Case 3268570

9, Mackintosh Lane, Hackney, London, E9 6AB

London Borough of Hackney — appeal allowed

Outcome
Allowed
Decision date
1 October 2021
Authority
London Borough of Hackney
Inspector
Greenwood L
Procedure
Written Representations
Casework type
Planning Appeal
Type detail
Planning Appeals - Full
Development type
Change of use
Appellant
Ms E Sykora
Agent
RJS Planning
LPA reference
2020/3534
ONS LPA code
E09000012
Jurisdiction
Transferred
Link status
Not Linked
Start date
9 July 2021

Summary AI

The appeal for a dog day care use on a backland site in Hackney was allowed due to its substantial benefits, including the creation of 7 full-time jobs and economic growth. The proposal's limited conflict with the development plan was outweighed by these benefits.

Generated from the decision letter — check against the original before relying on it.

PDF text

Page 1 · Chunk 0 Appeal Decision

9, Mackintosh Lane, Hackney, London, E9 6AB — London Borough of Hackney — Appeal Decision Site visit made on 6 September 2021 by Les Greenwood MRTPI an Inspector appointed by the Secretary of State Decision date: 01 October 2021 Appeal Ref: APP/U5360/W/21/3268570 9 Mackintosh Lane, Hackney, London E9 6AB • The appeal is made under section 78 of the Town and Country Planning Act 1990 against a refusal to grant planning permission. • The appeal is made by Ms E Sykora against the decision of the Council of the London Borough of Hackney. • The application Ref 2020/3534, dated 16 November 2020, was refused by notice dated 11 January 2021. • The development proposed is the change of use of part of existing storage premises to dog day care use. Decision 1. The appeal is allowed and planning permission is granted for the change of use of part of existing storage premises to dog day care use in accordance with the terms of the application Ref 2020/3534, dated 16 November 2020, subject to the following conditions: 1) The development hereby permitted shall be carried out in accordance with the following approved plans: 310_SL_01, 310_EX_01, 310_BL_01, 310_PR_01 and 310_PR_02.

Page 1 · Chunk 1 Appeal Decision

9, Mackintosh Lane, Hackney, London, E9 6AB — London Borough of Hackney — Appeal Decision 2) No dogs shall be kept at the site outside of the following hours: - 08:00 to 19:00 Mondays to Fridays and - 08:00 to 16:00 Saturdays; and no dogs shall be kept at the site on Sundays and Bank Holidays. Procedural matters 2. The appeal application was retrospective as the change of use had already taken place. I saw the dog day care business in operation on my site visit. 3. Since the Council refused this application the London Plan 2021 (LP) has been adopted, taking the place of the London Plan 2016, and a revised version of the National Planning Policy Framework (the Framework) has been published. The appellant and the Council were both given an opportunity to comment on these new policies, which I have considered as part of this decision. https://www.gov.uk/planning-inspectorate

Page 2 · Chunk 2 Appeal Decision

9, Mackintosh Lane, Hackney, London, E9 6AB — London Borough of Hackney — Appeal Decision Appeal Decision APP/U5360/W/21/3268570 Main issue 4. The main issue is the effect of the proposal on the supply of industrial use floorspace within the Homerton Priority Industrial Area (PIA), as designated in the Hackney Local Plan 2033 (HLP), and the Borough as a whole. Reasons 5. The appeal site is in a backland position within a densely built up mixed use area including industrial, commercial and residential uses and a rail line. The site was apparently part of a somewhat larger site that was used for storage and industrial purposes. Workshops have been retained on the frontage, outside of the appeal site. The dog day care business takes up the open space at the back, including 2 previously existing storage containers which have been refurbished and converted to create space for the dogs and employees. 6. HLP Policy LP26E supports industrial uses within the PIAs. HLP Policy LP26B allows for redevelopment of sites within PIAs where, amongst other things, it maximises the delivery of employment floorspace by maintaining, re-providing or intensifying the existing industrial uses. Employment floorspace is narrowly defined here to include just that in industrial and storage uses.

Page 2 · Chunk 3 Appeal Decision

9, Mackintosh Lane, Hackney, London, E9 6AB — London Borough of Hackney — Appeal Decision In this case, the appeal development has changed the use of the 2 storage containers, amounting to the loss of about 34 sqm of storage floorspace. To that very limited extent, the appeal proposal conflicts with the specific text of Policy LP28B and the more general aim of Policy LP26E. I see no clear policy objection to the associated change of use of the open yard as this has not prejudiced the continuing use of the workshops on the road frontage. 7. On the other hand, the Framework states that planning decisions should help create the conditions in which businesses can invest, expand and adapt, with significant weight placed on the need to support economic growth and productivity. The appellant states that the dog day care use provides up to 7 full-time jobs and this is not disputed by the Council. The site is not well positioned for any similar intensity of industrial or storage use due to its poor access situation. Road access is through narrow, heavily used streets. There is no vehicular access to the backland appeal site, which is only reached by a narrow walkway. 8.

Page 2 · Chunk 4 Appeal Decision

9, Mackintosh Lane, Hackney, London, E9 6AB — London Borough of Hackney — Appeal Decision This business therefore makes good use of the site to provide a high intensity use with more jobs than would be reasonably be expected if the site returned to use as a storage yard, either on its own or in association with industrial use of the adjacent workshops. No doubt the dog day care business also brings wider benefits to the local economy through provision of a useful service. 9. Section 38(6) of the Planning and Compulsory Purchase Act 2004 sets out that determination must be made in accordance with development plan unless material considerations indicate otherwise. In this case I find there to be some limited and technical conflict with the development plan in terms of HLP Policies LP26 and LP28 due to the loss of a small amount of industrial/storage floorspace. I furthermore find, however, that this conflict is clearly and convincingly outweighed by the substantial benefits of the proposal, which accord with the more general economic aims of the Framework. I therefore conclude that the proposal would not have any undue or unjustified negative https://www.gov.uk/planning-inspectorate 2

Page 3 · Chunk 5 Appeal Decision

9, Mackintosh Lane, Hackney, London, E9 6AB — London Borough of Hackney — Appeal Decision Appeal Decision APP/U5360/W/21/3268570 impact on the supply of industrial use floorspace within the PIA and the Borough. 10. As the proposal has already begun, there is no need for the standard condition requiring a start within 3 years. I impose a condition specifying the relevant plans to provide certainty. Given the close proximity of the site to residential properties and the potential for noise from the dogs, a condition limiting the use to the stated opening hours is necessary to protect neighbours’ living conditions. A condition requiring the use of matching materials is not necessary as the containers are acceptable as they stand and this permission does not provide for any further building work. 11. For the reasons set out above, and having regard to all other matters raised, I conclude that the appeal should succeed.

Page 3 · Chunk 6 Les Greenwood

9, Mackintosh Lane, Hackney, London, E9 6AB — London Borough of Hackney — Les Greenwood INSPECTOR https://www.gov.uk/planning-inspectorate 3

Extracted from the decision letter PDF and shown in full, chunk by chunk.

Main issues and findings

Flood risk
Neutral
¶9

The inspector noted that the development plan has some technical conflict with the proposal, but found this to be outweighed by the benefits of the proposal.

Green belt
Neutral
¶9

The inspector noted that the development plan has some technical conflict with the proposal, but found this to be outweighed by the benefits of the proposal.

Housing land supply
For appellant
¶8

The inspector found that the proposal makes good use of the site and provides a high intensity use with more jobs than would be reasonably expected if the site returned to use as a storage yard.

Policies relied on

Reference Weight
HLP Policy LP26E
Moderate
HLP Policy LP26B
Moderate
LP28B
Limited
The Framework
Determinative

Site constraints from the Casework Database

Conservation area
Green belt
Listed building setting
AONB
SSSI
Flooding an issue

Source

Decision letter, 3 pages, issued by the Planning Inspectorate on 1 October 2021 under the Open Government Licence.