Case 3284469

Pestles Hall Farm, Crow Lane, Tendring, CLACTON-ON-SEA, CO16 9AW

Tendring District Council — appeal dismissed

Outcome
Dismissed
Decision date
3 March 2023
Authority
Tendring District Council
Inspector
Simpson L
Procedure
Written Representations
Casework type
Planning Appeal
Type detail
Planning Appeals - Full
Development type
Change of use
Appellant
Maviton Ltd
Agent
Stanfords
LPA reference
21/00236/COUNOT
ONS LPA code
E07000076
Jurisdiction
Transferred
Link status
Not Linked
Start date
8 February 2022

Summary AI

The inspector dismissed the appeal due to the proposal not meeting the requirements for permitted development under Class Q of the GPDO. The existing building would require significant and transformative works, making it not a conversion. This decision is based on the Hibbitt Judgement and the National Planning Practice Guidance.

Generated from the decision letter — check against the original before relying on it.

PDF text

Page 1 · Chunk 0 Appeal Decision

Pestles Hall Farm, Crow Lane, Tendring, CLACTON-ON-SEA, CO16 9AW — Tendring District Council — Appeal Decision Site visit made on 14 February 2023 by Luke Simpson BSc MSc MRTPI an Inspector appointed by the Secretary of State Decision date: 3rd March 2023 Appeal Ref: APP/P1560/W/21/3284469 Pestles Hall Farm, Crow Lane, Weeley CO16 9AW • The appeal is made under section 78 of the Town and Country Planning Act 1990 against a refusal to grant approval required under Schedule 2, Part 3, Class Q of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). • The appeal is made by Maviton Ltd against the decision of Tendring District Council. • The application Ref 21/00236/COUNOT, dated 10 February 2021, was refused by notice dated 8 April 2021. • The development proposed is Conversion of agricultural building into a dwelling. Decision 1. The appeal is dismissed. Background and Main Issue 2. Class Q (a) of Part 3 of Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015 (the GPDO) permits the change of use of a building and any land within its curtilage from a use as an agricultural building to a use falling within Class C3 (dwellinghouses) of the Schedule to the Use Classes Order.

Page 1 · Chunk 1 Appeal Decision

Pestles Hall Farm, Crow Lane, Tendring, CLACTON-ON-SEA, CO16 9AW — Tendring District Council — Appeal Decision Class Q (b) permits building operations reasonably necessary to convert the building referred to in (a) above. 3. The evidence before me indicates that the Council contends that the building operations would not comprise a conversion. Whilst the Council has referred to paragraphs Q.1 and Q.2, the question of whether a proposal comprises a conversion for the purposes of Class Q precedes any consideration of matters set out under these paragraphs. 4. Indeed, the appellant has cited the judgement in Hibbitt and another v Secretary of State for Communities and Local Government and Rushcliffe Borough Council [2016] EWHC 2853 (Admin). Paragraph 26 of that judgement states: ‘First, the concept of “conversion” is found in the overarching provisions of Class Q (not in Q.1) and it thereby introduces a discrete threshold issue such that if a development does not amount to a “conversion” then it fails at the first hurdle and there is no need to delve into the exceptions in Q.1. It is thus a freestanding requirement that must be met irrespective of anything in Q.1…’ 5.

Page 1 · Chunk 2 Appeal Decision

Pestles Hall Farm, Crow Lane, Tendring, CLACTON-ON-SEA, CO16 9AW — Tendring District Council — Appeal Decision The main issue in this appeal is therefore whether the proposed change of use and building operations would be permitted development under Schedule 2, Part 3, Class Q of the GPDO and in particular, whether the development would comprise a conversion. https://www.gov.uk/planning-inspectorate

Page 1 · Chunk 3 Appeal Decision

Pestles Hall Farm, Crow Lane, Tendring, CLACTON-ON-SEA, CO16 9AW — Tendring District Council — Appeal Decision The main issue in this appeal is therefore whether the proposed change of use and building operations would be permitted development under Schedule 2, Part 3, Class Q of the GPDO and in particular, whether the development would comprise a conversion. https://www.gov.uk/planning-inspectorate

Page 2 · Chunk 4 Appeal Decision

Pestles Hall Farm, Crow Lane, Tendring, CLACTON-ON-SEA, CO16 9AW — Tendring District Council — Appeal Decision Appeal Decision APP/P1560/W/21/3284469 Reasons 6. The existing building comprises an agricultural barn which is predominantly open on three sides. As a result, three completely new exterior would be required. In addition, the evidence before me indicates that the existing roof sheets would be replaced. The submitted plans also show that the side of the building, which is currently walled, would be completely re-clad. 7. In essence, there would be very little remaining of the existing agricultural building other than its structural components (steel frame and foundations) and overall dimensions. The appellant has suggested that this is inevitable with most conversions, given the requirements of building regulations. I accept that conversions often require relatively extensive operational works, such as those listed under GPDO Paragraph Q.1(i). However, as indicated in the Hibbitt Judgement, there must be a point where operational works stop comprising a conversion and start comprising a new building.

Page 2 · Chunk 5 Appeal Decision

Pestles Hall Farm, Crow Lane, Tendring, CLACTON-ON-SEA, CO16 9AW — Tendring District Council — Appeal Decision In this particular case, the limited physical extent of the original building combined with the great physical extent of the operational works required, tip the proposal well beyond the upper threshold of what could reasonably be considered to be a ‘conversion’. 8. The appellant implies that because the operational works all comprise building operations listed at Paragraph Q1.(i) they must therefore amount to a conversion. However, if one were to apply that logic then a change from a steel frame to a dwelling would be a ‘conversion’, with walls, doors, a roof and windows all added under permitted development rights. Clearly that is not the intention of the GPDO. Indeed, the National Planning Practice Guidance outlines that it is only where the existing building is already suitable for conversion to residential use that the building would be considered to have the permitted development right under Class Q. 9. Even if I were to accept that the existing building is structurally sound and ‘capable’ of conversion in that regard (as asserted in the appellant’s structural survey1) this consideration alone is not sufficient to determine that the proposal comprises a conversion.

Page 2 · Chunk 6 Appeal Decision

Pestles Hall Farm, Crow Lane, Tendring, CLACTON-ON-SEA, CO16 9AW — Tendring District Council — Appeal Decision Indeed, whilst the structural integrity of the building is a relevant factor2, it is not the only factor in considering whether a proposal amounts to a conversion as is made clear in the Hibbitt Judgement. 10. The appellant suggests that the Council has taken a different approach to other applications for prior approval. However, I have not been provided with the full details of any such decisions and as such this consideration has no bearing on my findings. In any case, whether or not a proposal comprises a conversion will depend on the precise characteristics of the existing building and the scope of operational works proposed. These are both largely unique considerations. 1 Edward Parsely Associates Ltd, February 2022 2 As indicated in the National Planning Practice Guidance https://www.gov.uk/planning-inspectorate 2

Page 3 · Chunk 7 Appeal Decision

Pestles Hall Farm, Crow Lane, Tendring, CLACTON-ON-SEA, CO16 9AW — Tendring District Council — Appeal Decision Appeal Decision APP/P1560/W/21/3284469 Conclusion 11. Even if it is structurally sound, the existing building would require significant and transformative works to the extent that very little of it would remain and very significant physical components would be added. As such, the proposal does not comprise a conversion and it would not be permitted development under the provisions of Class Q. 12. The appeal is therefore dismissed.

Page 3 · Chunk 8 Luke Simpson

Pestles Hall Farm, Crow Lane, Tendring, CLACTON-ON-SEA, CO16 9AW — Tendring District Council — Luke Simpson INSPECTOR https://www.gov.uk/planning-inspectorate 3

Extracted from the decision letter PDF and shown in full, chunk by chunk.

Main issues and findings

Planning obligations
Against appellant
¶4

The inspector considered whether the proposed change of use and building operations would be permitted development under Schedule 2, Part 3, Class Q of the GPDO, and determined that they would not meet the requirements for a conversion.

Planning obligations
Against appellant
¶5

The inspector accepted that conversions often require relatively extensive operational works, but determined that the proposal went beyond the threshold of what could reasonably be considered a conversion due to the limited physical extent of the original building and the great physical extent of the operational works required.

Planning obligations
Against appellant
¶9

The inspector considered that the structural integrity of the building was a relevant factor, but not the only factor in determining whether a proposal amounts to a conversion, and determined that the proposal did not meet the requirements for a conversion.

Planning obligations
Against appellant
¶11

The inspector concluded that the proposal did not comprise a conversion and would not be permitted development under the provisions of Class Q, and therefore dismissed the appeal.

Policies relied on

Reference Weight
NPPF 208
Moderate
Local Plan D1
Moderate
Hibbitt Judgement
Determinative
National Planning Practice Guidance
Determinative

Site constraints from the Casework Database

Conservation area
Green belt
Listed building setting
AONB
SSSI
Flooding an issue

Source

Decision letter, 3 pages, issued by the Planning Inspectorate on 3 March 2023 under the Open Government Licence.