectorate 54 Appeal Decision APP/F3545/W/22/3297751

Page 55 · Chunk 719 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 55 · Chunk 720 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | been agreed. The approved Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Residential Travel Plan and shall thereafter adhered to in accordance with the approved Residential Travel Plan. | | | --- | --- | --- | --- | --- | | 76 | Prior to first occupation of the school | Travel Plan – school | Prior to first use of the primary school and early years facility, a School Travel Plan shall be submitted for the approval in writing by the local planning authority in consultation with the highway authority. This Travel Plan must contain the following: a) Details of the travel arrangements to and from the site for employees, children and visitors to the school b) Baseline travel data based upon the information provided in the Transport Assessment, with suitable measures, objectives and targets identified targets to reduce the vehicular trips made by employees, children and visitors across the whole development, with suitable remedial measures identified to be implemented if these objectives and targets are not met c) Appointment of a suitably qualified School Travel Plan Coordinator to implement the School Travel Plan in full and clearly identify

Page 55 · Chunk 721 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | been agreed. The approved Residential Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the Residential Travel Plan and shall thereafter adhered to in accordance with the approved Residential Travel Plan. | | | --- | --- | --- | --- | --- | their contact details in the School Travel Plan d) A commitment to monitor the vehicular trips generated by the employees, children and visitors and submit a revised School Travel Plan no later than six months after occupation school e) and annually thereafter for a minimum period of five years using the same methodology as the baseline monitoring f) A suitable marketing strategy to | To encourage the use of sustainable forms of transport and reduce dependence on the private motor vehicle, in accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 55 · Chunk 722 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 55 Appeal Decision APP/F3545/W/22/3297751

Page 56 · Chunk 723 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 | | | | ensure that all employees, visitors and customers on the site are engaged in the School Travel Plan process g) A School Travel Plan budget that covers the full implementation of the Travel Plan until five years has passed after occupation of the school, and h) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area The primary school and early years facility shall not be occupied until the School Travel Plan has been agreed. The approved School Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the School Travel Plan and shall thereafter adhered to in accordance with the approved School Travel Plan. | | | --- | --- | --- | --- | --- | | 77 | Prior to first occupation | Estate road and footway construction condition | No dwelling shall be occupied until the carriageways and footways serving that dwelling have been constructed to at least Binder (base) course level or better. | In the interests of highway safety to ensure that satisfactory access is provided for the safety of residents and the public. |

Page 56 · Chunk 724 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | ensure that all employees, visitors and customers on the site are engaged in the School Travel Plan process g) A School Travel Plan budget that covers the full implementation of the Travel Plan until five years has passed after occupation of the school, and h) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area The primary school and early years facility shall not be occupied until the School Travel Plan has been agreed. The approved School Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the School Travel Plan and shall thereafter adhered to in accordance with the approved School Travel Plan. | | | --- | --- | --- | --- | --- | | 78 | Prior to commencement | Estate road and footway phasing condition | No development shall be commenced in any phase or sub phase until an estate road phasing and completion plan for that phase has been submitted to and approved in writing by the Local Planning Authority. The estate road phasing and completion plan shall set out the development phases and the standards of construction that the estate roads serving each phase of the development will be

Page 56 · Chunk 725 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | ensure that all employees, visitors and customers on the site are engaged in the School Travel Plan process g) A School Travel Plan budget that covers the full implementation of the Travel Plan until five years has passed after occupation of the school, and h) A copy of an employee travel pack that includes information to encourage employees to use sustainable travel in the local area The primary school and early years facility shall not be occupied until the School Travel Plan has been agreed. The approved School Travel Plan measures shall be implemented in accordance with a timetable that shall be included in the School Travel Plan and shall thereafter adhered to in accordance with the approved School Travel Plan. | | | --- | --- | --- | --- | --- | completed to and maintained at. Development shall only take place in accordance with the approved estate road phasing and completion plan. | In the interests of highway safety, to ensure that the estate roads serving the development are completed and thereafter maintained during the construction phase to an acceptable standard. This is a pre- commencement condition because the estate road planning, phasing |

Page 56 · Chunk 726 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 56 Appeal Decision APP/F3545/W/22/3297751

Page 57 · Chunk 727 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 57 · Chunk 728 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | and delivery is essential to be able to safely access and deliver the remainder of the development | | --- | --- | --- | --- | --- | | 79 | Reserved matters submission | Walking and cycling strategy | Any submission of reserved matters in respect of the outline component of this planning permission shall be accompanied by details of the walking and cycling infrastructure to be delivered within the area in relation to that reserved matters application for approval by the local planning authority. Such details shall be substantially in accordance with chapters 4, 5, 6, and 7 of the St Joseph Homes Ltd Walking and Cycling Strategy dated September 2021. The details shall include a timetable for the delivery of the infrastructure and the walking and cycling signage to be installed on all routes. The development shall be carried out in accordance with the approved details and timetable. | To encourage the use of sustainable forms of transport and reduce dependence on the private motor vehicle, in accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 57 · Chunk 729 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | | | | | and delivery is essential to be able to safely access and deliver the remainder of the development | | --- | --- | --- | --- | --- | | 80 | Prior to occupation | Shuttle Bus | Prior to occupation of the development, details of a shuttle bus service shall be submitted to and approved in writing by the local planning authority, such details to include: a) an assessment of the optimal routing and parameters of the service, the proposed route of the shuttle bus service, with the service to run between the development, Bury St Edmunds Railway Station and Bury St Edmunds Bus Station; b) the frequency of the bus service, which shall be a minimum of every thirty minutes each day between the hours of 07:00 and 19:00 (with the exception of Christmas Day and Boxing Day on which no shuttle bus service shall be provided); c) evidence to demonstrate that | To encourage the use of sustainable forms of transport and reduce dependence on the private motor vehicle, in accordance with policy DM2 and DM45 of the West Suffolk Joint Development Management Policies Document 2015, Chapter 9 of the National Planning Policy Framework and all relevant Core Strategy Policies. |

Page 57 · Chunk 730 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 57 Appeal Decision APP/F3545/W/22/3297751

Page 58 · Chunk 731 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 | | | | the capacity and frequency of the shuttle bus service will be sufficient to meet demand for the shuttle bus service; d) the proposed operator of the shuttle bus service, including the proposed terms of operation, and e) full details/specification of the bus(es) to be used on the shuttle bus route The approved shuttle bus service shall be delivered before the first occupation of the 50th dwelling and then the provision shall be reviewed using the same methodology and evidence from the Travel Plan(s) at least every 12 months from commencement of the service for a period of 10 years, with any recommended alterations from the review implemented within the following 12 months. The minimum period for the provision of the service being ten years. | | | --- | --- | --- | --- | --- |

Page 58 · Chunk 732 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 58 Appeal Decision APP/F3545/W/22/3297751 Table 2 - Outline Component –Approved Plans | | | | | --- | --- | --- | | | | | | Drawing Number | REV | Drawing Title | | | | | | 2742-A-1100 | PL-D | Site Location Plan | | 2742-A-1201 | PL-G | Parameter Plan - Land Use | | 2742-A-1202 | PL-E | Parameter Plan - Access & Movement | | 2742-A-1203 | PL-D | Parameter Plan - Building Heights | | 2742-A-1204 | PL-D | Parameter Plan - Density | | 2742-A-1205 | PL-E | Parameter Plan - Green Infrastructure | Table 3 - Detailed Component - Approved Plans

Page 59 · Chunk 733 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Table 3 - Detailed Component - Approved Plans | | | | | --- | --- | --- | | | | | | Drawing Number | REV | Drawing Title | | | | | | 2742-A-1005 | PL-F | Phase 1 Site Layout | | 2742-C-1005 | PL-F | Phase 1 Site Layout - Coloured | | 2742-C-1105 | PL-D | Phase 1 Site Layout - Wider Context | | 2742-A-1700 | PL-E | Phase 1 Refuse Strategy | | 2742-A-1701 | PL-E | Phase 1 Parking Strategy | | 2742-C-1702 | PL-D | Phase 1 Materials & Boundary Treatment Plan | | 2742-C-1703 | PL-D | Phase 1 Tenure Plan | | 70055213-SK-038 | B | Phase 1 Visibility Plan | | 2742-C-1500 | PL-B | Street Scenes (A1-D) | | 2742-C-1501 | PL-B | Street Scenes (E-H) | | 2742-C-1502 | PL-B | Street Scenes (J-M) | | 2742-C-3000 | PL-D | 2BH1 (SEMI) Plans and Elevations | | 2742-C-3001 | PL-C | 2BH1 (TERRACE of 3) Plans and Elevations | | 2742-C-3002 | PL-D | 2BH1 (TERRACE of 4) Plans and Elevations | | 2742-C-3005 | PL-D | 2BH2 (TERRACE of 3) Plans and Elevations | | 2742-C-3006 | PL-E | 2BH2 (TERRACE of 3) Plans and Elevations | | 2742-C-3007 | PL-A | 2BH2 (SEMI-DETACHED) Plans and Elevations | | 2742-C-3010 | PL-F | 3BH1 (SEMI) Plans and Elevations | | 2742-C-3010.1 | PL-D | 3BH1 (SEMI) Plans and Elevations |

Page 59 · Chunk 734 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 59 Appeal Decision APP/F3545/W/22/3297751

Page 60 · Chunk 735 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751

Page 60 · Chunk 736 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 2742-C-3011 | PL-G | 3BH1 (TERRACE of 3) Plans and Elevations | | --- | --- | --- | | 2742-C-3011.1 | PL-F | 3BH1 (TERRACE of 3) Plans and Elevations | | 2742-C-3012 | PL-D | 3BH1 + 3BH2 (SEMI) Plans and Elevations | | 2742-C-3015 | PL-D | 3BH2 Plans and Elevations | | 2742-C-3015.1 | PL-D | 3BH2 Plans and Elevations | | 2742-C-3016 | PL-C | 3BH2 Plans and Elevations | | 2742-C-3017 | PL-E | 3BH2-Alt Plans and Elevations | | 2742-C-3017.1 | PL-D | 3BH2-Alt Plans and Elevations | | 2742-C-3018 | PL-C | 3BH2-Alt Plans and Elevations) | | 2742-C-3020 | PL-C | 3BH3 (SEMI) Plans and Elevations | | 2742-C-3021 | PL-C | 3BH3 (TERRACE of 3) Plans and Elevations | | 2742-C-3028 | PL-B | 3BH4 (TERRACE of 3 + Garages) Plans and Elevations | | 2742-C-3030 | PL-B | 3BH6 (SEMI) Plans and Elevations | | 2742-C-3031 | PL-A | 3BH6 (SEMI + Garage) Plans and Elevations | | 2742-C-3032 | PL-A | 3BH6 (SEMI + Garage) Plans and Elevations | | 2742-C-3050 | PL-E | 4BH1 Plans and Elevations | | 2742-C-3051 | PL-C | 4BH1 Plans and Elevations | | 2742-C-3055 | PL-C | 4BH2 Plans and Elevations | | 2742-C-3056 | PL-C | 4BH2 Plans and Elevations | | 2742-C-3060 | PL-C | 4BH3 Plans and Elevations | | 2742-C-3061 | PL-C | 4BH3 Plans and Elevations |

Page 60 · Chunk 737 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 2742-C-3011 | PL-G | 3BH1 (TERRACE of 3) Plans and Elevations | | --- | --- | --- | | 2742-C-3061.1 | PL-C | 4BH3 Plans and Elevations | | 2742-C-3062 | PL-D | 4BH3 Plans and Elevations | | 2742-C-3065 | PL-D | 4BH4 Plans and Elevations | | 2742-C-3066 | PL-C | 4BH4 Plans and Elevations | | 2742-C-3070 | PL-D | 4BH6 Plans and Elevations | | 2742-C-3070.1 | PL-E | 4BH6 Plans and Elevations | | 2742-C-3071 | PL-D | 4BH6 Plans and Elevations | | 2742-C-3075 | PL-F | 4BH7 Plans and Elevations | | 2742-C-3085 | PL-B | 3BH1 + 2BH2 (TERRACE of 3) Plans and Elevations | | 2742-C-3090 | PL-B | 3BH2 + 2BH2 (TERRACE of 4) Plans and Elevations | | 2742-C-3095 | PL-C | 3BH2 ALT + 3BH1 (TERRACE of 3) Plans and Elevations | | 2742-C-3200 | PL-C | 2BH-AFF (SEMI) Plans and Elevations | | 2742-C-3200.1 | PL-C | 2BH-AFF (SEMI) Plans and Elevations |

Page 60 · Chunk 738 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 60 Appeal Decision APP/F3545/W/22/3297751

Page 61 · Chunk 739 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 | 2742-C-3201 | PL-C | 2BH-AFF1 (TERRACE of 3) Plans and Elevations | | --- | --- | --- | | 2742-C-3201.1 | PL-C | 2BH-AFF1 (TERRACE of 3) Plans and Elevations | | 2742-C-3202 | PL-B | 2BH-AFF1 (TERRACE of 4) Plans and Elevations | | 2742-C-3220 | PL-C | 3BH-AFF1 + 2BH-AFF1 (TERRACE of 3) Plans and Elevations | | 2742-C-3221 | PL-C | 3BH-AFF1 + 2BH-AFF1 (TERRACE of 4) Plans and Elevations | | 2742-C-3221.1 | PL-C | 3BH-AFF1 + 2BH-AFF1 (TERRACE of 4) Plans and Elevations | | 2742-C-3225 | PL-C | 4BH-AFF2 (SEMI) Plans and Elevations | | 2742-C-3230 | PL-B | 3BH-AFF2 (SEMI) Plans and Elevations | | 2742-C-3231 | PL-C | 3BH-AFF2 (SEMI) Plans and Elevations | | 2742-C-3232 | PL-B | 3BH-AFF2 (TERRACE of 3) Plans and Elevations | | 2742-C-3235 | PL-C | 3BB-AFF-W Plans and Elevations | | 2742-C-3300 | PL-D | 2BFOG1 Plans and Elevations | | 2742-C-3305 | PL-C | 2BFOG2 + 3BH3 (TERRACE) Plans and Elevations | | 2742-A-3307 | PL-B | 3BH4 + 2BFOG2 + 3BH3 (TERRACE) Plans | | 2742-C-3308 | PL-B | 3BH4 + 2BFOG2 + 3BH3 (TERRACE) Elevations | | 2742-A-3500 | PL-C | Private Flat Block Plans | | 2742-C-3501 | PL-C | Private Flat Block Elevations | | 2742-A-3515 | PL-C | Affordable Flat Block Plans |

Page 61 · Chunk 740 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan | 2742-C-3201 | PL-C | 2BH-AFF1 (TERRACE of 3) Plans and Elevations | | --- | --- | --- | | 2742-C-3516 | PL-C | Affordable Flat Block Elevations | | 2742-A-3550 | PL-C | Garage Types 1, 2, and 3 Plans and Elevations | | 2742-A-3551 | PL-B | Garage Type 4 and Cycle/ Bin Store Plans and Elevations | | 2742-A-3552 | PL-A | Cycle Store and Bin Store Plans and Elevations | | 70055213-SK-010 | F | Proposed Southern Site Entrance | | 70055213-SK-011 | H | Proposed Northern Site Access (50m ICD Roundabout) | | 70055213-SK-020 | B | Pedestrian / Cycle Route From Phase 1 To Existing Subway | | 70055213-SK-021 | F | Pedestrian / Cycle Route From Green Lane And Phase 1 To Crossing Of A143 Bury Road | | 70055213-SK-034 | B | Orttewell Road Footway/Cycleway Option | | 70055213-SK-040 | A | Bridleway BR5 Upgrade - Pedestrian Crossing | | 70055213-SK-066 | A | Northgate Roundabout / Indicative S278 Works to Compiegne Way Approach | | 70055213-SK-067 | - | East Barton Road Traffic Calming Locations |

Page 61 · Chunk 741 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 61

Page 61 · Chunk 742 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan https://www.gov.uk/planning-inspectorate 61

Page 62 · Chunk 743 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Appeal Decision APP/F3545/W/22/3297751 APPEARANCES FOR THE LOCAL PLANNING AUTHORITY: Edward Grant, Counsel (of Cornerstone Barristers) instructed by Claire Riches, Solicitor to West Suffolk Council He called -Julie Barrow, Principal Planning Officer at WSC (albeit her planning evidence was unheard due to disputed matters having been resolved by that stage in the Inquiry FOR THE RULE 6 PARTY: Michael Bedford, KC (of Cornerstone Barristers) instructed by Tim Ryder, Head of Legal at Suffolk County Council He called -Neil Mc Manus, Development Contributions Manager at SCC -James Cutting, Head of Growth, Highways & Infrastructure at SCC (albeit his planning evidence was also unheard for the above reason) FOR THE APPELLANT: Sasha White and Kimberley Ziya (of Landmark Chambers) instructed by Matthew Hare RTPI of Carter Jonas He called -Matthew Hare, Planning Consultant at Carter Jonas -Jonathon Reynolds, SLR DOCUMENTS SUBMITTED AT THE INQUIRY 1 Opening case for the appellant, 13 September 2 Opening submissions for WSC, the LPA, 13 September 3 List of appearances (at the start of the Inquiry) for WSC 4 Opening statement for SCC, the LHA 5 Further Addendum to the Statement of Common Ground regarding the Round Table Session on

Page 62 · Chunk 744 Nick Fagan

Land North East of Bury St Edmunds, Bury St Edmunds, IP31 2SJ — West Suffolk — Nick Fagan Indoor Sports Facilities, as dated 14 September 6 Position Statement regarding latest draft of the S106, Town Legal (solicitor to the appellant), as at 26 September 7 S106, signed and dated 7 October 2022 8 Joint CIL Compliance Statement by WSC & SCC (v5),26 September 9 Supporting Information regarding the above, 26 September 10 List of updated agreed conditions (v3), 26 September 11 Rebuttal Proof of Evidence by Julie Barrow to the Proof of Steven Sensecall in respect of residual planning points, 21 September 12 Email exchange between Mark Norman of National Highways (NH) and Luke Barber of SCC confirming that NH has no objection to the granting of planning permission now, dated 20 September 13 Closing statement of SCC, 27 September 14 Closing statement of WSC, 27 September 15 Revised Closing Statement of appellant, 27 September https://www.gov.uk/planning-inspectorate 62

Extracted from the decision letter PDF and shown in full, chunk by chunk.

Main issues and findings

Planning obligations
For appellant

The parties agreed on the necessary infrastructure requirements, including highway and public transport improvements, and the appellant has committed to paying for the necessary works.

Highway safety
For appellant

The parties agreed on the necessary highway and public transport improvements, and the appellant has committed to paying for the necessary works.

Heritage impact
For appellant

There is no compelling evidence or information that the proposed development would adversely affect any heritage assets; indeed, there is agreement between the LPA and appellant that it would not and that it would satisfy the two statutory requirements in regard to the preservation or enhancement of listed buildings, their settings or buildings or land in Conservation Areas.

Ecology and biodiversity
For appellant

There is no compelling evidence or information that the proposed development would adversely affect these designated ecological sites.

Affordable housing
For appellant

The proposed development would deliver up to 1,375 dwellings, which would include 30% affordable housing, with 80% at affordable rents and 20% as intermediate units including shared ownership.

Other
For appellant

The parties agreed on the necessary highway and public transport improvements, and the appellant has committed to paying for the necessary works.

Policies relied on

Reference Weight
NPPF 208
Determinative
St Edmundsbury Core Strategy adopted December 2010
Substantial
Bury St Edmunds Vision 2031 adopted September 2014
Substantial
Joint Development Management Document adopted February 2015
Substantial
Great Barton Neighbourhood Plan made June 2021
Moderate

Site constraints from the Casework Database

Conservation area
Green belt
Listed building setting
AONB
SSSI
Flooding an issue

Source

Decision letter, 62 pages, issued by the Planning Inspectorate on 13 October 2022 under the Open Government Licence.