73 King Edward Road, BARNET, EN5 5AU
London Borough of Barnet — appeal dismissed
- Outcome
- Dismissed
- Decision date
- 28 June 2022
- Authority
- London Borough of Barnet
- Inspector
- Scott A
- Procedure
- Written Representations
- Casework type
- Planning Appeal
- Type detail
- Planning Appeals - Full
- Development type
- Minor Dwellings
- Appellant
- Mr . Moore
- Agent
- UPP Architects + Town Planners
- LPA reference
- 21/4418/FUL
- ONS LPA code
- E09000003
- Jurisdiction
- Transferred
- Link status
- Not Linked
- Start date
- 15 February 2022
Summary AI
The costs application was dismissed as the applicant did not demonstrate unreasonable behaviour by the Council that resulted in unnecessary or wasted expense.
PDF text
73 King Edward Road, BARNET, EN5 5AU — London Borough of Barnet — Costs Decision Site visit made on 1 June 2022 by Alison Scott BA(Hons) DipTP MRTPI an Inspector appointed by the Secretary of State Decision date: 28th June 2022 Costs application in relation to Appeal Ref: APP/N5090/W/21/3287229 73 King Edward Road, Barnet EN5 5AU • The application is made under the Town and Country Planning Act 1990, sections 78, 322 and Schedule 6, and the Local Government Act 1972, section 250(5). • The application is made by Mr Moore for a full award of costs against The London Borough of Barnet Council. • The appeal was against the refusal of planning permission for The demolition of the Existing Property and Provision of Two Residential Dwellings with Associated Amenity Space, Car Parking, Cycle and Waste Storage. Decision 1. The award for costs is dismissed. Reasons 2. Paragraph 30 of the national Planning Practice Guidance (the PPG) advises that, irrespective of the outcome of the appeal, costs may be awarded where a party has behaved unreasonably, and that unreasonable behaviour has directly caused another party to incur unnecessary or wasted expense in the appeal process. 3.
73 King Edward Road, BARNET, EN5 5AU — London Borough of Barnet — Costs Decision The Applicant submits that the Council has acted unreasonably by failing to take into account the results of the Daylight Assessment submitted with the appeal, and therefore there is no sound justification to refuse the development on that ground. 4. They point to the proposal meeting BRE guidance and therefore adequate natural light levels would be received to the habitable rooms on the second floors of both proposed dwellings. Therefore, it would not be contrary to local policy as it would not lead to an unacceptable impact on the living conditions of the potential occupants. 5. It is worth noting that the Council made their assessment on the proposal based on the information before them that did not include a daylight report. 6. Despite the outcome of this report, the Council continue to argue that the minimum standard of glazing has not been met to specific rooms in accordance with advice contained in the Sustainable Design and Construction Supplementary Planning Document 2016 (SPD). 7. They may not have offered any substantial comment relating to outlook within their Delegated Report other than referring to the SPD whereby ‘the glazing to https://www.gov.uk/planning-inspectorate
73 King Edward Road, BARNET, EN5 5AU — London Borough of Barnet — Costs Decision Costs Decision APP/N5090/W/21/3287229 all habitable rooms should not be less than 20% of the internal floor area of the room’ and ‘they should have a reasonable outlook with clear glass’. 8. Even so, they are nevertheless aware that their Residential Design Guidance Supplementary Planning Document 2016 specifically explains that ‘All habitable rooms should contain at least one main window with an adequate outlook’. 9. Despite the findings of the daylight report, and irrespective of whether or not all bedrooms meet or do not meet the required minimum threshold of 20% glazing, in the fullness of safeguarding the living conditions of potential occupants to satisfy Council policy and guidance, I am not of the view that this proposal reflects acceptable outlook from habitable rooms on the second floor. 10. Having been referred to both SPD’s as part of the appeal evidence to which I apply significant weight, and having exercised my own planning judgement, my own conclusion corresponds with the Council’s decision on this matter. 11. Therefore, the Council were not unreasonable in reaching their conclusion that the proposal would have an unacceptable impact on the living conditions of the future occupants 12.
73 King Edward Road, BARNET, EN5 5AU — London Borough of Barnet — Costs Decision To this end, none of the types of behaviour which may give rise to a substantive award under the PPG have been established, based on the above. I conclude that no unreasonable behaviour resulting in unnecessary or wasted expense, as described in the PPG, has been demonstrated.
73 King Edward Road, BARNET, EN5 5AU — London Borough of Barnet — Alison Scott INSPECTOR https://www.gov.uk/planning-inspectorate 2
Main issues and findings
Living conditions Against appellant ¶10
The inspector considered the Council's decision to be reasonable, despite the findings of the daylight report, due to the safeguarding of living conditions for potential occupants.
Living conditions For appellant ¶4
The applicant argued that the proposal would provide adequate natural light levels, meeting BRE guidance and local policy.
Living conditions Against appellant ¶9
The inspector was not of the view that the proposal reflected acceptable outlook from habitable rooms on the second floor.
Living conditions Against appellant ¶11
The Council's decision was upheld by the inspector, who considered that the proposal would have an unacceptable impact on living conditions.
Policies relied on
| Reference | Weight |
|---|---|
| NPPF 208 |
Substantial |
| Local Plan D1 |
Moderate |
| Sustainable Design and Construction Supplementary Planning Document 2016 |
Moderate |
| Residential Design Guidance Supplementary Planning Document 2016 |
Moderate |
Site constraints from the Casework Database
Source
Decision letter, 2 pages, issued by the Planning Inspectorate on 28 June 2022 under the Open Government Licence.