Case 3273409

Land at Long Causeway, Cliviger, Burnley, Lancs, BB10 4RP

Burnley Borough Council — appeal dismissed

Outcome
Dismissed
Decision date
24 March 2022
Authority
Burnley Borough Council
Inspector
Harbottle M
Procedure
Hearing
Casework type
Planning Appeal
Type detail
Planning Appeals - Full
Development type
Minor general industry/storage/warehousing
Appellant
Mr Robert Banham
Agent
Mr Steven Hartley
LPA reference
FUL/2020/0564
ONS LPA code
E07000117
Jurisdiction
Transferred
Link status
Not Linked
Start date
21 June 2021

Summary AI

The appeal against the refusal of planning permission for an agricultural building was allowed because the Council was unreasonable in refusing the application based on engineered land changes not included in the planning application.

Generated from the decision letter — check against the original before relying on it.

PDF text

Page 1 · Chunk 0 Costs Decision

Land at Long Causeway, Cliviger, Burnley, Lancs, BB10 4RP — Burnley Borough Council — Costs Decision Hearing Held on 15 February 2022 Site visit made on 16 February 2022 by Mark Harbottle BSc MRTPI an Inspector appointed by the Secretary of State Decision date: 24 March 2022 Costs application in relation to Appeal Ref: APP/Z2315/W/21/3273409 Land at Long Causeway, Cliviger, Burnley BB10 4RP • The application is made under the Town and Country Planning Act 1990, sections 78, 322 and Schedule 6, and the Local Government Act 1972, section 250(5). • The application is made by Mr Robert Banham for a partial award of costs against Burnley Borough Council. • The hearing was in connection with an appeal against the refusal of planning permission for an agricultural building. Decision 1. The application for a partial award of costs is allowed in the terms set out below. The submissions for Mr Robert Banham 2. The partial award of costs is sought in respect of the Council’s second ground of refusal, which is concerned with the engineered land changes that have formed a plateau which the proposed agricultural building would stand on. 3. The ground of refusal is vague but states that insufficient evidence has been produced regarding the engineered land changes for the Council to make a sound judgement.

Page 1 · Chunk 1 Costs Decision

Land at Long Causeway, Cliviger, Burnley, Lancs, BB10 4RP — Burnley Borough Council — Costs Decision The Council has not produced evidence of this work or why it considers it to be development requiring an express grant of planning permission, neither has it taken enforcement action against it. 4. The application was for an agricultural building and not for any changes to land levels unless shown on the submitted plans. The existing and proposed land levels on those plans are shown to be the same and could have been checked as part of the Council’s site visit. It was therefore unreasonable for the Council to conclude that it had insufficient evidence. The response by Burnley Borough Council 5. It had been clearly identified in correspondence that the engineered land changes were development requiring an express grant of planning permission and that they should have been included in the planning application. The ground of refusal was correct and sound in reiterating this. 6. The description of the proposed development in the application form referred to the erection of an agricultural building but did not refer to the engineered land changes. No details of the previous land levels were included. https://www.gov.uk/planning-inspectorate

Page 2 · Chunk 2 Costs Decision

Land at Long Causeway, Cliviger, Burnley, Lancs, BB10 4RP — Burnley Borough Council — Costs Decision Costs Decision APP/Z2315/W/21/3273409 Reasons 7. The Planning Practice Guidance (the PPG) advises that costs may be awarded if a party has behaved unreasonably, and so has directly caused another party to incur unnecessary or wasted expense in the appeal process. 8. While the Council may hold genuine concerns about the engineered land changes and may yet decide to take enforcement action as a result, they were, as it has indicated, not part of the planning application. Accordingly, it was not reasonable for the engineered land changes to form the basis of a ground of refusal of the separate development comprising the agricultural building. Costs Order 9. In exercise of the powers under section 250(5) of the Local Government Act 1972 and Schedule 6 of the Town and Country Planning Act 1990 as amended, and all other enabling powers in that behalf, IT IS HEREBY ORDERED that Burnley Borough Council shall pay to Mr Robert Banham the costs of the appeal proceedings described in the heading of this decision limited to those costs incurred in respect of the second ground of refusal; such costs to be assessed in the Senior Courts Costs Office if not agreed. 10.

Page 2 · Chunk 3 Costs Decision

Land at Long Causeway, Cliviger, Burnley, Lancs, BB10 4RP — Burnley Borough Council — Costs Decision The applicant is now invited to submit to Burnley Borough Council, to whom a copy of this decision has been sent, details of those costs with a view to reaching agreement as to the amount.

Page 2 · Chunk 4 Mark Harbottle

Land at Long Causeway, Cliviger, Burnley, Lancs, BB10 4RP — Burnley Borough Council — Mark Harbottle INSPECTOR https://www.gov.uk/planning-inspectorate 2

Extracted from the decision letter PDF and shown in full, chunk by chunk.

Main issues and findings

Green belt
For appellant
¶2

The Council's ground of refusal was vague and based on insufficient evidence, as no details of the previous land levels were included in the planning application.

Housing land supply
Against appellant
¶5

The Council had previously identified that the engineered land changes were development requiring an express grant of planning permission, and the proposed development was for an agricultural building, not for land level changes.

Policies relied on

Reference Weight
Planning Practice Guidance (PPG)
Determinative

Site constraints from the Casework Database

Conservation area
Green belt
Listed building setting
AONB
SSSI
Flooding an issue

Source

Decision letter, 2 pages, issued by the Planning Inspectorate on 24 March 2022 under the Open Government Licence.